Preferred Language
Articles
/
JxdmCo4BVTCNdQwCpzAs
Applying the Analytical Hierarchy Process to Identify the Challenges and Priorities of Reconstruction Projects in Iraq
...Show More Authors

Reconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in time at 13.5%, and changes in quality at 18.11%. The results of the essential subcriteria also indicated that underlying issues still exist in the Iraqi construction industry and that quick solutions are vital. Five mathematical equations were formulated to develop a model to estimate changes that introduce challenges in time, cost, quality, and scope and so to help decision-makers assess the level of these changes and identify challenges. This study recommended addressing these variables through realistic administrative and methodological strategies to consider changes, challenges, and available opportunities.

Scopus Crossref
View Publication
Publication Date
Thu May 02 2019
Journal Name
Oral And Maxillofacial Surgery
Reconstruction plate-related complications in mandibular continuity defects
...Show More Authors

Purpose The purpose of this study was to evaluate the complications associated with the use of reconstruction plates with or without non-vascularized bone graft in reconstruction of mandibular segmental defects caused by trauma and tumor resection and to analyze various factors that are associated with the development of complications. Methods A retrospective observational study was conducted, and the investigated variables included the age and gender of the patients, etiology of the defect, the site of the defect, the size of the defect, whether bone graft was used or not, type of plate used, and whether the reconstruction was immediate or delayed. The outcome variables were the postoperative complications and the success rate. Results Fif

... Show More
View Publication
Scopus (20)
Crossref (27)
Scopus Clarivate Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Compared to the poverty indicators in Iraq in 2007
...Show More Authors

 

     There is poverty because of the difference in capacity and material resources, Previously poverty known on the basis of disparity between income and inadequate income. It realize later that fare wore effects of poverty is the erosion of human capital. The human poverty is the loss of food, education, health care and shelter.

     In order to provide a database that target the poor  , it have been propped a document on the features of poverty and the whereabouts of the poor and the rate of disparity between provinces.

    Here the goal of the research is the identify the factors affecti

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Ssrn Electronic Journal
The Prospective of Artificial Neural Network (ANN’s) Model Application to Ameliorate Management of Post Disaster Engineering Projects
...Show More Authors

Currently and under the COVID-19 which is considered as a kind of disaster or even any other natural or manmade disasters, this study was confirmed to be important especially when the society is proceeding to recover and reduce the risks of as possible as injuries. These disasters are leading somehow to paralyze the activities of society as what happened in the period of COVID-19, therefore, more efforts were to be focused for the management of disasters in different ways to reduce their risks such as working from distance or planning solutions digitally and send them to the source of control and hence how most countries overcame this stage of disaster (COVID-19) and collapse. Artificial intelligence should be used when there is no practica

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Mon May 18 2026
Journal Name
College Of Basic Education Researches Journal
Identify the effect of exercise of the arm is the practice in the development of accurate performance skill transmission (short and long) arm of practice for students badminton
...Show More Authors

View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (5)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Sat Mar 28 2026
Journal Name
Journal Of Physical Education
Analytical Study of Touch Areas and Preparatory Movements Leading to The Touch in Epee Fencing in The Men's Team Final at The Paris 2024 Paralympics
...Show More Authors

In sports where technical performance is crucial, quantitative analysis methods have evolved to track skill performance using modern training methods and technology. This helps trainers evaluate training methods and detect performance issues. Coaches and athletes know that preliminary movements improve attack accuracy, but the association between motions (strikes, presses, crushes) and target regions (torso, armed arm, head) has not been thoroughly investigated. Lack of studies on Paralympic fencing's targeted contact regions and ambiguity around the most common preliminary actions highlight the research problem. The study examined epee fencers' successful movement sequences in the Paris 2024 Paralympic Games' final bouts and touch success

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Oct 28 2022
Journal Name
Political Sciences Journal
The Path of China-India Relations After 2013: Opportunities and Challenges
...Show More Authors

China and India are considered both rising countries, and both are among the world's most populous and fastest growing economies. The long-term growth of both China and India has reinforced the importance of their bilateral relationship. The relations between China and India are complex, as relations between them have undergone great changes during the past seven decades, ranging from friendship to hostility. This study proceeds from the hypothesis that the nature and path of Sino-Indian relations after 2013 are affected by several factors and variables, some of which represent opportunities, others represent challenges and obstacles. Several opportunities have contributed to the reformulation of bilateral relations in terms of mutual ga

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 28 2017
Journal Name
Iraqi Journal Of Science
3D Building Reconstruction Using DEM and Mosaic Model
...Show More Authors

A digital elevation model (DEM) is a digital representation of ground surface topography or terrain. It can be represented as a raster (a grid of squares) and it is commonly estimated by utilizing remote sensing techniques, or from land surveying. In this research a 3D building of Baghdad university campus have been performed using DEM, where the easting, northing, and elevation of 400 locations have been obtained by field survey using global positioning system (GPS). The image of the investigated area has been extracted from QuickBird satellite sensor (with spatial resolution of 0.6 m). This image has been geo-referenced by selecting ground control points of the GPS. The rectification is running, using 1st order polynomial transformation.

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology &amp; Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (11)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref