Preferred Language
Articles
/
EIbXLYYBIXToZYALHX5L
Construction of Comprehensive Geological Model for an Iraqi Oil Reservoir
...Show More Authors

The paper generates a geological model of a giant Middle East oil reservoir, the model constructed based on the field data of 161 wells. The main aim of the paper was to recognize the value of the reservoir to investigate the feasibility of working on the reservoir modeling prior to the final decision of the investment for further development of this oilfield. Well log, deviation survey, 2D/3D interpreted seismic structural maps, facies, and core test were utilized to construct the developed geological model based on comprehensive interpretation and correlation processes using the PETREL platform. The geological model mainly aims to estimate stock-tank oil initially in place of the reservoir. In addition, three scenarios were applied based on sensitivity and uncertainty of five variables to determine an accurate estimation of stock-tank oil initially in place of the reservoir. The oil-water contact appeared to be the major uncertain parameter for stock-tank oil initially in place estimation because the available geological and field data was not enough to demonstrate it confidently, and only 13% of the total wells have penetrated the water zone in the Mishrif formation. The results of all scenarios indicate that the reservoir has huge stock-tank oil initially in place. The importance of developing this oilfield is validated by its very high stock-tank oil. This is where the value of this study becomes obvious.

Scopus Crossref
Preview PDF
Quick Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 20 2018
Journal Name
Al-academy
Achieving an Iraqi model in contemporary fashion design
...Show More Authors

The Iraqi outfit is characterized by special features and identity that are closely related to the traditions, customs, religious and social beliefs and other references of the Iraqi environment and its factors affecting the individual and society. Every place in Iraq has its own uniform, which differs in terms of its artistic, aesthetic and functional components from place to place.

The abaya, especially worn by women, is especially distinct in terms of the design of the uniform, the nature of the cloth made of it, as well as the color of the abaya, which is dominated by black in most designs. The Dar Al-Taros Center and Textile Research initiated the construction of theoretical and practical bases in the design of contemporary

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Sep 30 2018
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Permeability Estimation for Carbonate Reservoir (Case Study/ South Iraqi Field)
...Show More Authors

 

   The heterogeneity nature of carbonate reservoirs shows sever scattering of the data, therefore, one has to be cautious in using the permeability- porosity correlation for calculating permeability unless a good correlation coefficient is available. In addition, a permeability- porosity correlation technique is not enough by itself since simulation studies also require more accurate tools for reservoir description and diagnosis of flow and non-flow units.

Evaluation of reservoir characterization  was conducted by this paper for Mishrif Formation in south Iraqi oil field (heterogeneous carbonate reservoir), namely the permeability-porosity correlation, the hydraulic units (HU’s) an

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sun Sep 30 2018
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Permeability Estimation for Carbonate Reservoir (Case Study/ South Iraqi Field)
...Show More Authors

     The heterogeneity nature of carbonate reservoirs shows sever scattering of the data, therefore, one has to be cautious in using the permeability- porosity correlation for calculating permeability unless a good correlation coefficient is available. In addition, a permeability- porosity correlation technique is not enough by itself since simulation studies also require more accurate tools for reservoir description and diagnosis of flow and non-flow units. Evaluation of reservoir characterization  was conducted by this paper for Mishrif Formation in south Iraqi oil field (heterogeneous carbonate reservoir), namely the permeability-porosity correlation, the hydraulic units (HU’s) and global hydraulic elements (GHE

... Show More
Crossref (3)
Crossref
Publication Date
Tue Jun 30 2020
Journal Name
Association Of Arab Universities Journal Of Engineering Sciences
Immiscible CO2-Assisted Gravity Drainage Process for Enhancing Oil Recovery in Bottom Water Drive reservoir
...Show More Authors

The CO2-Assisted Gravity Drainage process (GAGD) has been introduced to become one of the mostinfluential process to enhance oil recovery (EOR) methods in both secondary and tertiary recovery through immiscibleand miscible mode. Its advantages came from the ability of this process to provide gravity-stable oil displacement forenhancing oil recovery. Vertical injectors for CO2 gas have been placed at the crest of the pay zone to form a gas capwhich drain the oil towards the horizontal producing oil wells located above the oil-water-contact. The advantage ofhorizontal well is to provide big drainage area and small pressure drawdown due to the long penetration. Manysimulation and physical models of CO2-AGD process have been implemented

... Show More
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
The The Optimum Reservoir Performance of Nahr Umr/Ratawi Oil Field
...Show More Authors

Reservoir study has been developed in order to get a full interesting of the Nahr Umr formation in Ratawi oil field. Oil in place has been calculated for Nahr Umr which was 2981.37 MM BBL. Several runs have been performed to get matching between measured and calculated of oil production data and well test pressure. In order to get the optimum performance of Nahr Umr many strategies have been proposed in this study where vertical and horizontal wells were involved in addition to different production rates. The reservoir was first assumed to be developed with vertical wells only using production rate of (80000–125000) STB/day. The reservoir is also proposed to produce using horizontal wells besides vertical wells with pr

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Thu Apr 01 2021
Journal Name
Indonesian Journal Of Electrical Engineering And Computer Science
Pushing towards ehealth for iraqi hypertensives: an integrated class association rules into SECI model
...Show More Authors

<span lang="EN-GB">This paper highlights the barriers that have led to a delay in the implementation of E-Health services in Iraq. A new framework is proposed to improve the E-Health sector using a SECI model which describes how explicit and tacit knowledge is generated, transferred, and recreated in organizations through main stages (socialization, externalization, combination and internalization). Class association rules (CARs) is integrated to mine the SECI model by extracting related rules which correspond to the medical advice. The proposed framework (SECICAR) can be done through a web portal to assemble healthcare professionals, patients in one environment. SECICAR will be applied to the hypertension community to show th

... Show More
View Publication Preview PDF
Scopus (4)
Crossref (3)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
8th Engineering And 2nd International Conference For College Of Engineering – University Of Baghdad: Coec8-2021 Proceedings
Prediction of pore and fracture pressure using well logs in Mishrif reservoir in an Iraqi oilfield
...Show More Authors

View Publication
Crossref (2)
Crossref
Publication Date
Thu Jan 30 2020
Journal Name
Journal Of Engineering
The Optimum Reservoir Performance of Nahr Umr/Ratawi Oil Field
...Show More Authors

Reservoir study has been developed in order to get a full interesting of the Nahr Umr formation in Ratawi oil field. Oil in place has been calculated for Nahr Umr which was 2981.37 MM BBL. Several runs have been performed to get matching between measured and calculated of oil production data and well test pressure. In order to get the optimum performance of Nahr Umr many strategies have been proposed in this study where vertical and horizontal wells were involved in addition to different production rates. The reservoir was first assumed to be developed with vertical wells only using production rate of (80000–125000) STB/day. The reservoir is also proposed to produce using horizontal wells besides vertical wells with production rat

... Show More
Crossref