Abstract: The research aims to assess the level of readiness of the Information and Communication Technology (ICT) infrastructure for business continuity at Earthlink Telecommunications and Internet Services Company in Iraq, in light of the requirements of the international standard ISO/IEC 27031:2025. The research adopts a case study approach as an appropriate methodological framework for understanding and analyzing the organizational and technical complexity inherent in telecommunications sector organizations. To achieve the research objectives, a set of integrated data collection tools was employed, including field interviews with technical and administrative staff, a review of organizational documents and approved policies, as well as direct field observation of the ICT infrastructure environment. In addition, a checklist was developed based on the requirements of ISO/IEC 27031:2025 to assess the level of compliance and implementation. A seven-point Likert scale was also utilized to determine the actual level of application for each requirement of the standard. Furthermore, selected quality management tools, such as the Pareto chart and Ishikawa (fishbone) diagram, were applied to analyze gaps and diagnose the root causes affecting the level of readiness. The analysis results revealed that the overall compliance rate with the standard’s requirements reached 53.46%, compared to an overall gap of 46.54%, indicating a moderate level of ICT infrastructure readiness in supporting business continuity. At the level of the main clauses, Clause (8), related to core requirements and infrastructure, recorded the highest compliance rate at 64.6%, reflecting an acceptable level of technical preparedness of the infrastructure supporting service continuity. In contrast, Clause (12), concerning the Minimum Business Continuity Objective (MBCO), ranked lowest with a compliance rate of 45.8%, indicating deficiencies in defining final operational business continuity objectives and aligning them with the technical capabilities of the infrastructure. Moreover, Pareto analysis showed that only eight sub-requirements account for approximately 80% of the total gap, with the most significant weaknesses concentrated in testing and exercise programs, as well as Business Impact Analysis (BIA) requirements. In light of these findings, the study recommends adopting a formal institutional program aligned with ISO/IEC 27031:2025, developing a progressive methodology for periodic testing and exercise programs with documented improvement actions based on their outcomes, and investing in the enhancement of the existing infrastructure by strengthening redundancy capabilities and digital resilience, while directly integrating them with business continuity and disaster recovery plans.
Atorvastatin calcium (ATR) is an antihyperlipidemic agent used for lowering blood cholesterol levels. However, it is very slightly soluble in water with poor oral bioavailability, which interferes with its therapeutic action. It is classified as a class II drug according to Biopharmaceutical Classification System (low solubility and high permeability).
Steganography is a technique of concealing secret data within other quotidian files of the same or different types. Hiding data has been essential to digital information security. This work aims to design a stego method that can effectively hide a message inside the images of the video file. In this work, a video steganography model has been proposed through training a model to hiding video (or images) within another video using convolutional neural networks (CNN). By using a CNN in this approach, two main goals can be achieved for any steganographic methods which are, increasing security (hardness to observed and broken by used steganalysis program), this was achieved in this work as the weights and architecture are randomized. Thus,
... Show MoreThe research has handled an important service sector in Iraq which is the municipals sector since it is connected directly and closely with the services presented to the citizens, and because the process of accomplishing the projects needs planning and scheduling for implementing these projects according to the available financial allocating and it was no choice but finding modern methods that help succeeding the processes of planning through making use of Geographic Information system (GIS) in providing the necessary information in scheduling the projects since it is considered as one of the tools that conveys the occurred in collecting the huge amount of the locative d
... Show More