Preferred Language
Articles
/
EoapRIYBIXToZYALloG8
Coupled reservoir geomechanics with sand production to minimize the sanding risks in unconsolidated reservoirs
...Show More Authors

Sand production in unconsolidated reservoirs has become a cause of concern for production engineers. Issues with sand production include increased wellbore instability and surface subsidence, plugging of production liners, and potential damage to surface facilities. A field case in southeast Iraq was conducted to predict the critical drawdown pressures (CDDP) at which the well can produce without sanding. A stress and sanding onset models were developed for Zubair reservoir. The results show that sanding risk occurs when rock strength is less than 7,250 psi, and the ratio of shear modulus to the bulk compressibility is less than 0.8 1012 psi2. As the rock strength is increased, the sand free drawdown and depletion becomes larger. The CDDP of the upper and lower sand units are 3,900 and 5,400 psi at zero depletion rate, respectively. This indicates that the sanding risk may initiate earlier at the upper sand unit. The sanding potential occurs at the perforated interval within the upper sand unit when drawdown pressures reach 2,160 psi. The sensitivity analysis shows a wide range of CDDPs when the uncertainty of rock strength is considered. This study will assist in optimizing the type of completion and minimize the sanding risk in unconsolidated reservoirs.

Crossref
Publication Date
Wed Jun 26 2019
Journal Name
The Iraqi Geological Journal
A MODIFIED WATER INJECTION TECHNIQUE TO IMPROVE OIL RECOVERY: MISHRIF CARBONATE RESERVOIRS IN SOUTHERN IRAQ OIL FIELDS, CASE STUDY
...Show More Authors

A modified water injection technique has organized by this study to improve oil recovery of the Mishrif reservoirs using polymerized alkaline surfactant water (PAS-Water) injection. It is planned to modify the existing water injection technology, first to control and balance the hazardous troublemaker reservoir facies of fifty-micron pore sizes with over 500 millidarcies permeability, along with the non-troublemaker types of less than twenty micron pore sizes with 45 to 100 millidarcies permeability. Second to control Mishrif reservoirs rock-wettability. Special core analysis under reservoir conditions of 2250 psi and 90 °C has carried out on tens of standard core plugs with heterogeneous buildup, using the proposed renewal water f

... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Thu Sep 13 2018
Journal Name
Baghdad Science Journal
Estimation of some Organophosphorus Pesticides Using Carbon Paste Electrode Coupled with Molecularly Imprinted Polymers
...Show More Authors

The aim of this study was to develop a sensor based on a carbon paste electrodes (CPEs) modified with used MIP for determination of organophosphorus pesticides (OPPs). The modified electrode exhibited a significantly increased sensitivity and selectivity of (OPPs). The MIP was prepared by thermo-polymerization method using N,N-diethylaminoethymethacrylate (NNDAA) as functional monomer, N,N-1,4-phenylenediacrylamide (NNPDA) as cross-linker, the acetonitrile used as solvent and (Opps) as the template molecule. The three OPPs (diazinon, quinalphos and chlorpyrifos) were chosen as the templates, which have been selected as base analytes which used widely in agriculture sector. The extraction efficiency of the imprinted polymers has been evaluat

... Show More
View Publication Preview PDF
Scopus (3)
Scopus Clarivate Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Journal Of Engineering
Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Mar 30 2007
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Testing of Drinking Water Reservoirs Coating
...Show More Authors

The present study refers to a ready-made three components epoxy based paint made by the Modern Paints Industries Company (Al-Za'farania, Baghdad) subjected to several tests in order to improve its specifications by optimizing the application conditions. The paint components are under the trade names: Resin (D-5547), Hardener (H-1457) and Thinner (P-851). The paint is used for painting drinking water reservoirs from inside.

View Publication Preview PDF
Publication Date
Sat Jun 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Using Random Dynamic Programming in Production Planning with Application in the midland Refineries Company
...Show More Authors

 

Abstract

     This research deals with Building A probabilistic Linear programming model  representing, the operation of production in the Middle Refinery Company (Dura, Semawa, Najaif) Considering the demand of each product (Gasoline, Kerosene,Gas Oil, Fuel Oil ).are random variables ,follows certain probability distribution, which are testing by using Statistical programme (Easy fit), thes distribution are found to be Cauchy distribution ,Erlang distribution ,Pareto distribution ,Normal distribution ,and General Extreme value distribution .              &

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects throu</p> ... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Sat Sep 30 2023
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Using cleaner production costs to achieve sustainable competitive advantage
...Show More Authors

Abstract

                Target costing and cleaner production are among the most important techniques in the field of cost and management accounting, which, when integrated, enable economic units to achieve the goal of cost management by reducing it by calculating cost more accurately than traditional methods.To achieve this, the researcher relied on the inductive approach in writing the theoretical framework for the research, relying on foreign and Arabic books, dissertations and university theses, foreign and Arabic research and periodicals related to the subject of the research, and relying on the descriptive and analytical approach in

... Show More
View Publication Preview PDF
Publication Date
Wed Apr 25 2012
Journal Name
Journal Of Chromatographic Science
Direct Acetylation and Determination of Chlorophenols in Aqueous Samples by Gas Chromatography Coupled with an Electron-Capture Detector
...Show More Authors

A method was developed that offers a rapid, simple and accurate technique for the determination of chlorophenols at trace levels in aqueous samples with very limited volumes of organic solvents. These compounds were acetylated, then preliminarily extracted with n-hexane. The enriched chlorophenols were directly analyzed using gas chromatography with an electron-capture detector. The detection limits were in the range of 0.001–0.005 mg/L, except for 2-chlorophenol, which was always above 0.013 mg/L. Relative standard deviation for the spiked water samples ranged from 2.2 to 6.1%, while relative recoveries were in the range of 67.1 to 101.3%.

View Publication
Scopus (15)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Sun Mar 31 2024
Journal Name
Iraqi Geological Journal
Determination of Reservoir Rock Type in Sarvak Reservoir of an Iranian Oilfield
...Show More Authors

Integrated reservoir rock typing in carbonate reservoirs is a significant step in reservoir modelling. The key purpose of this study is the identification of integrated rock types in the Sarvak Formation of an Iranian oilfield. In this study, electrofacies (EFAC) analysis of the Sarvak reservoir was done in detail to determine the reservoir quality and rock types of the Sarvak Formation in the studied field. The core data and conventional petrophysical logs were used for rock typing. Some petrophysical logs such as porosity, sonic, neutron, density, and Photo electric factor were applied as input data for electrofacies analysis. Multi-Resolution Graph-Based Clustering was used among six approaches, resulting in four electrofacies af

... Show More
View Publication
Scopus Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen