This paper proposes a novel finite-time generalized proportional integral observer (FTGPIO) based a sliding mode control (SMC) scheme for the tracking control problem of high order uncertain systems subject to fast time-varying disturbances. For this purpose, the construction of the controller consists of two consecutive steps. First, the novel FTGPIO is designed to observe unmeasurable plant dynamics states and disturbance with its higher time derivatives in finite time rather than infinite time as in the standard GPIO. In the FTGPO estimator, the finite time convergence rate of estimations is well achieved, whereas the convergence rate of estimations by classical GPIO is asymptotic and slow. Secondly, on the basis of the finite and fast estimations, the SMC scheme is constructed in order to compensate estimation errors in both states and disturbance. Finally, the tracking efficiency is verified by carrying out many simulations on the application example of flexible joint robot (FJR). Besides, comparing the proposed method with the standard GPIO based SMC method is performed.
Abstract:
Current research has sought to apply the criteria of potential for altmizalaorbi model EFQM 2013 in assessing the performance of the Inspector General's Office/Ministry of health, so as to keep up with a modern and advanced management methods in the evaluation of performance, as well as to link performance to a citizen's life, and it takes him beyond the accepted service capabilities today, but of budget duties between dealers servicing responsibilities and future planning, financial control, competitiveness, human resources needs and maintaining quality and development, as well as the constant quest for continuous improvement, is the spirit of the principle underpinning the European Foundation Quality managemen
... Show MoreNEACADEMY's JOURNALS
Current research sought to evaluate the performance and results of employees in accordance with normative to people and people result for the European model of excellence EFQM 2013 quality management Foundation in the Inspector General's Office/Ministry of health, so as to pursue a modern and advanced management methods in evaluating performance and the performance of the Office's relationship with a citizen's life, since it takes him beyond the accepted service capabilities today, but it became budget duties between dealers servicing responsibilities and future planning, financial control, competitiveness, human resources needs and maintaining quality and continuous improvement and development as well as The primary role of the
... Show MoreA field experiment was carried out in one of the orchards of Al-Qassim district in Babel Governorate to find out the ability of a locally manufactured platform to serve palm trees by working in flat and uneven orchard land, palm tree heights of 4, 8, and 12 meters, and it performs pollination, pruning and harvesting services. The time of ascent and descent, the palm service, and the palm/hour productivity were measured. A randomized complete block design with three replications used a split split-plot arrangement. The nature of the land (flat or uneven) represented the main plots, the height of the palm trees (4, 8, 12) meters, the sub-plots, and the palm service operations (pollinati
For over a century, the global consumption of asphalt binder in asphalt mixture production has been substantial. In the Heet region (west of Iraq), two distinct forms of natural asphalt (NA) deposits exist: rock asphalt and sulfur spring asphalt. This study focused on using NA sourced from sulfur springs. The aim was to investigate the potential of incorporating NA into local asphalt mixtures. To achieve this, NA was heated to 163°C for varying durations. After heat treatment, laboratory tests were conducted on NA. The findings suggest that by heating NA for 20 hours, it conforms to Iraqi specifications in terms of physical properties. Furthermore, compared to conventional petroleum asphalt, treated NA showed greater
... Show MoreAt present, smooth movement on the roads is a matter which is needed for each user. Many roads, especially in urban areas geometrically improved because of the number of vehicles increase from time to time.
In this research, Highway capacity software, HCS, 2000, will be adopted to determine the effectiveness of roundabout in terms of capacity of roundabout, delay and level of service of roundabout.
The results of the analysis indicated that the Ahmed Urabi roundabout operates under level of service F with an average control delay of 300 seconds per vehicle during the peak hours.
The through movements of Alkarrada- Aljadiriya direction (Major Direction) represent the heaviest traff
... Show MoreThe purpose of this paper is to depict the effect of adding a hydraulic accumulator to a hydraulic system. The experimental work includes using measuring devices with interface to measure the pressure and the vibration of the system directly by computer so as to show the effect of accumulator graphically for real conditions, also the effects of hydraulic accumulator for different applications
have been tested. A simulation analysis of the hydraulic control system using MATLAB.R2010b to study was made to study the stability of the system depending on the transfer function, to estimate the effect of adding the accumulator on stability of the system. A physical simulation test was made for the hydraulic system using MATLAB to show the ef
The design, construction and investigation of experimental study of two compound parabolic concentrators (CPCs) with tubular absorber have been presented. The performance of CPCs have been evaluated by using outdoor experimental measurements including the instantaneous thermal efficiency. The two CPCs are tested instantly by holding them on a common structure. Many tests are conducted in the present work by truncating one of them in three different levels. For each truncation the acceptance half angle (θc) was changed. Geometrically, the acceptance half angle for standard CPC is (26o). For the truncation levels for the other CPC 1, 2 and 3 the acceptance half angle were 20o, 26o and 5
... Show More