The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of a construction project, this study constructed the matrix of probability and impact variables and put the periods based on the risk score. Finally, this study identified a fourth main risk group and twenty-two sub-risk factors that are appropriate for the tendering phase of construction projects in Iraq
The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show MoreVariation order plays an important role in calculating the final cost and time. The paper aims to determine the causes of variation orders in projects performed between 2007-2014 in Erbil governorate projects. Data was collected from contract documents. Performed in the Erbil governorate projects from 2007-2014. The study seeks to identify the most significant causes of delays by assessing the common causes of delays in terms of frequency, severity and
important indices of owners, consultants and contractors related to&n
... Show MoreBackground: Rheumatoid arthritis (RA) is a chronic and systemic autoimmune disease that is characterized by severe synovial inflammation, cartilage erosion, bone loss, and generalized vasculopathy. Although the immunologic mechanism of RA is still unclear, it is now thought to be a primarily Th17-driven disease. Along with other factors, IL-23 stimulates the expansion of Th17 cells from naive CD4+ T cells.
Objective: The objective of this study is to assess the circulating levels of interleukin (IL)-23 in rheumatoid arthritis (RA) and determine the correlation between plasma/serum IL-23 levels and disease activity. So, we performed a systematic review with meta-analysis comparing
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreA revolution called information revolution has recently invaded the world. It is Currently considered one of the most important properties of development to the countries of the world The criteria provided by computers such as accuracy, speed, time saving Storage and restore have led them to be widely used in economy, industry, agriculture, communications, etc., as well as being the major finder of reengineering the operations of innovation. The use of computers in the preparation of budgets will lead to achieve accuracy. Since, the operation draws upon the statistic and quantity estimations about budget items, the computerized balance sheet may save time and effort of preparing mathematical equations annually. According to the problem o
... Show MoreThe degree of the woman’s satisfaction on clothing depends, to a large extent, on the body measurements. If clothing is very wide, it shows her enormous and if it is too tight it may draw attention to the defects of the body. It may also lead to the compatibility or incompatibility of clothing with fashion. Whatever the quality of the garment in terms of sewing and design, the costume which is not suitable for body size may affect the physical style negatively and may give the wearer an improper look. Clothing was carried out without measurements and did not use models (templates). The method of preparation affected the overall appearance because it often did not fit the shape of the body completely. Therefore, people thought in many w
... Show More