The study was conducted at the fields of the Department of Horticulture and Landscape Gardening, College of Agriculture, University of Baghdad " Abu Ghraib" during the growing seasons 2013-2014 to Evaluate the Vegetative growth , yield traits and genetic parameter of some tomato mutants. Results showed significantly increased of plant height in M6-2 mutant 245cm in Comparison with M6- 3 130 cm . M6-4 mutant significantly increasing of floral clusters 13 . Mutant M6-3 showed significantly increasing the average of, fruit weight 125.9g and plant yield 7.17 kg.plant-1 as comparison with M6-2 which showed decreasing of average of fruit weight and plant yield 79.40g and 4.38 kg.plant-1 respectively. Also results showed the highest Genetic variation components in plant height and average of fruit weight. The highest percentage of heritability in the broad sense plant height, floral clusters and average of fruit weight Analysis Hierarchical clustering showed that mutant was distributed in two groups the first group included mutants with M6-3 and M6-4 , while the second group included mutants M6-2 and M6-1.
Abstract:
This research seeks to test the influence of intellectual capital as an explanatory variable and its components (human capital, structural capital, relational capital) and sustainable competitive performance as a responsive variable and its components (reducing service delivery cycle time, rapid response to market demand, increasing customer satisfaction, providing better Quality of service, increasing market share)” through a field study, and here the research problem was diagnosed in an attempt to answer the following question: Is there awareness among the senior management within the private colle
... Show MoreThe research Aim is to provide support to small enterprises by providing tools that enable measurement and test their performance and identifying weaknesses and work on them is determined by the problem of searching using traditional assessment methods for small projects with only financial performance measurement standards that do not provide a complete picture of the performance of these projects so use the balanced scorecard the four pillars (financial, customer, learning and growth, and internal processes) and identify deviations and work on them through the use of the outputs of the programme (probe), PROmoting Business Excellence-PROBE), which It is a model of performance evaluation, with which you can deve
... Show MoreStudy of determining the optimal future field development has been done in a sector of South Rumaila oil field/ main pay. The aspects of net present value (economic evaluation) as objective function have been adopted in the present study.
Many different future prediction cases have been studied to determine the optimal production future scenario. The first future scenario was without water injection and the second and third with 7500 surface bbls/day and 15000 surface bbls/day water injection per well, respectively. At the beginning, the runs have been made to 2028 years, the results showed that the optimal future scenario is continuing without water in
The research intent evaluates the performance of material technical department / Technical College -Baghdad.
The study depend on the descriptive analytical approach to determine and treating the variables to get data and information that related to study, the researchers depended on questionnaire designed for this purpose and contains eight main dimensions that’s are scientific reference , academy course, staff member , administrative system, physical facilities , student ,scientific research, graduate service , in addition each dimension involved (5) items contacted with mean dimensions, which translate aspects of performance evaluation, the questionnaire applied on two samples staff member
... Show MoreThe Main Outfall drain pumping station in Nassiriyah is an important part in operation system of the Main Outfall Drain (MOD) where it reduces the water levels in the U/S area of its and converted through Syphon freely under the Euphrates, its consists of several parts: U/S Basin, Station Building which contains 12 pumps, and Head Basin with Syphon, This station suffers from high levels especially in D/S area due to the current situation which is represented by establishing of dyke with pipes on MOD which located at 24 km from D/S of pumping station and Al-Khamisiyah Canal which located at 2.3 km from the U/S of dyke which feeds(Al Hammar Marsh) during drought season, several scenarios were adopted in order to expl
... Show MoreOptimization is essentially the art, science and mathematics of choosing the best among a given set of finite or infinite alternatives. Though currently optimization is an interdisciplinary subject cutting through the boundaries of mathematics, economics, engineering, natural sciences, and many other fields of human Endeavour it had its root in antiquity. In modern day language the problem mathematically is as follows - Among all closed curves of a given length find the one that closes maximum area. This is called the Isoperimetric problem. This problem is now mentioned in a regular fashion in any course in the Calculus of Variations. However, most problems of antiquity came from geometry and since there were no general methods to solve suc
... Show MoreThe petrophysical analysis is very important to understand the factors controlling the reservoir quality and production wells. In the current study, the petrophysical evaluation was accomplished to hydrocarbon assessment based on well log data of four wells of Early Cretaceous carbonate reservoir Yamama Formation in Abu-Amood oil field in the southern part of Iraq. The available well logs such as sonic, density, neutron, gamma ray, SP, and resistivity logs for wells AAm-1, AAm-2, AAm-3, and AAm-5 were used to delineate the reservoir characteristics of the Yamama Formation. Lithologic and mineralogic studies were performed using porosity logs combination cross plots such as density vs. neutron cross plot and M-N mineralogy plot. Thes
... Show MoreAcceptable Bit Error rate can be maintained by adapting some of the design parameters such as modulation, symbol rate, constellation size, and transmit power according to the channel state.
An estimate of HF propagation effects can be used to design an adaptive data transmission system over HF link. The proposed system combines the well known Automatic Link Establishment (ALE) together with variable rate transmission system. The standard ALE is modified to suite the required goal of selecting the best carrier frequency (channel) for a given transmission. This is based on measuring SINAD (Signal plus Noise plus Distortion to Noise plus Distortion), RSL (Received Signal Level), multipath phase distortion and BER (Bit Error Rate) fo
... Show More