Evaluation of the Performance of Glasphalt Concrete Mixtures for Binder Course
...Show More Authors

Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Evaluation of the Stability and Flow of Asphalt Concrete Produced with Waste Brick Tile Powder as a Filler
...Show More Authors

The utilization of recycled brick tile powder as a replacement for conventional filler in the asphalt concrete mix has been studied in this research. This research evaluates the effectiveness of recycled brick tile powder and determines its optimum replacement level. Using recycled brick tile powder is significant from an environmental standpoint as it is a waste product from construction activities. Sixteen asphalt concrete samples were produced, and eight were soaked for a day. Samples contained 5% Bitumen, 2% to 5% brick tile powder, and conventional stone dust filler. The properties of samples were evaluated using the Marshall test. It was observed that the resistance to stiffness and deformation of asphalt concrete

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Tue Jan 01 2013
Journal Name
كلية التربية-الجامعة المستنصرية
Study the drift velocity of electron in mixtures Cf4,O2 and Ar
...Show More Authors

Publication Date
Thu Sep 01 2016
Journal Name
Indonesian Journal Of Electrical Engineering And Computer Science
Performance evaluation of heterogeneous network based on RED and WRED
...Show More Authors

Scopus (3)
Scopus
Publication Date
Tue Dec 30 2014
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Performance Evaluation of Three Phase Spray Direct Contact Heat Exchanger
...Show More Authors

 

The present investigation deals with experimental study of three-phase direct-contact heat exchanger, for water-Freon R11 system, where water is the continuous phase (liquid) and Freon R11 (liquid-gas) is the dispersed phase. The test section consisted of a cylindrical Perspex column with inner diameter 8cm and 1.2m long, in which, water was to be confined. Liquid Freon R11 drops were injected into the hot water filled column, through a special design of distributors at the bottom of the column. The liquid Freon R11 drops rose on their way up and evaporated into two-phase bubbles at atmospheric pressure. The study was devoted to express the effect of process variables such as c

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Relationship and impact of the Analysis and evaluation jobs with employees performance : Survey study
...Show More Authors

        The aim the research that definition on the impact a lot of Analysis and evaluation jobs impact in support the employees performance the property that are Analysis and evaluation jobs is one of the jobs however of the human resource management on organization and the impact footpace big on the chractericties and performance of the people and the impact that success of the organization , And here problem stool of the research in the omission the role for the Analysis and evaluation jobs impact in support the employees performance from the upward management in the organization , Polls were adopted as tools for obtaining data and the Depart

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Engineering
Evaluation of Traffic Performance of Ahmed Urabi Square in Baghdad City
...Show More Authors

At present, smooth movement on the roads is a matter which is needed for each user. Many roads, especially in urban areas geometrically improved because of the number of vehicles increase from time to time.

In this research, Highway capacity software, HCS, 2000, will be adopted to determine the effectiveness of roundabout in terms of capacity of roundabout, delay and level of service of roundabout.

The results of the analysis indicated that the Ahmed Urabi roundabout operates under level of service F with an average control delay of 300 seconds per vehicle during the peak hours.

The through movements of Alkarrada- Aljadiriya direction (Major Direction) represent the heaviest traff

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Wed Sep 10 2025
Journal Name
Journal Of Engineering
Calculation Of Volumeteric And Thermodynamic Properties For Pure Hydrocarbons And Their Mixtures Using Cubic Equations Of State
...Show More Authors

View Publication
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study)
...Show More Authors

The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.

The question is, was the optimum implementation accomplished? The provision for the success of the project

... Show More
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Performance of concrete thrust block at several burial conditions under the influence of thrust forces generated in the water distribution networks
...Show More Authors
Abstract<p>This study was prepared to investigate the performance and behavior of concrete thrust blocks supporting pipe fittings. In the water distribution networks, it is always necessary to change the path of the pipes at different degrees or to create new branches. In these regions, an unbalanced force called the thrust force is generated. In order to counter this force, these regions are supported with concrete blocks. In this article, the system components (soil, pipe with its bend and thrust blocks) have been numerically modeled and simulated by the ABAQUS CAE/2019 software program in order to study the behavior and stability of the thrust block with different burial conditions (several b</p> ... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Fri Sep 01 2023
Journal Name
Journal Of Engineering
The Effect of Cohesive Debonding Elimination on Enhancing the Flexural Performance of Damaged Unbonded Prestressed Concrete Girders Strengthened Using NSM CFRP
...Show More Authors

This manuscript studied the effect of U-CFRP wrapped sheet anchorage on the flexural performance of unbonded post-tensioned PC members subjected to partial strand damage and strengthened using CFRP Near-Surface Mounting techniques. The program includes six girders as a control girder, a girder with strand damage of 14.2%, and four girders strengthened by CFRP laminates using the NSM technique with and without U-CFRP wrapped sheet anchorages. The testing results show that the strand damage of 14.2% has reduced the flexural strength of the girder by 5.71%. The NSM-CFRP laminate has a significant effect on flexural strength by 17.4%. On the other hand, the application of end U-CFRP wrapped sheet anchorages improves flexural

... Show More
View Publication Preview PDF
Crossref (1)
Crossref