Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at crisis management, specifically in the basic stages chosen for its development, which are before, during, and after a crisis. Therefore, an effective crisis management system has been developed consisting of 20 critical success factors with devising 59 actions that can be taken for each proposed criterion for each of the three stages of crisis.

Crossref
View Publication
Publication Date
Tue May 16 2023
Journal Name
Political Sciences Journal
Institutional Reality Construction: Principles of its Construction and Functions of Language in its Production; Diplomacy as a Model
...Show More Authors

This study aims to answer a significant problem of social sciences and philosophy: How do we construct an institutional reality such as diplomacy with an objective recognizable existence? The study assumes that the ability to build institutional reality is based on our biological capacity, as it takes different forms in all the institutions we construct. The study takes the theory of the American philosopher John Searle as an approach to examining the assumption. The study sums up important findings; cultures, although they share the biological capacity on which they produce institutional realities, differ in the form of the value standards on which the institutional realities are based. The study recommends the need of Arab social resea

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Nov 06 2019
Journal Name
College Of Physical Education And Sports Science
(M.H) electronic system for goalkeepers
...Show More Authors

Publication Date
Fri May 05 2023
Journal Name
International Journal Of Professional Business Review
The Effect of Emotional Intelligence on Manager Performance: a Field Study in the General Authority for Irrigation and Reclamation Projects in Baghdad
...Show More Authors

Purpose: the purpose of this study is to investigate how managers working for the General Authority for Irrigation and Reclamation Projects react to the impact of Emotional Intelligence (EI) on their performance.   Theoretical framework: The current study includes an intellectual framework on two variables, namely EI and Manager Performance (MP), because it is essential to investigate the relationship between these two variables and the impact of EI on MP.   Design/methodology/approach: The research problem is that a manager's capacity to make wise decisions about their work or interactions with subordinates is diminished when they have inadequate EI. The questionnaire is used as a tool for gathering data for the study, and the st

... Show More
View Publication Preview PDF
Scopus (2)
Crossref (2)
Scopus Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman

... Show More
View Publication Preview PDF
Publication Date
Fri Sep 30 2022
Journal Name
International Journal Of Intelligent Systems And Applications In Engineering
Optimizing Methods of Funding Residential Complexes Projects
...Show More Authors

Scopus (3)
Scopus
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Engineering
Intelligence in Construction between Contemporary and Traditional Architecture
...Show More Authors

The authentic traditional architecture proved that it is very convenient to the environmental and social regulations where it appeared and lasted for hundred of years.

This traditional architecture got the intelligence in providing thermal comfort for their occupants by the intelligent usage of the building materials and the intelligent planning and designs which took in consideration the climatic condition and the aerodynamics of the whole city as one ecological system starting from the cold breeze passing through its narrow streets till it enters the dwelling units and glides out through the wind catchers.

This architecture had been neglected and replaced by modern imported architecture which had collap

... Show More
View Publication Preview PDF
Publication Date
Fri Sep 15 2023
Journal Name
Al-academy
Dramatic construction of bullying scenes in animated films
...Show More Authors

Given the importance of the phenomenon of bullying and its spread in the productions of animated films and the resulting impact on them, and the dominance of a large number of satellite channels that simulate different age stages and for both sexes. It is bullying others and their imitation of characters inspired by animated films with aggressive behavior that appears in them by imposing his authority by force on those who are weaker than him and in various methods that fall within the concept of bullying, and the interest of most satellite channels in this type of production that simulates different age groups, this research comes as an attempt A scientific method through which the researcher seeks to know the issue of the dramatic cons

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Journal Of Engineering
Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co