The performance evaluation process requires a set of criteria and for the purpose of measuring the level of performance achieved by the Unit and the actual level of development of its activities, and in view of the changes and of rapid and continuous variables surrounding the Performance is a reflection of the unit's ability to achieve its objectives, as these units are designed to achieve the objectives of exploiting a range of economic resources available to it, and the performance evaluation process is a form of censorship, focusing on the analysis of the results obtained from the achievement All its activities with a view to determining the extent to which the Unit has achieved its objectives using the resources available to it and h
... Show MoreIn The Name of Allah Most Gracious Most Merciful
In this research, I will deal with the significance of the imperative and the disagreement of the fundamentalists in the general requirement by dividing it into an introduction and two sections. , and the appropriate indication.
The study was carried out at field agriculture in Baghdad–Iraq in 2015. For purpose evaluated the performance the selected implements tillage, suitable tire pressure and speed tractor under silt clay loam to measured Effective field capacity, Actual Time for plowing One Donam ( hr), Appearance Tillage ( number of clods > 10 cm), Fuel consumption measure in two unit (L/Donam and L/hr) and Machinery Unit Energy Requirement ( kw.hr / Donam). Split – split plot design under randomized complete block design with three replications using Least Significant Design 5 % was used. Three factor used in this experiment included Two types of plows included Chisel and Disk plows which represented main plot, Three Tires Inflation Pressure was second fa
... Show MoreThrough the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by usin
This paper presents a robust algorithm for the assessment of risk priority for medical equipment based on the calculation of static and dynamic risk factors and Kohnen Self Organization Maps (SOM). Four risk parameters have been calculated for 345 medical devices in two general hospitals in Baghdad. Static risk factor components (equipment function and physical risk) and dynamics risk components (maintenance requirements and risk points) have been calculated. These risk components are used as an input to the unsupervised Kohonen self organization maps. The accuracy of the network was found to be equal to 98% for the proposed system. We conclude that the proposed model gives fast and accurate assessment for risk priority and it works as p
... Show MoreField trial was conducted with the aim of utilizing extract of allelopathic crop to reduce the use of synthetic herbicides in wheat fields. Sorghum extract at 12 L /ha, sunflower extract at 12 L /ha, combination of sorghum and sunflower extracts at 12 L /ha and chevalier at 25, 50 and 100% of recommended dose were applied alone or in combination with each other. Weed free and weedy check treatments were included for comparison. The experiment was conducted in a randomized complete block design with three replications. The results showed that the recommended dose of chevalier treatment recorded lowest means of weed density 15.7, 23.7, 25.3 and 27.9 weeds m-2and weeds dry weight 13.4, 16.4, 23.3 and 29.2 g m-
... Show More