The purpose of this experiment was to determine the relationship between the path coefficient and seed rate for four different barley cultivars (Amal, Ibaa 265, Ibaa 99, and Buhooth 244) during the 2019-2020 winter season. The experiment was carried out using a split plot design with three replications according to a randomized complete block design (RCBD). The highest positive thru effect on grain yield was found for flag leaf area and harvest index at aseeding rate of 130 kg.h-1; the highest positive direct effect on grain yield was found for flag leaf area and plant height at aseeding rate of 160 kg.h-1; and the highest positive direct effect on yield was found for biological yield and harvest index at a seeding rate of 190 kg.ha-1. Because of this, it can be used as proof of selective breeding for increased yield in barley by plant breeders.
In this research, optical communication coding systems are designed and constructed by utilizing Frequency Shift Code (FSC) technique. Calculations of the system quality represented by signal to noise ratio (S/N), Bit Error Rate (BER),and Power budget are done. In FSC system, the data of Nonreturn- to–zero (NRZ ) with bit rate at 190 kb/s was entered into FSC encoder circuit in transmitter unit. This data modulates the laser source HFCT-5205 with wavelength at 1310 nm by Intensity Modulation (IM) method, then this data is transferred through Single Mode (SM) optical fiber. The recovery of the NRZ is achieved using decoder circuit in receiver unit. The calculations of BER and S/N for FSC system a
... Show MoreTraction force and power requirement when performing primary tillage occupy the minds of almost farmers, this field research had aim to determine and calculate the pulling force of the most commonly used moldboard and chisel plows, the research conducted in silt clay loam for chisel and moldboard plows as the main factor, two depths of tillage 18 and 25 cm as a second factor and three speeds of tractor 2.55, 4.30 and 6.15 km.h-1 as a third factor. Moldboard plow recorded least traction force 7.550 kN, drawbar power 11.583 hp, power losses due to slippage 1.088 hp, power on the rear axle of the tractor 15.770 hp and brake horse power 17.495 hp. Chisel plow recorded best traction efficiency 76.217 % and total traction efficiency 68.659 %. Dep
... Show MoreThe world's renewable energy sources have taken on great importance, for its cleanness and its environmental effects as well as being a renewable source, Increased demand for fossil energy sources is also causing global warming and climate change. Iraq is an appropriate area for renewable energy This study shows that renewable alternative energy has not been used sufficiently enough at present. But this energy can play an important role in the future of renewable energy in Iraq. This research aims to study the renewable energy in Iraq (solar energy) and it is appropriate to develop this alternative energy for crude oil, which is characterized by the use of the most appropriate and less economical and more environmentally friendly. Solar
... Show MoreIn this paper, three approximate methods namely the Bernoulli, the Bernstein, and the shifted Legendre polynomials operational matrices are presented to solve two important nonlinear ordinary differential equations that appeared in engineering and applied science. The Riccati and the Darcy-Brinkman-Forchheimer moment equations are solved and the approximate solutions are obtained. The methods are summarized by converting the nonlinear differential equations into a nonlinear system of algebraic equations that is solved using Mathematica®12. The efficiency of these methods was investigated by calculating the root mean square error (RMS) and the maximum error remainder (𝑀𝐸𝑅n) and it was found that the accuracy increases with increasi
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
Empirical equations for estimating thickening time and compressive strength of bentonitic - class "G" cement slurries were derived as a function of water to cement ratio and apparent viscosity (for any ratios). How the presence of such an equations easily extract the thickening time and compressive strength values of the oil field saves time without reference to the untreated control laboratory tests such as pressurized consistometer for thickening time test and Hydraulic Cement Mortars including water bath ( 24 hours ) for compressive strength test those may have more than one day.