Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of six oil wells were approved for the purpose of the study, where it was noted that there are many factors affecting the NPT, which differ from one well to another. Its impact was limited to drilling rig, mud pump and equipment failure. There is also a difference between the planned program and what is actually happening on the ground, due to several reasons, including human errors during the implementation of the drilling program and others due to technical errors, Misuse of equipment, in addition to human errors related to the failure to implement the drilling program.
In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreInfrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was
... Show MoreBackground: Both bladder cancer and schistosomiasis are endemic in Egypt. The former has a unique epidemiological pattern, which has been linked to bladder infestation by Schistosoma. The last decades have witnessed a great reduction in the infection rate of schistosomiasis and a decline in the incidence and changes in the patterns of bladder cancer. Whether these changes are linked to each other or a co-incidence is a subject of investigations.
Method: Literature on epidemiological data of bladder cancer and Schistosoma in Egypt was searched for in Medline, Scopus, PubMed, and Google Scholar. Furthermore, a hand search for literature and reports released by the Egyptian government and involved agencies was perfo
... Show MoreAbstract: -
The concept of joint integration of important concepts in macroeconomic application, the idea of cointegration is due to the Granger (1981), and he explained it in detail in Granger and Engle in Econometrica (1987). The introduction of the joint analysis of integration in econometrics in the mid-eighties of the last century, is one of the most important developments in the experimental method for modeling, and the advantage is simply the account and use it only needs to familiarize them selves with ordinary least squares.
Cointegration seen relations equilibrium time series in the long run, even if it contained all the sequences on t
... Show MoreAbstract Planetary nebulae (PN) represents the short phase in the life of stars with masses (0.89-7) M☉. Several physical processes taking place during the red giant phase of low and intermediates-mass stars. These processes include :1) The regular (early ) wind and the envelope ejection, 2) The thermal pulses during Asymptotic Giant Branch (AGB ) phase. In this paper it is briefly discussed how such processes affect the mass range of Planetary Nebulae(PN) nuclei(core) and their evolution, and the PN life time, and fading time for the masses which adopted. The Synthetic model is adopted. The envelope mass of star (MeN ) and transition time (ttr) calculated respectively for the parameter (MeR =1.5,2, 3×10-3 M☉). Another time scale is o
... Show MoreHigh temperature superconductor with nominal composition Bi1.6Pb0.4Sr1.8Ba0.2Ca2 Cu3O10+? was prepared by solid state reaction method. Two sets of samples have been prepared .The first one was quenched in air; the second set was quenched in liquid nitrogen. X-ray diffraction analyses showed an orthorhombic structure with two phases, high –Tc phase (2223) and low-Tc phase (2212) in addition to that impure phase was found. It has been observed that quenched in air samples display a sharp superconducting transition and a higher-Tc phase than that of the quenched in liquid nitrogen samples.
This paper proposes a novel finite-time generalized proportional integral observer (FTGPIO) based a sliding mode control (SMC) scheme for the tracking control problem of high order uncertain systems subject to fast time-varying disturbances. For this purpose, the construction of the controller consists of two consecutive steps. First, the novel FTGPIO is designed to observe unmeasurable plant dynamics states and disturbance with its higher time derivatives in finite time rather than infinite time as in the standard GPIO. In the FTGPO estimator, the finite time convergence rate of estimations is well achieved, whereas the convergence rate of estimations by classical GPIO is asymptotic and slow. Secondly, on the basis of the finite and fast e
... Show MoreConventional concretes are nearly unbendable, and just 0.1 percent of strain potential makes them incredibly brittle and stiff. This absence of bendability is a significant cause of strain failure and has been a guiding force in the production of an elegant substance, bendable concrete, also known as engineered cement composites, abbreviated as ECC. This type of concrete is capable of displaying dramatically increased flexibility. ECC is reinforced with micromechanical polymer fibers. ECC usually uses a 2 percent volume of small, disconnected fibers. Thus, bendable concrete deforms but without breaking any further than conventional concrete. This research aims to involve this type of concrete, bendable concrete, that will give solut
... Show MoreMaintenance of machine tools can be improved significantly by analyzing the operating of manufacturing process with the real-time monitoring system for 3-D single point deformation measurements. Therefore, the process of manufacturing could be optimized with less cost. Recently, wireless technology and internet of things (IOT) applied on intelligent machine has witnessed a significant advance with augmented virtuality, the analysis and the process certainly would contribute to enhance the intelligence of that machine. This paper presents a group of the wireless sensors and 3D animation technologies for data monitoring and analyzing. Three degree of freedom robotic hand structure has been selected as a prototype to be form the process of the
... Show More