In this paper, preliminary test Shrinkage estimator have been considered for estimating the shape parameter α of pareto distribution when the scale parameter equal to the smallest loss and when a prior estimate α0 of α is available as initial value from the past experiences or from quaintance cases. The proposed estimator is shown to have a smaller mean squared error in a region around α0 when comparison with usual and existing estimators.
In this work, spinel ferrites (NiCoFe2O4) were prepared as thin films by dc reactive dual-magnetron co-sputtering technique. Effects of some operation parameters, such as inter-electrode distance, and preparation conditions such as mixing ratio of argon and oxygen in the gas mixture, on the structural and spectroscopic characteristics of the prepared samples were studied. For samples prepared at inter-electrode distance of 5 cm, only one functional group of OH- was observed in the FTIR spectra as all bands belonging to the metal-oxygen vibration were observed. Similarly, the XRD results showed that decreasing the pressure of oxygen in the gas mixture lead to grow more crystal planes in the samples prepare
... Show MoreThis paper proposes an on-line adaptive digital Proportional Integral Derivative (PID) control algorithm based on Field Programmable Gate Array (FPGA) for Proton Exchange Membrane Fuel Cell (PEMFC) Model. This research aims to design and implement Neural Network like a digital PID using FPGA in order to generate the best value of the hydrogen partial pressure action (PH2) to control the stack terminal output voltage of the (PEMFC) model during a variable load current applied. The on-line Particle Swarm Optimization (PSO) algorithm is used for finding and tuning the optimal value of the digital PID-NN controller (kp, ki, and kd) parameters that improve the dynamic behavior of the closed-loop digital control fue
... Show MoreThis article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a
... Show MoreBackground: Complete seal of the root canal system following its chemo-mechanical debridement plays a pivotal role for achieving successful endodontic treatment. This can be established by reducing the gaps between the core filling material and root canal wall. Aim: To assess and compare the dislocation resistance of root canals obturated with GuttaFusion® and TotalFill BC sealer versus single cone obturation technique and TotalFill BC sealer after instrumentation of the canals with WaveOne, ProTaper Next and ProTaper Universal system. Material and Method: Sixty extracted human permanent mandibular premolars were conducted in the current study. The teeth were decorated and left the root with 15mm length; the roots were divided randomly i
... Show MoreThis paper presents a combination of enhancement techniques for fingerprint images affected by different type of noise. These techniques were applied to improve image quality and come up with an acceptable image contrast. The proposed method included five different enhancement techniques: Normalization, Histogram Equalization, Binarization, Skeletonization and Fusion. The Normalization process standardized the pixel intensity which facilitated the processing of subsequent image enhancement stages. Subsequently, the Histogram Equalization technique increased the contrast of the images. Furthermore, the Binarization and Skeletonization techniques were implemented to differentiate between the ridge and valley structures and to obtain one
... Show MoreDelays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious
issue. Several delay analysis methods are available but no one method can be universally used over another in
all situations. The selection of the proper analysis method depends upon a variety of factors including
information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implement