Excessive torque and drag can be critical limitation during drilling highly deviated oil wells. Using the modeling is regarded as an invaluable process to assist in well planning and to predict and prevent drilling problems. Identify which problems lead to excessive torque and drag to prevent cost losses and equipment damage. Proper modeling data is highly important for knowing and prediction hole problems may occur due to torque and drag and select the best method to avoid these problems related to well bore and drill string. In this study, Torque and drag well plan program from landmark worldwide programming group (Halliburton Company) used to identify hole problems.one deviated well in Zubair oil fields named, ZB-250 selected for analyses the effect of friction factor on torque and effective `tension of the drill string along well depth, moreover the effect of well bore problems such as; mud losses, accumulation of cutting bed in the well bore, stuck pipe, caving, sloughing, high torque and drag values on drill string components and well trajectory. Wells data which include hole section size, mud properties, well profile survey, casing string depth, rig specification, drill string components, drilling parameters like weight on bit, rotary speed and flow rate were used to compare between planning and drilling stages for these wells and identify the reasons of difference between these stages. The results showed a difference for the drilling phase and increasable in effective tension, torque, pick up and slack off drag, measured string weight, and possibility to occur the buckling if compare with planning phase. Wellbore instability, high friction factor, high tortuosity, high flow rate ,stuck pipe , excessive drag spot, partial to total losses, increase of drilling parameters, hard formations and bad hole cleaning, all these factors yield to this difference between planning and actual phases. When drilling hole section 8.5", the main causes of varying were drilling fluid losses, high value of friction factor, stuck pipe and friction forces when the maximum torque was (16 to 20 klb-ft) and pick up weight (20-40 klb)
Drag has long been identified as the main reason for the loss of energy in fluid transmission like pipelines and other similar transportation channels. The main contributor to this drag is the viscosity as well as friction against the pipe walls, which will results in more pumping power consumption.
The aim in this study was first to understand the role of additives in the viscosity reduction and secondly to evaluate the drag reduction efficiency when blending with different solvents.
This research investigated flow increase (%FI) in heavy oil at different flow rates (2 to 10 m3/hr) in two pipes (0.0381 m & 0.0508 m) ID By using different additives (toluene and naphtha) with different concent
... Show MoreThe aim of this study is interpretation well logs to determine Petrophysical properties of tertiary reservoir in Khabaz oil field using IP software (V.3.5). The study consisted of seven wells which distributed in Khabaz oilfield. Tertiary reservoir composed from mainly several reservoir units. These units are : Jeribe, Unit (A), Unit (A'), Unit (B), Unit (BE), Unit (E),the Unit (B) considers best reservoir unit because it has good Petrophysical properties (low water saturation and high porous media ) with high existence of hydrocarbon in this unit. Several well logging tools such as Neutron, Density, and Sonic log were used to identify total porosity, secondary porosity, and effective porosity in tertiary reservoir. For
... Show MoreMultiple drilling problems are being faced continuously while drilling wells in the southern Iraqi oil fields. Many of which are handled poorly and inefficiently which yields longer non-productive time due to the lack of knowledge about the source of these problems. This study aims to investigate the Basra oil fields formations from Faris to Mishrif, diagnose the potential problems, and present the optimum treatment for each problem.
Gathering of field data and previous studies on the subject, in addition to the field experience of drilling supervisors were all the information bases of this study. Southern Iraqi oil fields were studied and analyzed care
In oil and gas well cementing, a strong cement sheath is wanted to insure long-term safety of the wells. Successful completion of cementing job has become more complex, as drilling is being done in highly deviated and high pressure-high temperature wells. Use of nano materials in enhanced oil recovery, drilling fluid, oil well cementing and other applications is being investigated. This study is an attempt to investigate the effect of nano materials on oil well cement properties. Two types of nano materials were investigated, which are Nano silica (>40 nm) and Nano Alumina (80 nm) and high sulfate-resistant glass G cement is used. The investigated properties of oil well cement included compressive strength, thickening
... Show MoreExploitation of mature oil fields around the world has forced researchers to develop new ways to optimize reservoir performance from such reservoirs. To achieve that, drilling horizontal wells is an effective method. The effectiveness of this kind of wells is to increase oil withdrawal. The objective of this study is to optimize the location, design, and completion of a new horizontal well as an oil producer to improve oil recovery in a real field located in Iraq. “A” is an oil and gas condensate field located in the Northeast of Iraq. From field production history, it is realized the difficulty to control gas and water production in this kind of complex carbonate reservoir with vertical producer wells. In this study, a horizont
... Show MoreThe productivity of oil wells may be improved by determining the value of enhancing well productivity and the likely reasons or sources of formation damage after the well has been recognized as underperforming. Oil well productivity may be improved, but the economics of this gradual improvement may be compromised. It is important to analyze the influence of the skin effect on the recovery of the reserve.
The acid treatment evaluated for the well AD-12, primarily for the zone Mi4; using a license of Stimpro Stimulation Software to validate the experimental work to the field scale, this software is considered the most comprehensive instrument for planning and monitoring matrix acid treatments and utilizing actual data to prov
... Show More