An analytical approach based on field data was used to determine the strength capacity of large diameter bored type piles. Also the deformations and settlements were evaluated for both vertical and lateral loadings. The analytical predictions are compared to field data obtained from a proto-type test pile used at Tharthar –Tigris canal Bridge. They were found to be with acceptable agreement of 12% deviation.
Following ASTM standards D1143M-07e1,2010, a test schedule of five loading cycles were proposed for vertical loads and series of cyclic loads to simulate horizontal loading .The load test results and analytical data of 1.95
... Show MoreAbstract
Metal cutting processes still represent the largest class of manufacturing operations. Turning is the most commonly employed material removal process. This research focuses on analysis of the thermal field of the oblique machining process. Finite element method (FEM) software DEFORM 3D V10.2 was used together with experimental work carried out using infrared image equipment, which include both hardware and software simulations. The thermal experiments are conducted with AA6063-T6, using different tool obliquity, cutting speeds and feed rates. The results show that the temperature relatively decreased when tool obliquity increases at different cutting speeds and feed rates, also it
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
Education is the most powerful and important weapon in fighting poverty and unemployment because it provides students with new skills that appropriate the new market requirements and fair distribution of natural resources. It also transfers knowledge, skills, and ethics over generations. Education aims to create effective leaders who go under training and rehabilitation process, create a new human and instill faith, generate the creativity and innovation, and keep abreast with scientific process, updating curriculum, and finally, applying the technical education
There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreSorghum cultivation is often accompanied by low field emergence rates and weak seedlings, which may be due to genetic or environmental stress. A factorial experiment was conducted in the spring and fall seasons of 2022 using a randomized complete block design with split-plot arrangement and four replications. Planting dates (spring season: Feb. 15th, Mar. 1st, 15th, and Apr. 1st, 15th; fall season: Jun. 15th, Jul. 1st, 15th, and Aug. 1st, 15th) were allocated to the main plots. Seeds stimulation treatments (35% banana peel extract + 100 mg L-1 citric acid and distilled water soaking treatment only) were allocated to the subplots. The interaction treatment (banana peel extract + citric acid) with the planting date of April 15 showed the high
... Show MoreThe technology of subsurface soil water retention (SWRT) uses a polyethylene trough that is fixed under the root zone of the plant. It is a modern technology to increase the values of water use efficiency, plant productivity and saving irrigation water by applying as little irrigation water as possible. This study work aims at improving the crop yield and water use efficiency of a cucumber plant with less applied irrigation water by installing membrane trough below the soil surface. The field experiment was conducted in the Hawr Rajab District of Baghdad Governorate in Winter 2018 for testing various trickle irrigation systems. Two agricultural treatment plots were utilized in a greenhouse for the compa
... Show MoreThe technology of subsurface soil water retention (SWRT) uses a polyethylene trough that is fixed under the root zone of the plant. It is a modern technology to increase the values of water use efficiency, plant productivity and saving irrigation water by applying as little irrigation water as possible. This study work aims at improving the crop yield and water use efficiency of a cucumber plant with less applied irrigation water by installing membrane trough below the soil surface. The field experiment was conducted in the Hawr Rajab District of Baghdad Governorate in Winter 2018 for testing various trickle irrigation systems. Two agricultural treatment plots were utilized in a greenhouse for the comparison. Plot T1 has used a subsurface t
... Show More