Objective: The aim of this study is to determine the means and the difficulties faced by students of
nursing maternal and child health nursing / College of Nursing / University of Baghdad in obtaining scientific
information in practical training.
Methodology: A purposive sample of (100) Nursing college student - Maternal and Child Health Nursing
Department were selected. Data were collected through the use of the questionnaire form during the
period from the November 2010 to April 2011. Descriptive statistical procedures were used to analyze the
data.
Results: The results showed that the highest percentage of members of the study sample aged between
(20-21 years), females are the most inhabitants of the city of Ba
Tight reservoirs have attracted the interest of the oil industry in recent years according to its significant impact on the global oil product. Several challenges are present when producing from these reservoirs due to its low to extra low permeability and very narrow pore throat radius. Development strategy selection for these reservoirs such as horizontal well placement, hydraulic fracture design, well completion, and smart production program, wellbore stability all need accurate characterizations of geomechanical parameters for these reservoirs. Geomechanical properties, including uniaxial compressive strength (UCS), static Young’s modulus (Es), and Poisson’s ratio (υs), were measured experimentally using both static and dynamic met
... Show MoreThe current study focuses on utilizing artificial intelligence (AI) techniques to identify the optimal locations of production wells and types for achieving the production company’s primary objective, which is to increase oil production from the Sa’di carbonate reservoir of the Halfaya oil field in southeast Iraq, with the determination of the optimal scenario of various designs for production wells, which include vertical, horizontal, multi-horizontal, and fishbone lateral wells, for all reservoir production layers. Artificial neural network tool was used to identify the optimal locations for obtaining the highest production from the reservoir layers and the optimal well type. Fo
This research aims to know the effectiveness of teaching with a proposed strategy according to the common Knowledge construction modelin mathematical proficiency among students of the second middle class. The researchers adopted the method of the experimental approach, as the experimental design was used for two independent and equal groups with a post-test. The experiment was applied to a sample consisting of (83) students divided into two groups: an experimental comprising (42) students and a control group, the second comprising (41) students., from Badr Shaker Al-Sayyab Intermediate School for Boys, for the first semester of the academic year (2021-2022), the two groups were rewarded in four variables: (chronological age calculated in mo
... Show MoreDue to the increasing number of people with in Iraq, it has become necessary to treat seriously this problem, which was not considered significantly to the best of researcher knowledge. Thus, the current research aims to construct a scale to measure the physical down syndromes, which distinguish them from others. It consisted of (39) items. The researcher has presented some related literature that addressed the current problem
In this work, we construct the projectively distinct (k, n)-arcs in PG (3, 4) over Galois field GF (4), where k 5, and we found that the complete (k, n)-arcs, where 3 n 21, moreover we prove geometrically that the maximum complete (k, n)-arc in PG (3, 4) is (85, 21)-arc. A (k, n)-arcs is a set of k points no n+ 1 of which are collinear. A (k, n)-arcs is complete if it is not contained in a (k+ 1, n)-arcs
The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show More