In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show MoreThis study aims to identify both the importance of using (LinkedIn) and its drawbacks for researchers and specialists in the field of information and knowledge technologies. The study relied mainly on the statistical method (analytical method) from the collection of data tools (questionnaire) that was distributed electronically (Google Forms) to the sample community of (55) instructors. The feedback received illustrates that (46) instructors among those who participated in the questionnaire subscribed to (LinkedIn) and the rest did not. Their data was analyzed statistically, and the general arithmetic mean and the hypothetical mean was extracted for them to achieve the objectives of the study and prove their hypotheses. The site positively
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen