The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met due to defects in design and operation and the inlet and outlet values of dissolved minerals were very close due to the absence of soluble salt removal units in AL-Muthana project
The variation of compression index Cc and swelling index Cs with the degree of saturation S was studied on unsaturated and fully saturated soils for different degrees of saturation (100%, 91%, 85%, 75%, 60%), several mathematical equations were found to describe these relationships, these equations can be used to predict settlement during the consolidation process in unsaturated and fully saturated soils.
The research aims to design an electronic program that allows users to assess the possibility of different practices for projects management professional according to the PMBOK methodology)) and using the requirements Data mentioned in the "knowledge and experience in project management Evaluation guide" issued by the professional Institute of project management According to the results of this program will be electronic The possible classification of project management in terms of both (proficiency_ perform tasks) as less than the desired level or within or above average in terms of best practices, and finally a number of recommendations to overcome the possible shortcomings. The most important is the need to enrich the service
... Show MoreThe cost-effective carbon cross-linked Y zeolite nanocrystals composite (NYC) was prepared using an eco-friendly substrate prepared from bio-waste and organic adhesive at intermediate conditions. The green synthesis method dependent in this study assures using chemically harmless compounds to ensure homogeneous distribution of zeolite over porous carbon. The greenly prepared cross-linked composite was extensively characterized using Fourier transform infrared, nitrogen adsorption/desorption, Field emission scanning electron microscope, Dispersive analysis by X-ray, Thermogravimetric analysis, and X-ray diffraction. NYC had a surface area of 176.44 m2/g, and a pore volume of 0.0573 cm3/g. NYC had a multi-function nature, sustained at a long-
... Show MoreBackground: One of the most predominant periodontal diseases is the plaque induced gingivitis. For the past 20 years, super-oxidized solutions have be..
It is from the greatness of God Almighty and from him that he facilitated for me to delve into the immersion of the hadith of the Prophet in my doctoral dissertation, then I found it a fertile ground for the cultivation of scientific results.
Through this work, I chose the topic (Replies of Al-Aini to Ibn Malik in his book Umdat Al-Qari Sharh Sahih Al-Bukhari) because of its scientific impact, as such topics inspire in the soul of the follower and the student a lot of contemplation and great care to understand the texts and then come up with a result that is almost close. It is correct, and my current situation in this research is the condition of many scholars, not without errors and omissions. Whatever was correct is by the grace of
The problem of generated waste as a result of the implementation of construction projects, has been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom
... Show MoreThis research is concerned with a new type of ferrocement characterized by its lower density and enhanced thermal insulation. Lightweight ferrocement plates have many advantages, low weight, low cost, thermal insulation, environmental conservation. This work contain two group experimental : first different of layer ferrocement, second different of ratio aggregate to cement. The experiments were made to determined the optimum proportion of cement and lightweight aggregate (recycle thermestone ). A low W/C ratio of 0.4 was used with super plasticizer conforming to ASTM 494 Type G. The compressive strength of the mortar mixes is 20-25 MPa. The work also involved the determination of thermal properties .Thermal conductivity value of thi
... Show MoreClimate change causes water shortage (water scarcity) in addition to the dams built by neighboring countries, which caused a lack of Iraq's water share. Therefore, evaluating the irrigation system requires considering its suitability, adequacy, and efficiency. Irrigation is considered adequate when it maintains water availability within the root zone, and if the amount to be added is determined, irrigation efficiency becomes possible by avoiding water loss. Babil Governorate is considered one of the agricultural governorates in the country that depends on its irrigation from Shatt Al-Hilla. The study area is the Elaj project. Three fields were selected for the project (B1, B2, and B3). These fields are lo
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show More