The paper generates a geological model of a giant Middle East oil reservoir, the model constructed based on the field data of 161 wells. The main aim of the paper was to recognize the value of the reservoir to investigate the feasibility of working on the reservoir modeling prior to the final decision of the investment for further development of this oilfield. Well log, deviation survey, 2D/3D interpreted seismic structural maps, facies, and core test were utilized to construct the developed geological model based on comprehensive interpretation and correlation processes using the PETREL platform. The geological model mainly aims to estimate stock-tank oil initially in place of the reservoir. In addition, three scenarios were applied based on sensitivity and uncertainty of five variables to determine an accurate estimation of stock-tank oil initially in place of the reservoir. The oil-water contact appeared to be the major uncertain parameter for stock-tank oil initially in place estimation because the available geological and field data was not enough to demonstrate it confidently, and only 13% of the total wells have penetrated the water zone in the Mishrif formation. The results of all scenarios indicate that the reservoir has huge stock-tank oil initially in place. The importance of developing this oilfield is validated by its very high stock-tank oil. This is where the value of this study becomes obvious.
Autorías: Omar Saeed Sabbar, Ali Mousa Jawad, Maher Amer Jabbar. Localización: Revista iberoamericana de psicología del ejercicio y el deporte. Nº. 3, 2023. Artículo de Revista en Dialnet.
The research aims to clarify the response of the GDP to the M1 shock. It includes access to the results using standard methods, where the standard model was built according to quarterly data using the program STATA 17. According to the joint integration model ARDL, the research found a long-term equilibrium positive for the relationship between GDP and the money supply in Iraq, as the change in the money supply by a certain percentage will lead to a change in GDP by about 71% of that percentage. In the event of a shock in the Iraqi economy, the impact of the M1 will differ from what it was before the shock, as the shock will increase its effectiveness towards GDP by about 10% more than before the shock. At the same time, the relationship
... Show MoreThe purpose of this paper is to identifying the results of the clubs participating in the men's Volleyball Premier League for the period from (1991) to (2022), archive the results of the Iraqi clubs participating in the Iraqi Premier League for men for the period from (1991) to (2022), and diagnosing and analyzing the causes of fluctuation in the participation of some Iraqi clubs in the Premier League for men for the period from (1991) to (2022). The nature of the research necessitated that the researcher use the historical approach or the so-called documentary approach, taking advantage of the historical development that took place for the participation of Iraqi clubs for men in the Premier League from (1991) until 2022), the last league h
... Show MoreThe studying trying to determine the role of Strategic Intelligence on the Process of Green Manufacturing of Sample of Mineral water factories at Dahuk city. The study submit a theoretical frame of Strategic Intelligence and Green Manufacturing, a supposed sample, had been set to reverye the nature of the relations and effect in the study Varity, the study depend on group of the main and branch concurring with the relations and effect between the Strategic Intelligence and Green Manufacturing to answer the following questions about research to problems:
What are the relationships and effects between stra
... Show MoreA (k,n)-arc is a set of k points of PG(2,q) for some n, but not n + 1 of them, are collinear. A (k,n)-arc is complete if it is not contained in a (k + 1,n)-arc. In this paper we construct complete (kn,n)-arcs in PG(2,5), n = 2,3,4,5, by geometric method, with the related blocking sets and projective codes.
In this paper,we construct complete (kn,n)-arcs in the projective plane PG(2,11), n = 2,3,…,10,11 by geometric method, with the related blocking sets and projective codes.
In this paper a system is designed and implemented using a Field Programmable Gate Array (FPGA) to move objects from a pick up location to a delivery location. This transportation of objects is done via a vehicle equipped with a robot arm and an FPGA. The path between the two locations is followed by recognizing a black line between them. The black line is sensed by Infrared sensors (IR) located on the front and on the back of the vehicle. The Robot was successfully implemented by programming the Field Programmable Gate Array with the designed system that was described as a state diagram and the robot operated properly.
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More