Physically based modeling approach has been widely developed in recent years for the simulation of dam failure process due to the lack of field data. This paper provides and describes a physically-based model depending on dimensional analysis and hydraulic simulation methods for estimating the maximum water level and the wave propagation time from breaching of field test dams. The field physical model has been constructed in Dabbah city to represent the collapse of the Roseires dam in Sudan. Five cases of a dam failure were studied to simulate water flood conditions by changing initial water height in the reservoir (0.8, 1.0, 1.2, 1.4 and 1.5 m respectively).The physical model working under five cases, case 5 had the greatest influence of the water wave movement in the canal downstream. The results showed the collapse of the dam and the sides of the canal due to the high water levels recorded 277.001, 277.084 and 277.161 m Above Mean Sea Level (AMSL) at section 13 in the canal. The wave vanishing time was 70 minutes from the beginning of the failure at a distance of 590 m downstream. The dam collapse leads to cover the sides of the canal completely, especially at the distance of 371 m.
Following model educational offenders in collection and Alasbaka of fifth grade students preparatory in history A. M. Dr Prepared by: Dr. Bashaer Mawloud Tawfeeq, The Center of Educational and Psychological Studies Baghdad University - There is no difference statistically significant at the 0.05 level of significance between the average scores of the following students studying using model and offenders and who are studying in the usual manner (traditional) in the collection - There is no difference statistically significant at the 0.05 level of significance between the mean scores for the following students studying using model and offenders and who are studying in the usual manner (traditional) in retention Find limits: Current search
... Show MoreThis study was carried out to determine the heavy metal accumulation of Juncus rigidus Desfontaines, 1798 from three different regions of the Basrah Province in Southern of Iraq. Specifically, the concentrations of lead, nickel, and cadmium were determined in the roots, culms and leaves of the plant. The results indicated that the highest accumulation of the heavy metal was recorded in lead (Pb) 12.50± 3.58 mg kg-1and then in nickel (< 0.30). The lowest value was recorded for cadmium (< 0.05). As well, lead concentrations in J. rigidus varied in different locations and parts of the plant from undetectable in control to 12.66, 19.33, and 9.80 mg kg-1 in leaves, culm, and roots respective
... Show MoreFootball has progressed from being a ritual and a celebration to become an amateur sport, a professional sport, and now, increasingly, a commercial sport. In the analysis of football business model, the systemic approach should be adopted. If sport is regarded as one of the business sectors, then the application of business system methodology can be fully justified. The interest to create strong football business system calls for the search of the ways of popularizing football business model and boosting the economic potential of its participants. In the research literature tend to ignore the business processes within the sports business. Besides, the systemic approach in football business is usually limited to p
... Show MoreThe study aims to examine the problem of forced displacement and its social and economic problems in light of the Syrian crisis. Such an aim helps to know the difficulties and challenges facing the children of displaced families in learning, and the reasons for their lack of enrolment. It also clarifies whether there are significant statistical differences at among the attitudes of the children of the displaced families towards education regarding the following variables: (the work of the head of the family, the economic level of the family, and the work of the children). The study has adopted the descriptive-analytical approach; a questionnaire was adopted as a tool to collect information. The study was applied to a sample o
... Show MoreThere is a great operational risk to control the day-to-day management in water treatment plants, so water companies are looking for solutions to predict how the treatment processes may be improved due to the increased pressure to remain competitive. This study focused on the mathematical modeling of water treatment processes with the primary motivation to provide tools that can be used to predict the performance of the treatment to enable better control of uncertainty and risk. This research included choosing the most important variables affecting quality standards using the correlation test. According to this test, it was found that the important parameters of raw water: Total Hardn
Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More