Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction costs for diversion works which is solved by PSO method using MATLAB. The optimization model was applied to prepare the optimal design graphs.It can be noticed, at any design flowrate, optimalwater flow depth, bed width, and height of upstream and downstream cofferdams decrease with increase of the side-slope. Also, it can be observed, at any design flowrate, the construction cost increases with increase of the side-slope.
This work involves the calculation of the cooling load in Iraqi building constructions taking in account the effect of the convective heat transfer inside the buildings. ASHRAE assumptions are compared with the Fisher and Pedersen model of estimation of internal convective heat transfer coefficient when the high rate of ventilation from ceiling inlet configuration is used. Theoretical calculation of cooling load using the Radiant Time Series Method (RTSM) is implemented on the actual tested spaces. Also the theoretical calculated cooling loads are experimentally compared by measuring the cooling load in these tested spaces. The comparison appears that using the modified Fisher and Pedersen model when large ventilation ra
... Show MoreThe research aims to achieve proof of convergence between optimal costs and standard costs in calculating costs for the economic unit, support efforts aimed at adopting optimal costs in cost accounts and accounting thought in general, and achieve benefit from the theory of convergence between optimal costs and standard costs in the field of achieving actual costs in The economic unit in order to reduce and converge, and this came to address the possibility of adopting the concept of optimal costs in the production costs calculations for the purposes of rationalizing administrative decisions, and rationalizing the preparation of financial statements within management accounting.
The research concluded that
... Show MoreIn this paper , the CO2 laser receiver system is designed and studied, with wavelength laser 10.6 ?m in room temperature , and to evaluate the performance and discussion it via the package of optical design (ZEMAX), from its output the Spot Diagram is measured through RMS ,and from the Ray fan plot , the aberrations is found which is the normal error for the best focus named (under corrected ) , the other output was the Geometric Encircled Energy in the spot diagram . and found that the radius of spot diagram at 80% (R80%) from the total energy ,and focal shift .The designed system have high efficiency and low cost .