Magneto-rheological (MR) Valve is one of the devices generally used to control the speed of Hydraulic actuator using MR fluid. The performance of valve depends on the magnetic circuit design. Present study deals with a new design of MR valve. The finite element analysis is carried out on this valve to optimize its design. The design of the magnetic circuit is accomplished by magnetic finite element software such as Finite Element Method Magnetic (FEMM). The Model dimensions of MR valve, material properties and the circuit properties of valve coil are taken into account. The results of analysis are presented in terms of magnetic strength and magnetic flux density. The valve can be operated with variable flow rate by varying the current. It i
... Show MoreIn this study, a total of 209 individuals of leeches were collected from Al-Hindyia River / Babil Province. 116 individuals were identified as Erpobdella octaculata (Linnaeus, 1758), 50 individuals as Erpobdella punctata (Leidy,1870) and 43 individuals as Hemiclepsis marginata (Müller, 1774). Four samples were collected monthly during a period from February to June 2018. Some physical and chemical water properties were also examined, including air and water temperature, potential of hydrogen pH, Electrical Conductivity EC, Total Dissolved Solid TDS, Dissolved Oxygen DO, and the Biological Oxygen Demand BOD₅. Air and water temperature were r
... Show MoreIn this paper, the methods of weighted residuals: Collocation Method (CM), Least Squares Method (LSM) and Galerkin Method (GM) are used to solve the thin film flow (TFF) equation. The weighted residual methods were implemented to get an approximate solution to the TFF equation. The accuracy of the obtained results is checked by calculating the maximum error remainder functions (MER). Moreover, the outcomes were examined in comparison with the 4th-order Runge-Kutta method (RK4) and good agreements have been achieved. All the evaluations have been successfully implemented by using the computer system Mathematica®10.
The accurate 3-D coordinate's measurements of the global positioning systems are essential in many fields and applications. The GPS has numerous applications such as: Frequency Counters, Geographic Information Systems, Intelligent Vehicle Highway Systems, Car Navigation Systems, Emergency Systems, Aviations, Astronomical Pointing Control, and Atmospheric Sounding using GPS signals, tracking of wild animals, GPS Aid for the Blind, Recorded Position Information, Airborne Gravimetry and other uses. In this paper, the RTK DGPS mode has been used to create precise 3-D coordinates values for four rover stations in Baghdad university camp. The HiPer-II Receiver of global positioning system was used to navigate the coordinate value. The results wil
... Show MoreHorizontal wells are of great interest to the petroleum industry today because they provide an attractive means for improving both production rate and recovery efficiency. The great improvements in drilling technology make it possible to drill horizontal wells with complex trajectories and extended for significant depths.
The aim of this paper is to present the design aspects of horizontal well. Well design aspects include selection of bit and casing sizes, detection of setting depths and drilling fluid density, casing, hydraulics, well profile, and construction of drillstring simulator. An Iraqi oil field (Ajeel field) is selected for designing horizontal well to increase the productivity. Short radius horizontal well is suggested fo
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event