Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has been utilized to examine the foremost group of risk factors by Mean Score Technique (MS) and ranking from top to bottom. The risk factors of tendering phase analysis by using relative Importance Index (RII) method then ranking from top to bottom using their values. Consequences of this research article assessed that the technical criterion is the most efficient criteria at last, management criteria with all risk factors that showed in this research will be considered.