Inundation floodingmap aimedto find outearly warningsto avoidenvironmental damageandhumanin terms of theheight ofthe wave ofwater, speed time arrival, effects of inundation sideanddepth of the water/ distanceand reduce the impact of the flood wave after obtaining the process of collapse of the dam in the lower part of the river to the dam area. The study has been using a numerical model one-dimensional depends on the development of equations (Saint-Venant) so that parts of the river, any river channel main banks of the right and left treated as separate parts, that’s the difference in the characteristics of the hydraulic and engineering, along the line of the flow will take into account in each section of the sections and flow in the river valley. Throughapplied numerical model of the Nile River in the area between the Roseires dam and Khartoum is distance (630 km) south of Khartoum , to get a jest analysis of the impact of a wave of flooding in the river on the following parameters : the maximum discharge , the maximum of attributed, as underdevelopment of the discharge maximum , and the time defaults to the maximum level and the surface area on the banks of the river and its extension and different values of the coefficient of manning roughness to the banks of the river. Eight scenario have been prepared for the flood wave read to compare the effect amount of water flow in the channel resulting from the collapse of the dam was resulting of Roseires dam , eight scenario to represent the five and extract the resulting values of Inundation map to cities located on the downstream of the dam.Thefive scenarioswerecalculated by using (HEC-RAS 4.1.0), (HEC-GeoRAS)a GIS programs and the flood wave resulting from the collapse of the Roseires dam to compare the results showed that the scenario NO. 5 is the best scenario result from the collapse makes sense due to the form of the disposal of the flood wave resulting from the collapse of the Roseires dam and then get overtopping from Sennar dam to the inability of the reservoir and dam to stop the flood wave. The results also indicate that the time needed to reach the greatest discharge of the flood wave resulting from the collapse of the Roseires dam to the city of Khartoum is ( 4, 6, 7and 9 ) day on the cities ( Roseires , Sennar , Wad Medani and Khartoum ) respectively, of the cases . The maximum height of the flood wave reaching the city of Khartoum has given the scenario NO. 5 by height wave (3-50) meters respectively. As well as the delay in the arrival time of the maximum height of the flood wave to the city of Khartoum is one day for the five scenarios compared to the other. The Inundation map development resulting from the collapse of the Roseires dam and get the flow overtopping the Sennar dam, arrival to Khartoum, was determined the surface area of the affected river and both banks of the depth of the wave and latency along the river has been selected four major cities along the river which Roseires,Sennar, Wad Medani and Khartoum.
A mathematical model and associated computer program were developed to simulate the steady state operation of wiped film evaporators for the concentration of glycerol-water solution. In this model, various assumptions were made to facilitate the mathematical model of the wiped film evaporator. The fundamental phenomena described were: sensible heating of the solution and vaporization of water. Physical property data were coded into the computer program, which performs the calculations of this model. Randomly selected experiments were carried out in a small scale wiped film evaporator from ALVAL COMPANY, using different concentrations of the glycerol solution (10, 30 and 50 Wt. %) for different feed rates (30, 50, 80, 100 and 120 l/h) and
... Show MoreA flight simulation programme has been developed on a personal computer using Microsoft
FORTRAN to simulate flight trajectories of a light aircraft by using Six-Degree-of-Freedom
equation of motion. The simulation has been made realistic through pre-programmed the input to
the control surfaces, atmospheric gust during the flight mode. The programme plays an important
role in the evaluation and validation of the aircraft design process. A light aircraft (Cessna 182T)
has been tested through free flight, gliding flight, flight with gust. The results show good trend and
show that the programme could be dependent as a realistic flight test programme.
Grass trimming operation is widely done in Malaysia for the purpose of maintaining highways. Large number of operators engaged in this work encounters high level of noise generated by back pack type grass trimmer used for this purpose. High level of noise exposure gives different kinds of ill effect on human operators. Exact nature of deteriorated work performance is not known. For predicting the work efficiency deterioration, fuzzy tool has been used in present research. It has been established that a fuzzy computing system will help in identification and analysis of fuzzy models fuzzy system offers a convenient way of representing the relationships between the inputs and outputs of a system in the form of IF-THEN rules. The paper presents
... Show MoreIn this study, a one-dimensional model represented by Butler-Volmer-Monod (BVM) model was proposed to compute the anode overpotential and current density in a mediator-less MFC system. The system was fueled with various organic loadings of real field petroleum refinery oily sludge to optimize the favorable organic loading for biomass to operate the suggested system. The increase in each organic loading showed higher resistance to electrons transport to the anode represented by ohmic loss. On the contrary, both activation and mass transfer losses exhibited a noticeable decrement upon the increased organic loadings. However, current density was improved throughout all increased loads achieving a maximum current density of 5.2 A/m3
... Show MoreWellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie