Preferred Language
Articles
/
HxdiZ5IBVTCNdQwCIK8_
Sliding mode control based on high-order extended state observer for flexible joint robot under time-varying disturbance
...Show More Authors

Abstract. In this paper, a high order extended state observer (HOESO) based a sliding mode control (SMC) is proposed for a flexible joint robot (FJR) system in the presence of time varying external disturbance. A composite controller is integrated the merits of both HOESO and SMC to enhance the tracking performance of FJR system under the time varying and fast lumped disturbance. First, the HOESO estimator is constructed based on only one measured state to precisely estimate unknown system states and lumped disturbance with its high order derivatives in the FJR system. Second, the SMC scheme is designed based on such accurate estimations to govern the nominal FJR system by well compensating the estimation errors in the states and the lumped disturbance. To verify the tracking trajectory performance, several simulations have been conducted on the simulated FJR plant model. In addition, a comparative study is carried out between the proposed method and the full state feedback linearization control (FLC) with first order ESO (ESO1).

Scopus Crossref
View Publication
Publication Date
Wed Jan 09 2019
Journal Name
Journal Of The College Of Education For Women
Time paradox in the Iraqi feminist novel (2003 – 2013)
...Show More Authors

This paper deals with novels for group of Iraqi Women novelists published in the time period 2003 – 2013, and the functioning of temporal anomalies in the Iraqi Women's narrative.
In general, the novel contains structural elements such as: the characters, events and the places, these elements must be collected by an artist creating a complete work of fiction. However the time dominates the other elements through progression and regaining called Time paradox, it has a modern critical importance because of its impact in highlighting of political, social and cultural events that make up the fictional environment which cast a shadow over other techniques. And that it is clear in the course of the narrative.

View Publication Preview PDF
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Jun 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Design Sampling Plan when Life Time Follows Logistic Distribution
...Show More Authors

Design sampling plan was and still one of most importance subjects because it give lowest cost  comparing with others, time live statistical distribution should be known to give best estimators for  parameters of sampling plan and get best sampling plan.

Research dell with design sampling plan when live time distribution follow Logistic distribution with () as location and shape parameters, using these information can help us getting (number of groups, sample size) associated with reject or accept the Lot

Experimental results for simulated data shows the least number of groups and sample size needs to reject or accept the Lot with certain probability of

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Sep 11 2022
Journal Name
Journal Of Petroleum Research And Studies
Non-Productive Time Reduction during Oil Wells Drilling Operations
...Show More Authors

Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of

... Show More
View Publication
Crossref
Publication Date
Mon Jan 01 2018
Journal Name
Rehabend
Prediction of impact force-time history in sandy soils
...Show More Authors

Scopus
Publication Date
Fri Apr 30 2021
Journal Name
Al-kindy College Medical Journal
Al-Kindy College Medical Journal: Time to Move Forward
...Show More Authors

It is well- known that the distinguished scholastic journal is a crucial cornerstone, which contributes to the scientific integrity of a particular academic institution. The establishment of the Al-Kindy College of Medicine (AKCM), University of Baghdad, in 1998 urged the need to issue Al-Kindy College Medical Journal (KCMJ).

View Publication Preview PDF
Crossref
Publication Date
Fri Jan 26 2024
Journal Name
Iraqi Journal Of Science
Time Series Analysis of Baghdad Rainfall Using ARIMA Method
...Show More Authors

Monthly rainfall data of Baghdad meteorological station were taken to study the time behavior of these data series. Significant fluctuation,very slight increasing trend and significant seasonality were noticed. Several ARIMA models were tested and the best one were checked for the adequacy. It is found that the SEASONAL ARIMA model of the orders SARIMA(2,1,3)x(0,1,1) is the best model where the residual of this model exhibits white noise property, uncorrelateness and they are normally distributed. According to this model, rainfall forecast for four years was also achieved and showing similar trend and extent of the original data.

View Publication Preview PDF
Publication Date
Fri Oct 14 2016
Journal Name
International Journal For Computational Methods In Engineering Science And Mechanics
Simultaneous determination of time-dependent coefficients and heat source
...Show More Authors

View Publication
Scopus (16)
Crossref (12)
Scopus Crossref
Publication Date
Thu May 04 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Minimizing total Completion Time and Maximum late Work Simultaneously
...Show More Authors

In this paper, the problem of scheduling jobs on one machine for a variety multicriteria
are considered to minimize total completion time and maximum late work. A set of n
independent jobs has to be scheduled on a single machine that is continuously available from
time zero onwards and that can handle no more than one job at a time. Job i,(i=1,…,n)
requires processing during a given positive uninterrupted time pi, and its due date d
i.
For the bicriteria problems, some algorithms are proposed to find efficient (Pareto)
solutions for simultaneous case. Also for the multicriteria problem we proposed general
algorithms which gives efficient solutions within the efficient range

View Publication Preview PDF
Publication Date
Sun Jun 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Comparing Bayesian methods to estimate the failure probability for electronic systems in case the life time data are not available
...Show More Authors

In this research, we find the Bayesian formulas and the estimation of Bayesian expectation for product system of Atlas Company.  The units of the system have been examined by helping the technical staff at the company and by providing a real data the company which manufacturer the system.  This real data include the failed units for each drawn sample, which represents the total number of the manufacturer units by the company system.  We calculate the range for each estimator by using the Maximum Likelihood estimator.  We obtain that the expectation-Bayesian estimation is better than the Bayesian estimator of the different partially samples which were drawn from the product system after  it checked by the

... Show More
View Publication Preview PDF
Crossref