Sand production in unconsolidated reservoirs has become a cause of concern for production engineers. Issues with sand production include increased wellbore instability and surface subsidence, plugging of production liners, and potential damage to surface facilities. A field case in southeast Iraq was conducted to predict the critical drawdown pressures (CDDP) at which the well can produce without sanding. A stress and sanding onset models were developed for Zubair reservoir. The results show that sanding risk occurs when rock strength is less than 7,250 psi, and the ratio of shear modulus to the bulk compressibility is less than 0.8 1012 psi2. As the rock strength is increased, the sand free drawdown and depletion becomes larger. The CDDP of the upper and lower sand units are 3,900 and 5,400 psi at zero depletion rate, respectively. This indicates that the sanding risk may initiate earlier at the upper sand unit. The sanding potential occurs at the perforated interval within the upper sand unit when drawdown pressures reach 2,160 psi. The sensitivity analysis shows a wide range of CDDPs when the uncertainty of rock strength is considered. This study will assist in optimizing the type of completion and minimize the sanding risk in unconsolidated reservoirs.
Survival analysis is one of the types of data analysis that describes the time period until the occurrence of an event of interest such as death or other events of importance in determining what will happen to the phenomenon studied. There may be more than one endpoint for the event, in which case it is called Competing risks. The purpose of this research is to apply the dynamic approach in the analysis of discrete survival time in order to estimate the effect of covariates over time, as well as modeling the nonlinear relationship between the covariates and the discrete hazard function through the use of the multinomial logistic model and the multivariate Cox model. For the purpose of conducting the estimation process for both the discrete
... Show MoreA common field development task is the object of the present research by specifying the best location of new horizontal re-entry wells within AB unit of South Rumaila Oil Field. One of the key parameters in the success of a new well is the well location in the reservoir, especially when there are several wells are planned to be drilled from the existing wells. This paper demonstrates an application of neural network with reservoir simulation technique as decision tool. A fully trained predictive artificial feed forward neural network (FFNNW) with efficient selection of horizontal re-entry wells location in AB unit has been carried out with maintaining a reasonable accuracy. Sets of available input data were collected from the exploited g
... Show MoreNanoparticles (NPs) have been suggested for subsurface projects, including enhanced oil recovery (EOR), carbon capture and storage (CCS), and hydrogen storage, due to their small size, high surface energy, controlled surface properties, and significant effects on the underground formation properties. Silica is an excellent NP that efficiently modifies the surface properties of subsurface formations for incremental oil recovery and to derisk carbon and hydrogen leaks. However, the retention of injected NPs in a narrow area near the injection inlet can limit a project’s feasibility. In the present study, hydrophobic (hybrid) NPs were produced via silanization of silica NPs, and the mobility behavior of bare (hydrophilic) and hybrid
... Show MoreGas and Downhole Water Sink, Gravity Drainage, GDWS-AGD, Enhance the Recovery of Oil
The goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have ch
... Show More