Preferred Language
Articles
/
BBbXoYoBVTCNdQwCO6L4
Adaptive methods for matching problem
...Show More Authors

In this paper, we deal with the problem of general matching of two images one of them has experienced geometrical transformations, to find the correspondence between two images. We develop the invariant moments for traditional techniques (moments of inertia) with new approach to enhance the performance for these methods. We test various projections directional moments, to extract the difference between Block Distance Moment (BDM) and evaluate their reliability. Three adaptive strategies are shown for projections directional moments, that are raster (vertical and horizontal) projection, Fan-Bean projection and new projection procedure that is the square projection method. Our paper started with the description of a new algorithm that is low cost ("soft calculation"); the new procedure significantly has improved the Statistical Region Description (SRD). The new method BDM is highly accurate 98% even higher than our previous image matching modified method.

Publication Date
Mon Jan 01 2024
Journal Name
2nd International Conference For Engineering Sciences And Information Technology (esit 2022): Esit2022 Conference Proceedings
Numerical solution to inverse coefficient problem for hyperbolic equation under overspecified condition of general integral type
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Mon Apr 30 2018
Journal Name
Journal Of Theoretical And Applied Information Technology
An efficient artificial fish swarm algorithm with harmony search for scheduling in flexible job-shop problem
...Show More Authors

Flexible job-shop scheduling problem (FJSP) is one of the instances in flexible manufacturing systems. It is considered as a very complex to control. Hence generating a control system for this problem domain is difficult. FJSP inherits the job-shop scheduling problem characteristics. It has an additional decision level to the sequencing one which allows the operations to be processed on any machine among a set of available machines at a facility. In this article, we present Artificial Fish Swarm Algorithm with Harmony Search for solving the flexible job shop scheduling problem. It is based on the new harmony improvised from results obtained by artificial fish swarm algorithm. This improvised solution is sent to comparison to an overall best

... Show More
View Publication Preview PDF
Scopus (3)
Scopus
Publication Date
Fri Jul 01 2022
Journal Name
Iraqi Journal Of Science
Multi-layer Multi-objective Evolutionary Algorithm for Adjustable Range Set Covers Problem in Wireless Sensor Networks
...Show More Authors

Establishing complete and reliable coverage for a long time-span is a crucial issue in densely surveillance wireless sensor networks (WSNs). Many scheduling algorithms have been proposed to model the problem as a maximum disjoint set covers (DSC) problem. The goal of DSC based algorithms is to schedule sensors into several disjoint subsets. One subset is assigned to be active, whereas, all remaining subsets are set to sleep. An extension to the maximum disjoint set covers problem has also been addressed in literature to allow for more advance sensors to adjust their sensing range. The problem, then, is extended to finding maximum number of overlapped set covers. Unlike all related works which concern with the disc sensing model, the cont

... Show More
View Publication Preview PDF
Publication Date
Mon Jan 20 2020
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Genetic Algorithm and Particle Swarm Optimization Techniques for Solving Multi-Objectives on Single Machine Scheduling Problem
...Show More Authors

In this paper, two of the local search algorithms are used (genetic algorithm and particle swarm optimization), in scheduling number of products (n jobs) on a single machine to minimize a multi-objective function which is denoted as  (total completion time, total tardiness, total earliness and the total late work). A branch and bound (BAB) method is used for comparing the results for (n) jobs starting from (5-18). The results show that the two algorithms have found the optimal and near optimal solutions in an appropriate times.

View Publication Preview PDF
Crossref
Publication Date
Mon Jun 19 2023
Journal Name
Journal Of Engineering
A Linear Programming Method Based Optimal Power Flow Problem for Iraqi Extra High Voltage Grid (EHV)
...Show More Authors

The objective of an Optimal Power Flow (OPF) algorithm is to find steady state operation point which minimizes generation cost, loss etc. while maintaining an acceptable system performance in terms of limits on generators real and reactive powers, line flow limits etc. The OPF solution includes an objective function. A common objective function concerns the active power generation cost. A Linear programming method is proposed to solve the OPF problem. The Linear Programming (LP) approach transforms the nonlinear optimization problem into an iterative algorithm that in each iteration solves a linear optimization problem resulting from linearization both the objective function and constrains. A computer program, written in MATLAB environme

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Mar 01 2009
Journal Name
Al-khwarizmi Engineering Journal
Multidimensional Systolic Arrays of LMS Algorithm Adaptive (FIR) Digital Filters
...Show More Authors

A multidimensional systolic arrays realization of LMS algorithm by a method of mapping regular algorithm onto processor array, are designed. They are based on appropriately selected 1-D systolic array filter that depends on the inner product sum systolic implementation. Various arrays may be derived that exhibit a regular arrangement of the cells (processors) and local interconnection pattern, which are important for VLSI implementation. It reduces latency time and increases the throughput rate in comparison to classical 1-D systolic arrays. The 3-D multilayered array consists of 2-D layers, which are connected with each other only by edges. Such arrays for LMS-based adaptive (FIR) filter may be opposed the fundamental requirements of fa

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 08 2017
Journal Name
International Journal Of Information Technology And Computer Science
Adaptive Modeling of Urban Dynamics during Armada Event using CDRs
...Show More Authors

View Publication
Crossref
Publication Date
Tue Aug 31 2021
Journal Name
Karbala International Journal Of Modern Science
Adaptive reconstruction of the heterogeneous scan line ETM+ correction technique
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Jun 01 2021
Journal Name
2021 Ieee/cvf Conference On Computer Vision And Pattern Recognition Workshops (cvprw)
Alps: Adaptive Quantization of Deep Neural Networks with GeneraLized PositS
...Show More Authors

View Publication
Scopus (9)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Wed Aug 31 2022
Journal Name
Iraqi Journal Of Science
Self-adaptive Differential Evolution based Optimized MIMO Beamforming 5G Networks
...Show More Authors

     The industrial factory is one of the challenging environments for future wireless communication systems, where the goal is to produce products with low cost in short time. This high level of network performance is achieved by distributing massive MIMO that provides indoor networks with joint beamforming that enhances 5G network capacity and user experience as well. Judging from the importance of this topic, this study introduces a new optimization problem concerning the investigation of multi-beam antenna (MBA) coverage possibilities in 5G network for indoor environments, named Base-station Beams Distribution Problem (BBDP). This problem has an extensive number of parameters and constrains including user’s location, required d

... Show More
View Publication
Scopus (4)
Crossref (2)
Scopus Crossref