LED is an ultra-lightweight block cipher that is mainly used in devices with limited resources. Currently, the software and hardware structure of this cipher utilize a complex logic operation to generate a sequence of random numbers called round constant and this causes the algorithm to slow down and record low throughput. To improve the speed and throughput of the original algorithm, the Fast Lightweight Encryption Device (FLED) has been proposed in this paper. The key size of the currently existing LED algorithm is in 64-bit & 128-bit but this article focused mainly on the 64-bit key (block size=64-bit). In the proposed FLED design, complex operations have been replaced by LFSR left feedback technology to make the algorithm perform more efficiently and productively. The results of the cipher/decipher analysis, 15 NIST test, comparison between proposal FLED and original LED based on the results of correlation coefficient (CC)and Cosine Similarity (CS), execution time, and throughputs showed that the proposed FLED has faster cipher and more productive than the original LED; it is also more secure than the original LED.
In this study, an analytical model depending on experimental results for InPInGaAs
avalanche photodiode at low bias was presented and the characteristics of
gain for this photodiode were determined directly by the impulse response. The
model have considered the most important mechanisms contributing the
photocurrent, they are trapping, photogeneration in the undepleted region and
charge-carriers velocity due to the built-in electrical field. Also, the bandwidth
was determined as a function to the total gain of photodiode and it was mainly
determined by diffusion and trapping processes at low gain regarding to the multilayer
structure considered in this study
Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreThe theatrical performance has an aesthetic, artistic, technical and intellectual vision presented by the theatrical director according to the dualities of theatrical form and content, which depend on the uniformity and interconnection of theatrical elements, as the vision is integrated through the harmony and fusion of these elements and the flow of their coordination with an aesthetic system within the framework of the aesthetic space of the theatrical performance, and when the heritage is presented in the performance, as there will certainly be different readings of that heritage and moving away from the iconization of the event and highlighting it in a manner that is in line with the spirit of the age.
the (researcher) tries, t
The increasing Global Competitive and the continuous improvement in information technology has led the way to the development of the modern systems and using modern techniques. One of these techniques is benchmarking style and Total Quality Management all of them are used to improve the production process and target rid from the losts on the other side.
The Benchmarking style has become a very important for all the industrial systems and the serving systems as well. And an instrument to improve their performance specially those which are suffering from the highness of the costs or waste in time on the other side.
This study aims to depend on virtual Benchmarking style in the eval
... Show MoreAt present, smooth movement on the roads is a matter which is needed for each user. Many roads, especially in urban areas geometrically improved because of the number of vehicles increase from time to time.
In this research, Highway capacity software, HCS, 2000, will be adopted to determine the effectiveness of roundabout in terms of capacity of roundabout, delay and level of service of roundabout.
The results of the analysis indicated that the Ahmed Urabi roundabout operates under level of service F with an average control delay of 300 seconds per vehicle during the peak hours.
The through movements of Alkarrada- Aljadiriya direction (Major Direction) represent the heaviest traff
... Show MoreThe paper presents the design of a system consisting of a solar panel with Single Input/Multiple Outputs (DC-DC) Buck Converter by using Simulink dialogue box tools in MATLAB software package for simulation the system. Maximum Power Point Tracking (MPPT) technique depending on Perturb and Observe (P&O) algorithm is used to control the output power of the converter and increase the efficiency of the system. The characteristics of the MSX-60 PV module is chosen in design of the system, whereas the electrical characteristics (P-V, I-V and P-I curves) for the module are achieved, that is affected by the solar radiation and temperature variations. The proposed design module has been found to be stable for any change in atmospheric tempera
... Show MoreThis research deals with unusual approach for analyzing the Simple Linear Regression via Linear Programming by Two - phase method, which is known in Operations Research: “O.R.”. The estimation here is found by solving optimization problem when adding artificial variables: Ri. Another method to analyze the Simple Linear Regression is introduced in this research, where the conditional Median of (y) was taken under consideration by minimizing the Sum of Absolute Residuals instead of finding the conditional Mean of (y) which depends on minimizing the Sum of Squared Residuals, that is called: “Median Regression”. Also, an Iterative Reweighted Least Squared based on the Absolute Residuals as weights is performed here as another method to
... Show More