There are varieties of reasons lead for drilling horizontal wells rather than verticals. Increasing the recovery of oil, especially from thin or tight reservoir permeability is the most important parameter. East Baghdad oil field considered as a giant field with approximately more than 1billion barrel of a proved reserves accompanying recently to low production rate problems in many of the existing wells. It is important to say that presence of of horizontal wells in East Baghdad field especially by converting some of already drilled wells by re-entry drilling horizontal sections may provide one of best solutions for the primary development stage in East Baghdad field which may be followed by drilling new horizontal wells or using multilateral wells. Advance software (Well Test/FAST) has been used to convert the production data for the already drilled vertical wells to horizontals to simulate the productivity. It can be concluded that no measurements available for the ratio of anisotropy (Kv/Kh); in East Baghdad Oil Field therefore, the wells productivity has been estimated using wide range of anisotropy ratios that will help the field operator to determine exactly wells productivity. Moreover, it helps to recommend the effectiveness of applying hydraulic fracturing in improving horizontal well productivity. The results show that it could be used well EB-32 as a re-entry horizontal well with an optimum section length of 1500-2000ft wich give the best production rate. The same result could be stated for EB-10 with somewhat higher productivity than EB-32.
Significant advances in horizontal well drilling technology have been made in recent years. The conventional productivity equations for single phase flowing at steady state conditions have been used and solved using Microsoft Excel for various reservoir properties and different horizontal well lengths.
The deviation between the actual field data, and that obtained by the software based on conventional equations have been adjusted to introduce some parameters inserted in the conventional equation.
The new formula for calculating flow efficiency was derived and applied with the best proposed values of coefficients ψ=0.7 and ω= 1.4. The simulated results fitted the field data.
Various reservoir and field parameters including late
Exploitation of mature oil fields around the world has forced researchers to develop new ways to optimize reservoir performance from such reservoirs. To achieve that, drilling horizontal wells is an effective method. The effectiveness of this kind of wells is to increase oil withdrawal. The objective of this study is to optimize the location, design, and completion of a new horizontal well as an oil producer to improve oil recovery in a real field located in Iraq. “A” is an oil and gas condensate field located in the Northeast of Iraq. From field production history, it is realized the difficulty to control gas and water production in this kind of complex carbonate reservoir with vertical producer wells. In this study, a horizont
... Show MoreThe Late Cretaceous-Early Paleocene Shiranish and Aliji formations have been studied in three selected wells in Jambur Oil Field (Ja-50, Ja-53, and Ja-67) in Kirkuk, Northeastern Iraq. This study included lithostratigraphy and biostratigraphy. The Late Campanian-Maastrichtian Shiranish Formation consist mainly of thin marly and chalky limestone beds overlain by thin marl beds, with some beds of marly limestone representing an outer shelf basinal environment, the unconformable contact with the above Middle Paleocene-Early Eocene Aliji Formation contain layers of limestone with marly limestone and chalky limestone which represents an outer shelf basinal environment. Five Biozones in the Shiranish Formation were determined which are: 1
... Show MoreEMS in accordance with ISO 14001: 2015 is considered an entry point to reduce environmental impacts, especially the effects resulting from the oil industry, which is the main source of environmental pollution and waste of natural resources, since the second revision of the standard took place in September 2015. The problem of the research was manifested in the weakness in understanding the correct guidelines that must be followed in order to obtain and maintain the standard. The purpose of this research was to give a general picture of what is behind ISO14001:2015 and how it is possible to create a comprehensive base for understanding its application by seeking the gap between the actually achieved reality, standards requirements
... Show MoreGas-lift technique plays an important role in sustaining oil production, especially from a mature field when the reservoirs’ natural energy becomes insufficient. However, optimally allocation of the gas injection rate in a large field through its gas-lift network system towards maximization of oil production rate is a challenging task. The conventional gas-lift optimization problems may become inefficient and incapable of modelling the gas-lift optimization in a large network system with problems associated with multi-objective, multi-constrained, and limited gas injection rate. The key objective of this study is to assess the feasibility of utilizing the Genetic Algorithm (GA) technique to optimize t
In order to reduce hydrostatic pressure in oil wells and produce oil from dead oil wells, laboratory rig was constructed, by injecting LPG through pipe containing mixture of two to one part of East Baghdad crude oil and water. The used pressure of injection was 2.0 bar, which results the hydrostatic pressure reduction around 246 to 222 mbar and flow rate of 34.5 liter/hr fluid (oil-water), at 220 cm injection depth. Effects of other operating parameters were also studied on the behavior of two phase flow and on the production of oil from dead oil wells.
This work aims to analyze and study the bit performance in directional oil wells which leads to get experience about the drilled area by monitoring bit performance and analyzing its work. This study is concerned with Rumaila Oil Field by studying directional hole of one oil well with different angles of inclination. Drilling program was used in order to compare with used parameters (WOB, RPM and FR).in those holes. The effect of the drilling hydraulic system on the bit performance was studied as well as the hydraulic calculation can be done by using Excel program. This study suggests method which is used to predict the value of penetration rate by studying different formation type to choose the best drilling parameters t
... Show MoreHorizontal wells are of great interest to the petroleum industry today because they provide an attractive means for improving both production rate and recovery efficiency. The great improvements in drilling technology make it possible to drill horizontal wells with complex trajectories and extended for significant depths.
The aim of this paper is to present the design aspects of horizontal well. Well design aspects include selection of bit and casing sizes, detection of setting depths and drilling fluid density, casing, hydraulics, well profile, and construction of drillstring simulator. An Iraqi oil field (Ajeel field) is selected for designing horizontal well to increase the productivity. Short radius horizontal well is suggested fo
Study of determining the optimal future field development has been done in a sector of South Rumaila oil field/ main pay. The aspects of net present value (economic evaluation) as objective function have been adopted in the present study.
Many different future prediction cases have been studied to determine the optimal production future scenario. The first future scenario was without water injection and the second and third with 7500 surface bbls/day and 15000 surface bbls/day water injection per well, respectively. At the beginning, the runs have been made to 2028 years, the results showed that the optimal future scenario is continuing without water in