Time is an essential element of contracts، as there is an independent in many parts of each contract، but the time dimension has a significant impact on the provisions of all contracts and is not limited to a particular range of contracts، and French and Arab jurists alike have called for this dimension to be given special attention، and as a result the French legislator has introduced the term duration of the contract، to try to limit the temporal elements، to clarify their provisions and to distinguish between them in decree131/2 016، but for our Arab country it did not receive the appropriate answer. The problem of duration in contracts relates to the lack of clarity of the idea، and then to confuse the various time terms in the contracts، and to focus on the stage of implementation of the contract without its composition or expiry، so we decided to study the duration of the contract in accordance with the French legislation، and analyze its legal articles to reach the correct legal provisions، all in comparison with the various articles in our Iraqi and Egyptian legislation، thus we hope that our study will be the nucleus of other legal studies in this area.
The non static chain is always the problem of static analysis so that explained some of theoretical work, the properties of statistical regression analysis to lose when using strings in statistic and gives the slope of an imaginary relation under consideration. chain is not static can become static by adding variable time to the multivariate analysis the factors to remove the general trend as well as variable placebo seasons to remove the effect of seasonal .convert the data to form exponential or logarithmic , in addition to using the difference repeated d is said in this case it integrated class d. Where the research contained in the theoretical side in parts in the first part the research methodology ha
... Show MoreThe Study aims to show the role of Flexible Budget in planning and control The Factory over head.
The study consists four reaserchs the First introduction for the role of Budget in planning and control The second definition Flexible Badget the Third Factory overhed cost variances Analysis The four conclusions and recommendations.
The factory overhead cost represents great ratio from product cost so the management must planning and control on cost Through the year by the Budget of factory over head in the beginning of the year and determind overhead rater.
Abstract
The research aims to study the problem of high production costs and low quality and the use of total quality management tools to detect problems of the high cost of failure and low quality products, diagnosis, and developing appropriate solutions.
To achieve the goal, we studied the overall quality tools and its relationship with the costs and the possibility of improving quality through the use of these tools.
Was limited to these tools and study the relation to the reduction of costs and improving quality have been studied serially by the possibility of the reduction.
To achieve the goal, the study of the concept of total quality management