A digital elevation model (DEM) is a digital representation of ground surface topography or terrain. It can be represented as a raster (a grid of squares) and it is commonly estimated by utilizing remote sensing techniques, or from land surveying. In this research a 3D building of Baghdad university campus have been performed using DEM, where the easting, northing, and elevation of 400 locations have been obtained by field survey using global positioning system (GPS). The image of the investigated area has been extracted from QuickBird satellite sensor (with spatial resolution of 0.6 m). This image has been geo-referenced by selecting ground control points of the GPS. The rectification is running, using 1st order polynomial transformation. Estimation of the ground layer elevation is carried out by spline and IDW interpolation, the buildings have been delineated as polygons with given real heights in the second layer. The mosaic algorithm has then been applied between the two layers to perform the final DEM creation process. Finally, the estimated DEM have been used to constructing 3-D building.
A two time step stochastic multi-variables multi-sites hydrological data forecasting model was developed and verified using a case study. The philosophy of this model is to use the cross-variables correlations, cross-sites correlations and the two steps time lag correlations simultaneously, for estimating the parameters of the model which then are modified using the mutation process of the genetic algorithm optimization model. The objective function that to be minimized is the Akiake test value. The case study is of four variables and three sites. The variables are the monthly air temperature, humidity, precipitation, and evaporation; the sites are Sulaimania, Chwarta, and Penjwin, which are located north Iraq. The model performance was
... Show MoreThe research aims to determine the mix of production optimization in the case of several conflicting objectives to be achieved at the same time, therefore, discussions dealt with the concept of programming goals and entrances to be resolved and dealt with the general formula for the programming model the goals and finally determine the mix of production optimization using a programming model targets to the default case.
To damp the low-frequency oscillations which occurred due to the disturbances in the electrical power system, the generators are equipped with Power System Stabilizer (PSS) that provide supplementary feedback stabilizing signals. The low-frequency oscillations in power system are classified as local mode oscillations, intra-area mode oscillation, and interarea mode oscillations. Double input multiband Power system stabilizers (PSSs) were used to damp out low-frequency oscillations in power system. Among dual-input PSSs, PSS4B offers superior transient performance. Power system simulator for engineering (PSS/E) software was adopted to test and evaluate the dynamic performance of PSS4B model on Iraqi national grid. The res
... Show MoreThe raw material soil of Al-Sowera factory quarry (quarry soil and mixture) used for building brick industry was tested mineralogically, geochemically and geotechnically. Mineral components of soil are characterized by Clay minerals (Palygoriskite and chlorite) and nonclay minerals like calcite, quratz, feldspar, gypsum and halite. The raw material is deficient in SiO2, Al2O3, K2O, Fe2O3 and MgO, while enriched in CaO. Loss on ignition and Na2O are in suitable level and appear to be concordant with the standard. Grain size analyses show that the decreasing sand and clay, and increasing silt ratio in both quarry soil and mixture caused decreasing in strength of brick during molding and after firing. The quarry soil is characterized by high p
... Show MoreRoads irrespective of the type have specific standard horizontal distance measured at 90 degrees from a lot boundary to a development known as a setback. Non-observance of the recommended setbacks accommodated in any urban center’s master plan creates noise hazard to the public health and safety as the movement of vehicular traffic is not without the attendant noise. This study assessed noise intrusion level in shops along a section of Ibadan-Abeokuta road with due consideration to compliance with the recommended building structure setback. Analysis of noise descriptors evaluated in this study gave A-weighted equivalent sound pressure level average of 91.3 dBA, the daytime average sound level (LD) 92.27 dBA,
... Show MoreThis work involves the calculation of the cooling load in Iraqi building constructions taking in account the effect of the convective heat transfer inside the buildings. ASHRAE assumptions are compared with the Fisher and Pedersen model of estimation of internal convective heat transfer coefficient when the high rate of ventilation from ceiling inlet configuration is used. Theoretical calculation of cooling load using the Radiant Time Series Method (RTSM) is implemented on the actual tested spaces. Also the theoretical calculated cooling loads are experimentally compared by measuring the cooling load in these tested spaces. The comparison appears that using the modified Fisher and Pedersen model when large ventilation ra
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show More