Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at crisis management, specifically in the basic stages chosen for its development, which are before, during, and after a crisis. Therefore, an effective crisis management system has been developed consisting of 20 critical success factors with devising 59 actions that can be taken for each proposed criterion for each of the three stages of crisis.
Financial crisis is one of the topics that have attracted the interest of researchers in recently. The research focused on the issue of the crisis of the Asian Tigers and the mortgage crisis and comparing them in terms of causes and repercussions. It may meet most of the financial crises in many of its causes, factors, roots and results in the advanced and the developing countries. This crisis has its own pattern and its causes and nature and it is characterized by a crisis of cash liquidity and the collapse of many banks and declare bankruptcy and a sharp decline in stock prices and indices of the stock market and so far the common denominators among the causes but does not mean this There are differences between the financial c
... Show MoreThis study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study,
... Show MoreHuge yearly investments were made by organizations for the development and maintenance. However, it has been reported that most of the IT projects fails as it is delayed, over budget and discontinued quality. A systematic literature review (SLR) was conducted to identify the critical success factors (CSFs) for the IT projects. Nine (9) CSFs was identified from the SLR. An online survey was conducted among 103 respondents from developers and IT managers. The data was analyzed using the Statistical Package for Social Science (SPSS 22). The findings showed that the highest CSFs of IT projects is commitment and motivation. Project monitoring was found the lowest score ranked by respondents.
In this work, an efficient energy management (EEM) approach is proposed to merge IoT technology to enhance electric smart meters by working together to satisfy the best result of the electricity customer's consumption. This proposed system is called an integrated Internet of things for electrical smart meter (2IOT-ESM) architecture. The electric smart meter (ESM) is the first and most important technique used to measure the active power, current, and energy consumption for the house’s loads. At the same time, the effectiveness of this work includes equipping ESM with an additional storage capacity that ensures that the measurements are not lost in the event of a failure or sudden outage in WiFi network. Then then these measurement
... Show MoreIn this work, an efficient energy management (EEM) approach is proposed to merge IoT technology to enhance electric smart meters by working together to satisfy the best result of the electricity customer's consumption. This proposed system is called an integrated Internet of things for electrical smart meter (2IOT-ESM) architecture. The electric smart meter (ESM) is the first and most important technique used to measure the active power, current, and energy consumption for the house’s loads. At the same time, the effectiveness of this work includes equipping ESM with an additional storage capacity that ensures that the measurements are not lost in the event of a failure or sudden outage in WiFi network. Then then these
... Show MoreThe study aimed at interpreting the role of architectural design quality in in build competitiveness model in accordance with the proposal included the idea of architectural design quality for its removal; interesting design factors of the environment, good design of the spaces, and design aesthetic explanatory variable. The competitiveness dimensions; the level of innovation, stimulate research, and the quality of the company's products, and activating the role of human resources, entrepreneurship, profitability, market share and competitiveness, variable responsive. The study of construction companies in the Ministry of Housing and Construction has taken the Iraqi society for the study. The sample consisted of (48) manage
... Show MoreThe problem of generated waste as a result of the implementation of construction projects, has been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom
... Show MoreIn the last few years, following the relative stability of the political, economic, and security environments, Iraq has embarked on a transformation towards an ambitious program of automation across various sectors. However, this automation program faces numerous challenges, including significant investments in technology and training, addressing social impacts, and combating widespread illiteracy
Background: War represents a major human crisis; it destroys communities and results in ingrained consequences for public health and well-being
Objective: We set this study to shed light on the public health status in Iraq after the successive wars, sanctions, sectarian conflicts, and terrorism, in light of certain health indicators.
Design: The primary source of data for this analysis comes from the Iraqi Ministry of Health, and The World Health Organization disease surveillance.
Results: Most of the morbidity indicators are high, even those that are relatively declining recently, are still higher than those repor
... Show MoreThe majority of Iraqi translator-student have problems at two main levels: the conceptual level and the productive level. From different perspectives, such problems are either related to ‘language’ or to ‘cognition’. This binary view is an indication to the implicit and interchangeable relationship between language and cognition. The relationship between cognition language and translator starts with the first language and its effect on the Iraqi translators. Identifying the effect is the aim of the present study. It is hypothesized that Iraqi students are negatively influenced by the problems and weaknesses of first language schema. This reflects the major claim and later concludes that first language instruction in the Iraq
... Show More