Physically based modeling approach has been widely developed in recent years for the simulation of dam failure process due to the lack of field data. This paper provides and describes a physically-based model depending on dimensional analysis and hydraulic simulation methods for estimating the maximum water level and the wave propagation time from breaching of field test dams. The field physical model has been constructed in Dabbah city to represent the collapse of the Roseires dam in Sudan. Five cases of a dam failure were studied to simulate water flood conditions by changing initial water height in the reservoir (0.8, 1.0, 1.2, 1.4 and 1.5 m respectively).The physical model working under five cases, case 5 had the greatest influence of the water wave movement in the canal downstream. The results showed the collapse of the dam and the sides of the canal due to the high water levels recorded 277.001, 277.084 and 277.161 m Above Mean Sea Level (AMSL) at section 13 in the canal. The wave vanishing time was 70 minutes from the beginning of the failure at a distance of 590 m downstream. The dam collapse leads to cover the sides of the canal completely, especially at the distance of 371 m.
Abstract
The aim of this work is to create a power control system for wind turbines based on fuzzy logic. Three power control loop was considered including: changing the pitch angle of the blade, changing the length of the blade and turning the nacelle. The stochastic law was given for changes and instant inaccurate assessment of wind conditions changes. Two different algorithms were used for fuzzy inference in the control loop, the Mamdani and Larsen algorithms. These two different algorithms are materialized and developed in this study in Matlab-Fuzzy logic toolbox which has been practically implemented using necessary intelligent control system in electrical engineerin
... Show MoreIn petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started
... Show MoreBackground
Respiratory tract aspergillosis is a pulmonary disease cause by aspergillus species which are opportunistic fungi that mainly infect immuno-compromised patients .
Objective(s)
The present study aimed to detect the frequency of pulmonary aspergillosis among clinically suspected and under follow up tuberculosis patients conducted at Tropical Diseases Teaching Hospital, Omdurman, Khartoum State , Sudan during the period from December 2019 to November 2020.
Materials and Methods
One hundred and fifty sputum samples were collected from suspected cases of pulmonary tuberculosis and under follow up tuberculosis patients. All specimens were examined using 20% KOH and cultured on two
... Show MoreThe research discusses the most important goals and means of IGAD in making peace in Sudan and then regional peace.
The logistic regression model of the most important regression models a non-linear which aim getting estimators have a high of efficiency, taking character more advanced in the process of statistical analysis for being a models appropriate form of Binary Data.
Among the problems that appear as a result of the use of some statistical methods I
... Show MoreDiyala Governorate was exposed recently to high flood waves discharged from Hemrin Dam to Diyala River when the dam reached its full capacity. The recently recorded discharge capacity of Diyala River was reduced to just 750m3/s. This exposes cities and villages along the Diyala River to flood risk when discharging the flood waves, which may reach 3000 m3/s. It is important to manage, suggest, and design flood escapes to discharge the flood waves from Hemrin Dam away from Diyala River. This escape branches from Hemrin Lake towards Ashweicha Marsh. One dimensional hydraulic model was developed to simulate the flow within the escape by using HEC-RAS software. Eighty-two cross-sections were ext
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreThis study investigates the factors that led to the outbreak of protest movements in Sudan, since Sudan’s independence in 1956 until December 2018. The study aims to identify the role of protests in bringing about political and social transformations in Sudan, besides identifying the factors that help in the success or failure of the governments that resulted from those protests, with special emphasis on the challenges of the government of the 2018 revolution. The main results of the study reveal that the December 2018 protests are the largest in term of numbers, and witness huge participation of youth and women, and the slogans raised were national and comprehensive. However, the challenges that the transitional government is going th
... Show More
