Steganography can be defined as the art and science of hiding information in the data that could be read by computer. This science cannot recognize stego-cover and the original one whether by eye or by computer when seeing the statistical samples. This paper presents a new method to hide text in text characters. The systematic method uses the structure of invisible character to hide and extract secret texts. The creation of secret message comprises four main stages such using the letter from the original message, selecting the suitable cover text, dividing the cover text into blocks, hiding the secret text using the invisible character and comparing the cover-text and stego-object. This study uses an invisible character (white space) position of in the cover text that used to hide the the secrete sender masseges. The experiments results show that the suggested method presents highly secret due to use the multi-level of complexity to avoid the attackers.
The ground state charge, neutron, proton and matter densities, the associated nuclear radii and the binding energy per nucleon of 8B, 17Ne, 23Al and 27P halo nuclei have been investigated using the Skyrme–Hartree–Fock (SHF) model with the new SKxs25 parameters. According to the calculated results, it is found that the SHF model with these Skyrme parameters provides a good description on the nuclear structure of above proton-rich halo nuclei. The elastic charge form factors of 8B and 17Ne halo nuclei and those of their stable isotopes 10B and 20Ne are calculated using plane-wave Born approximation with the charge density distributions obtained by SHF model to investigate the effect of the extended charge distributions of proton-rich nucl
... Show MoreThe growing demand for sustainable and high-performance asphalt binders has prompted the exploration of waste-derived modifiers. This study investigates the performance enhancement of Natural Asphalt (NA) using Sugarcane Molasses (SM) and Waste Engine Oil (WEO). The modified blends were prepared by partially replacing 50 % NA with varying proportions of SM and WEO ranging from 10 % to 40 % of the total weight of NA. Comprehensive testing was conducted, including penetration, softening point, ductility, viscosity, Bending Beam Rheometer (BBR), Multiple Stress Creep Recovery (MSCR), Energy Dispersive X-ray Spectroscopy (EDX), Fourier Transform Infrared (FTIR) spectroscopy, and Scanning Electron Microscopy (SEM). The results demonstrated that
... Show MoreBiodiesel is an environmentally friendly fuel and a good substitution for the fossil fuel. However, the purity of this fuel is a major concern that challenges researchers. In this study, a calcium oxide based catalyst has been prepared from local waste eggshells by the calcination method and tested in production biodiesel. The eggshells were powdered and calcined at different temperatures (700, 750, 800, 850 and 900 °C) and periods of time (1, 2, 3, 4 and 5 hr.). The effect of calcination temperature and calcination time on the structure and activity of the solid catalyst were examined by X-ray Diffraction (XRD), Scanning Electron Microscopy (SEM), and Brunaure-Emmett-Teller (BET). The optimum catalyst performance was obtained at 900 °C
... Show MoreAbstract
In this manuscript, a simple new method for the green synthesis of platinum nanoparticles (Pt NPs) utilizing F. carica Fig extract as reducing agent for antimicrobial activities was reported. Simultaneously, the microstructural and morphological features of the synthesized Pt NPs were thoroughly investigated. In particular, the attained Pt NPs exhibited spherical shape with diameter range of 5-30 nm and root mean square of 9.48 nm using Transmission Electron Microscopy (TEM) and Atomic Force Microscopy (AFM), respectively. Additionally, the final product (Pt NPs) was screened as antifungal and antibacterial agent against Candida and Aspergillus species as well as Gram-positive Staphyllococcus aureus and G
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent