Turbidity is a visual property of water that expresses the amount of suspended substances in the water. Its presence in quantities more significant than the permissible limit makes the water undrinkable and reduces the effectiveness of disinfectants in treating pathogens. On this basis, turbidity is used as a basic indicator for measuring water quality. This study aims to evaluate the removal efficiency of AL- Muthanna WTP. Water turbidity was used as a basic parameter in the evaluation, using performance improvement evaluation and data from previous years (2016 to 2020). The average raw water turbidity was 26.7 NTU, with a minimum of 14 NTU, with a maximum of 48 NTU. Water turbidity value for 95% of settling daily reading data was (13.7) NTU which is larger than the goal value (10) NTU, which achieves (51.2) % of the optimum goal. In comparison, the water turbidity value for 95% of daily reading data of water filtered was (6.90) NTU which is larger than the goal value (5) NTU, which achieves (68.8) % of the optimum goal. The removal efficiency for previous years (2016 to 2020) was (78.5, 76, 73.5, 72, 68)%, respectively, within acceptable limits.
In this modern Internet era and the transition to IPv6, routing protocols must adjust to assist this transformation. RIPng, EIGRPv6 and OSPFv3 are the dominant IPv6 IGRP (Interior Gateway Routing Protocols). Selecting the best routing protocol among the available is a critical task, which depends upon the network requirement and performance parameters of different real time applications. The primary motivation of this paper is to estimate the performance of these protocols in real time applications. The evaluation is based on a number of criteria including: network convergence duration, Http Page Response Time, DB Query Response Time, IPv6 traffic dropped, video packet delay variation and video packet end to end de
... Show MoreIn this paper, introduce a proposed multi-level pseudo-random sequence generator (MLPN). Characterized by its flexibility in changing generated pseudo noise (PN) sequence according to a key between transmitter and receiver. Also, introduce derive of the mathematical model for the MLPN generator. This method is called multi-level because it uses more than PN sequence arranged as levels to generation the pseudo-random sequence. This work introduces a graphical method describe the data processing through MLPN generation. This MLPN sequence can be changed according to changing the key between transmitter and receiver. The MLPN provides different pseudo-random sequence lengths. This work provides the ability to implement MLPN practically
... Show MoreThe Research topic seeks to analyze the "political risk and its component Terrorism Index," which consists of five indicators index, a number of terrorist operations, and the number of dead and wounded, and the size of the physical losses, based search sub-index analysis of material losses for the index terrorism and its impact on the indicators listed on the Iraq Stock Exchange Finance. As for the practical side, it has been use style gradient unrestricted and link the sample represented by ten banks listed on the Iraq Stock Exchange. was Statement the correlation and interaction of variables of the studySearch results produced that the volume of material losses is the most important indicator in the influential force and it explain a v
... Show MoreThe raw material soil of Al-Sowera factory quarry (quarry soil and mixture) used for building brick industry was tested mineralogically, geochemically and geotechnically. Mineral components of soil are characterized by Clay minerals (Palygoriskite and chlorite) and nonclay minerals like calcite, quratz, feldspar, gypsum and halite. The raw material is deficient in SiO2, Al2O3, K2O, Fe2O3 and MgO, while enriched in CaO. Loss on ignition and Na2O are in suitable level and appear to be concordant with the standard. Grain size analyses show that the decreasing sand and clay, and increasing silt ratio in both quarry soil and mixture caused decreasing in strength of brick during molding and after firing. The quarry soil is characterized by high p
... Show MoreMany managers in geometrical and technical organizations prefer to deal with quantitative values to choose between the available options and choose the best alternative to avoid randomization and bias in decision making. One of them Baghdad Water Department, which seeks to develop the quality of its product (drinking water) and achieve its objectives under increasing growing population and the demand for water, Some of TQM tools, especially the statistical, have this ability because there is chance to use historical data and experiment of employees in Application . Two statistical tools were applied: the nominal group technique, matrix data analysis technique as well as the brainstorming tool to search for the best o
... Show MoreIn recent years, the Global Navigation Satellite Services (GNSS) technology has been frequently employed for monitoring the Earth crust deformation and movement. Such applications necessitate high positional accuracy that can be achieved through processing GPS/GNSS data with scientific software such as BERENSE, GAMIT, and GIPSY-OSIS. Nevertheless, these scientific softwares are sophisticated and have not been published as free open source software. Therefore, this study has been conducted to evaluate an alternative solution, GNSS online processing services, which may obtain this privilege freely. In this study, eight years of GNSS raw data for TEHN station, which located in Iran, have been downloaded from UNAVCO website
... Show MoreIt highlights the importance of construction projects because of its significant role in the development of society, including the buildings FEDE projects to their importance to raise the level of education through the conclusion of the special to implementation and the establishment of schools of contracts at the country level, which requires the completion of the project at less time and within the cost specified and the best quality and may highlight the importance of time on all the elements of what has an important role in setting up the project for various reasons may be the need for the use of schools as soon as possible, but the reality showed exceeded the completion of those schools could be up to 6 years and there are some cont
... Show More