Wind turbine (WT) is now a major renewable energy resource used in the modern world. One of the most significant technologies that use the wind speed (WS) to generate electric power is the horizontal-axis wind turbine. In order to enhance the output power over the rated WS, the blade pitch angle (BPA) is controlled and adjusted in WT. This paper proposes and compares three different controllers of BPA for a 500-kw WT. A PID controller (PIDC), a fuzzy logic controller (FLC) based on Mamdani and Sugeno fuzzy inference systems (FIS), and a hybrid fuzzy-PID controller (HFPIDC) have been applied and compared. Furthermore, Genetic Algorithm (GA) and Particle swarm optimization (PSO) have been applied and compared in order to identify the optimal PID parameters (kp, ki, kd). The objective of GA and PSO is minimized the error signal in output power based on actual WS. The results for three different controllers show that the optimal hybrid FPIDC based on the Sugeno inference system with PSO produces the optimal results regard to reduce the error signal and stable output power under actual WS.
The control of prostheses and their complexities is one of the greatest challenges limiting wide amputees’ use of upper limb prostheses. The main challenges include the difficulty of extracting signals for controlling the prostheses, limited number of degrees of freedom (DoF), and cost-prohibitive for complex controlling systems. In this study, a real-time hybrid control system, based on electromyography (EMG) and voice commands (VC) is designed to render the prosthesis more dexterous with the ability to accomplish amputee’s daily activities proficiently. The voice and EMG systems were combined in three proposed hybrid strategies, each strategy had different number of movements depending on the combination protocol between voic
... Show MoreAbstract
Bivariate time series modeling and forecasting have become a promising field of applied studies in recent times. For this purpose, the Linear Autoregressive Moving Average with exogenous variable ARMAX model is the most widely used technique over the past few years in modeling and forecasting this type of data. The most important assumptions of this model are linearity and homogenous for random error variance of the appropriate model. In practice, these two assumptions are often violated, so the Generalized Autoregressive Conditional Heteroscedasticity (ARCH) and (GARCH) with exogenous varia
... Show MoreAbstract
The aim of this research is to concentrate on the of knowledge management activities, initial activities: (Acquisition, Selection, Generation, Assimilation, Emission) knowledge, and support activities: (Measurement, Control, Coordination, Leadership) that is manipulate and controlling in achieving knowledge management cases in organization, that’s is leads to knowledge chain model, then determining the level of membership for these activities to knowledge chain model in a sample of Iraqi organization pushed by knowledge (Universities). The research depends on check list for gaining the data required, theses check list designed by apparently in diagnosing research dimensions and measurem
... Show MoreIn some cases, researchers need to know the causal effect of the treatment in order to know the extent of the effect of the treatment on the sample in order to continue to give the treatment or stop the treatment because it is of no use. The local weighted least squares method was used to estimate the parameters of the fuzzy regression discontinuous model, and the local polynomial method was used to estimate the bandwidth. Data were generated with sample sizes (75,100,125,150 ) in repetition 1000. An experiment was conducted at the Innovation Institute for remedial lessons in 2021 for 72 students participating in the institute and data collection. Those who used the treatment had an increase in their score after
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show More