The pillars of sustainable development are representing the interface between environmental, economic, and social sustainability. Sustainable development is a method of planning and managing construction projects to reduce the effect of the construction process on the environment so that there is a balance between environmental capabilities and the human needs of present and future generations. Usually, Environmental sustainability is most important and effective in construction projects. The environment suffers from significant negative impacts as a result of the implementation of construction projects; therefore, this study aims to identify the effecting factors on environmentally sustainable development. The methodology of this study used fuzzy cognitive maps (FCMs) because of adopted simulation approach, after selecting the factors that have RII more than 65% and determine causal relationship between factors by applying fuzzy logic using MATLAB program. Then the effecting factors were analyzed and ranked by static and dynamic analysis. The results showed the static analysis of effecting factors on ESD in first quarter are characterized by influential and affected by other factors of (ESD), were include (C2.4, C4.6, C1.6, C2.1, C3.3, C3.7, C3.6, C6.2), When comparing between dynamic analysis and RII of the factors, it has been noticed a difference in the importance. This is an essential finding in the understanding that dynamic analysis considers the interactions between factors, while the RII takes the reasons independently and neglects interactions between them. The study has provided recommendations for the application of (FCM) model that was proposed depend on these factors in building projects to improve the environment and reduce its negative effects.
Abstract
This study was to demonstrate the role-use planning scientific methods is disabled and little used in the planning and follow-up construction of vital projects in the province of Baghdad, including network planning methods, in order to find the optimal time to finish the project in light of the resources available and the budget set for it, in the current research has been used the most prominent network planning methods and two stylistic (CPM / PERT), was the application of the critical path method on standard-design school project (traditional) to draw Action Network according to confirmed times for the activities of the project and account his Crashing time , It was Pert technique applied to the project hemato
... Show MoreIn this paper, we introduce three robust fuzzy estimators of a location parameter based on Buckley’s approach, in the presence of outliers. These estimates were compared using the variance of fuzzy numbers criterion, all these estimates were best of Buckley’s estimate. of these, the fuzzy median was the best in the case of small and medium sample size, and in large sample size, the fuzzy trimmed mean was the best.
The concept of environmental debt, which has several dimensions, emerged in the nineties. One of these dimensions is spatial, referring to the debts that southern countries sustain due to the extraction of natural resources and environmental damage inflicted upon northern countries. Another dimension, the temporal dimension, concerns the environmental debts that current generations owe to their predecessors. That means past generations are culpable for overuse of natural resources and mismanagement. The debt issue is complex, despite many mechanisms to resolve it. Most important are the recently introduced environmental bonds, an important step forward in the field of sustainable financing of environmental debts.
Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie
Whereas conventional methods of teaching history do not meet the sometimes purpose has suggested some educators strategies modern help to improve the level of students in the education process through activating prior knowledge and employed in positions of current learning, and focus attention on the points and the outstanding elements of the content and practice techniques Calendar criticof ideas and meanings and mental and linguistic activities used to verify the extent of reaching understanding. &n
... Show MoreSeveral correlations have been proposed for bubble point pressure, however, the correlations could not predict bubble point pressure accurately over the wide range of operating conditions. This study presents Artificial Neural Network (ANN) model for predicting the bubble point pressure especially for oil fields in Iraq. The most affecting parameters were used as the input layer to the network. Those were reservoir temperature, oil gravity, solution gas-oil ratio and gas relative density. The model was developed using 104 real data points collected from Iraqi reservoirs. The data was divided into two groups: the first was used to train the ANN model, and the second was used to test the model to evaluate their accuracy and trend stability
... Show MoreAbstract
Balance is a psychological need and a requirement of importance as the individual seeks to maintain it. The research problem is summarized in the question: do students in the kindergarten department have a cognitive balance? The research aims to identify the cognitive balance of students in the kindergarten department and to identify if there are differences among students of the four stages according to the cognitive balance. The research community was limited to the students in the kindergarten department at the University of Baghdad / College of Education for Women and Al-Mustansiriya University / College of Basic Education and Iraqi University / College of Education for Women for the academic y
... Show MoreThe goal of the research is to develop a sustainable rating system for roadway projects in Iraq for all of the life cycle stages of the projects which are (planning, design, construction and operation and maintenance). This paper investigates the criteria and its weightings of the suggested roadway rating system depending on sustainable planning activities. The methodology started in suggesting a group of sustainable criteria for planning stage and then suggesting weights from (1-5) points for each one of it. After that data were collected by using a closed questionnaire directed to the roadway experts group in order to verify the criteria weightings based on the relative importance of the roadway related impacts
... Show More