At the beginning of the twentieth century distorting handling totalitarian phenomena of art, which can be called the stage of the test, transition from the theory of ideal theory and other realistic is not cushy, since it requires vision and reading and other concepts, and in light of this dialectic manifested research problem by asking the following Is affected by the design idealism and realism. Through the above mentioned questions, the researcher found rationale for addressing this problem, the study through his research, which is marked (idealism and realism in a comparative study design). And demonstrated the importance of research in the identification of the concept and the effectiveness of the two theories idealism and realism a
... Show MoreProject management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreAir-conditioning systems (ACs) are essential in hot and humid climates to ensure acceptable ambient air quality as well as thermal comfort for buildings users. It is essential to improve refrigeration system performance without increasing the effects of global warming potential (GWP) and ozone depletion potential (ODP). The main objective of this study is to evaluate the performance of an air conditioning system that operates with a liquid suction heat exchanger (LSHX) through implementing refrigerants with zero OPD and low GWP (i.e., R134a and R1234yf). Liquid suction heat exchanger (LSHX) was added to an automobile air conditioning system (AACS).When Liquid suction heat exchanger was added to the cycle, primary results indicated t
... Show MoreTitanium alloys are broadly used in the medical and aerospace sectors. However, they are categorized within the hard-to-machine alloys ascribed to their higher chemical reactivity and lower thermal conductivity. This aim of this research was to study the impact of the dry-end-milling process with an uncoated tool on the produced surface roughness of Ti6Al4V alloy. This research aims to study the impact of the dry-end milling process with an uncoated tool on the produced surface roughness of Ti6Al4V alloy. Also, it seeks to develop a new hybrid neural model based on the training back propagation neural network (BPNN) with swarm optimization-gravitation search hybrid algorithms (PSO-GS
he public federal budget of the state includes estimated figures for state revenues and expenditures for the next fiscal year. The estimation process is one of the main parts of the preparation of the general budget of the state and the accuracy in the estimation of revenues and expenditures of the most important principles that should be based on the process of making estimates and should not overestimate the assessment process to ensure the availability of funds in the future in all cases, which lead to unfair distribution of allocations, so the research aims to study The case of preparing the budget in the Directorate and how to estimate the expenditure in, by the analysis of operating budgets and identify deviations in the implementa
... Show MoreExperimental tests were conducted to investigate the thermal performance (cooling effect) of water mist system consisting of 5μm volume median diameter droplets in reducing the heat gain entering a room through the roof and the west wall by reducing the outside surface temperature due to the evaporative cooling effect during the hot dry summer of Baghdad/Iraq. The test period
was Fifty one days during the months May, June, and July 2012. The single test day consists of 16 test hours starting from 8:00 am to 12:00 pm. The results showed a reduction range of 1.71 to 15.5℃ of the roof outside surface temperature and 21.3 to 76.6% reduction in the daily heat flux entering the room through the roof compared with the case of not using w