There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe events was made by using the graphical analysis software Easy View. The results were then discussed to identify the causes of stuck pipe. Finally, recommendation to select proper type /drilling fluid rheology properties, optimize casing seat design to reduce probability of stuck pipe.
Efficiency of Pisum sativum plants in using tricalcium super phosphate (TSP) in presence and absence of mycorrhizal fungi was evaluated in the field experiment in College of Science / Al-Mustansiriyah University. The experiment comprised of (6) treatments prepared from the interaction of two levels of inoculation [non-inoculation with fungus F0 and inoculation with Glomus mosseae fungus (F1)]. And three levels of phosphorus: 0,20,40 Kg P/ha. The experimental size was (1x2)m. Irrigation and hand-weeding were done when needed. The following plant measurements were recorded: (Shoots dry weight, concentration of N and P% in addition to percentage of root infection with mycorrhizal fungi at flowering 50% of plants. The re
... Show MoreNoor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of Missan Oil Company. The first two wells in the field were drilled in seventies and were not opened to production until 2009. The aim of this study is to study the possibility of using the method of gas lift to increase the productivity of this field . PROSPER software was used to design the continuous gas lift by using maximum production rate in the design.
The design was made after comparing the measured pressure with the calculated pressure, this comparison show that the method of Beggs-Brill and Petroleum Exper
... Show MoreExploitation of mature oil fields around the world has forced researchers to develop new ways to optimize reservoir performance from such reservoirs. To achieve that, drilling horizontal wells is an effective method. The effectiveness of this kind of wells is to increase oil withdrawal. The objective of this study is to optimize the location, design, and completion of a new horizontal well as an oil producer to improve oil recovery in a real field located in Iraq. “A” is an oil and gas condensate field located in the Northeast of Iraq. From field production history, it is realized the difficulty to control gas and water production in this kind of complex carbonate reservoir with vertical producer wells. In this study, a horizont
... Show MoreBored piles settlement behavior under vertical loaded is the main factor that affects the design requirements of single or group of piles in soft soils. The estimation of bored pile settlement is a complicated problem because it depends upon many factors which may include ground conditions, validation of bored pile design method through testing and validation of theoretical or numerical prediction of the settlement value. In this study, a prototype single and bored pile group model of arrangement (1*1, 1*2 and 2*2) for total length to diameter ratios (L/D) is 13.33 and clear spacing three times of diameter, subjected to vertical axial loads. The bored piles model used for the test was 2000
... Show MoreThis paper provides an attempt for modeling rate of penetration (ROP) for an Iraqi oil field with aid of mud logging data. Data of Umm Radhuma formation was selected for this modeling. These data include weight on bit, rotary speed, flow rate and mud density. A statistical approach was applied on these data for improving rate of penetration modeling. As result, an empirical linear ROP model has been developed with good fitness when compared with actual data. Also, a nonlinear regression analysis of different forms was attempted, and the results showed that the power model has good predicting capability with respect to other forms.
The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
The research topic was chosen because of the importance of communication in organizations in general and the marketing process in particular. Without communication, the organization can not live and continue ,The problem of study diagnosis the reduction in sales in the company of plant oils in some its classes and weakness in differentiation and its reputation at market in spit if having good products with standardized features And lack of customer communication channels, also the company does not have any whole view about the concept of marketing communication, Therefore, This sudy aimed ro define to know the type of relationship between the extent of the impact of the integrated marketing
... Show MoreArtificial lift techniques are a highly effective solution to aid the deterioration of the production especially for mature oil fields, gas lift is one of the oldest and most applied artificial lift methods especially for large oil fields, the gas that is required for injection is quite scarce and expensive resource, optimally allocating the injection rate in each well is a high importance task and not easily applicable. Conventional methods faced some major problems in solving this problem in a network with large number of wells, multi-constrains, multi-objectives, and limited amount of gas. This paper focuses on utilizing the Genetic Algorithm (GA) as a gas lift optimization algorit