Inundation floodingmap aimedto find outearly warningsto avoidenvironmental damageandhumanin terms of theheight ofthe wave ofwater, speed time arrival, effects of inundation sideanddepth of the water/ distanceand reduce the impact of the flood wave after obtaining the process of collapse of the dam in the lower part of the river to the dam area. The study has been using a numerical model one-dimensional depends on the development of equations (Saint-Venant) so that parts of the river, any river channel main banks of the right and left treated as separate parts, that’s the difference in the characteristics of the hydraulic and engineering, along the line of the flow will take into account in each section of the sections and flow in the river valley. Throughapplied numerical model of the Nile River in the area between the Roseires dam and Khartoum is distance (630 km) south of Khartoum , to get a jest analysis of the impact of a wave of flooding in the river on the following parameters : the maximum discharge , the maximum of attributed, as underdevelopment of the discharge maximum , and the time defaults to the maximum level and the surface area on the banks of the river and its extension and different values of the coefficient of manning roughness to the banks of the river. Eight scenario have been prepared for the flood wave read to compare the effect amount of water flow in the channel resulting from the collapse of the dam was resulting of Roseires dam , eight scenario to represent the five and extract the resulting values of Inundation map to cities located on the downstream of the dam.Thefive scenarioswerecalculated by using (HEC-RAS 4.1.0), (HEC-GeoRAS)a GIS programs and the flood wave resulting from the collapse of the Roseires dam to compare the results showed that the scenario NO. 5 is the best scenario result from the collapse makes sense due to the form of the disposal of the flood wave resulting from the collapse of the Roseires dam and then get overtopping from Sennar dam to the inability of the reservoir and dam to stop the flood wave. The results also indicate that the time needed to reach the greatest discharge of the flood wave resulting from the collapse of the Roseires dam to the city of Khartoum is ( 4, 6, 7and 9 ) day on the cities ( Roseires , Sennar , Wad Medani and Khartoum ) respectively, of the cases . The maximum height of the flood wave reaching the city of Khartoum has given the scenario NO. 5 by height wave (3-50) meters respectively. As well as the delay in the arrival time of the maximum height of the flood wave to the city of Khartoum is one day for the five scenarios compared to the other. The Inundation map development resulting from the collapse of the Roseires dam and get the flow overtopping the Sennar dam, arrival to Khartoum, was determined the surface area of the affected river and both banks of the depth of the wave and latency along the river has been selected four major cities along the river which Roseires,Sennar, Wad Medani and Khartoum.
Six house-hold Abyssinian pumps distributed in different villages of Mansoura (Mans-I, Mans-II and Mans-III) and Talkha (Talk-I, Talk-II and Talk-III) cities, Egypt, have been selected for regular seasonal water quality assessment during 2017. Water samples have been collected within the mid-periods of four seasons Standard assessment tools were employed for the integrated water quality assessment including Water Quality Index (WQI) and ISO standard algal toxicity test. WQI displayed remarkable local and seasonal variations with excellent (≥ 90) and good (70 - 89) only recorded for water samples collected from Mans-I pump located in sparsely populated area and far 50 meters only from the eastern (Damietta) branch of Nile River. WQI of
... Show MoreThis paper proposes a completion that can allow fracturing four zones in a single trip in the well called “Y” (for confidential reasons) of the field named “X” (for confidential reasons). The steps to design a well completion for multiple fracturing are first to select the best completion method then the required equipment and the materials that it is made of. After that, the completion schematic must be drawn by using Power Draw in this case, and the summary installation procedures explained. The data used to design the completion are the well trajectory, the reservoir data (including temperature, pressure and fluid properties), the production and injection strategy. The results suggest that multi-stage hydraulic fracturing can
... Show MorePID (proportional-integral-derivative) and Mu controllers are widely used in electro-hydraulic servo systems due to their effectiveness and ease of implementation. This paper explores using particle swarm optimization (PSO) for tuning traditional and robust PID controllers, along with D-K iteration for Mu controller tuning. Three controller types: conventional PID (CPID), robust PID (RPID), and structured singular value controllers are developed, while analyzing multiplicative uncertainty with six uncertain coefficients. Their findings indicated that both PID (CPID and RPID) and Mu controllers maintained system stability. Notably, the Mu controller can handle coefficient uncertainty without a pure integral term, while the RPID controller de
... Show MoreIn this paper, the Active Suspension System (ASS) of road vehicles was investigated. In addition to the conventional stiffness and damper, the proposed ASS includes a fuzzy controller, a hydraulic actuator, and an LVDT position sensor. Furthermore, this paper presents a nonlinear model describing the operation of the hydraulic actuator as a part of the suspension system. Additionally, the detailed steps of the fuzzy controller design for such a system are introduced. A MATLAB/Simulink model was constructed to study the proposed ASS at different profiles of road irregularities. The results have shown that the proposed ASS has superior performance compared to the conventional Passive Suspension System (PSS), where the body displacemen
... Show MorePerennial biofuel and cover crops systems are important for enhancing soil health and can provide numerous soil, agricultural, and environmental benefits. The study objective was to investigate the effects of cover crops and biofuel crops on soil hydraulic properties relative to traditional management for claypan soils. The study site included selected management practices: cover crop (CC) and no cover crop (NC) with corn/soybean rotation, switchgrass (SW), and miscanthus (MI). The CC mixture consisted of cereal rye, hairy vetch, and Austrian winter pea. The research site was located at Bradford Research Center in Missouri, USA, and was implemented on a Mexico silt loam. Intact soil cores (76‐mm diam. by 76‐mm long) were taken from the
... Show MoreThe research aims to know the impact of science, technology, engineering, and mathematics education on both creative thinking and mathematical achievement. To achieve it, the two researchers followed the quasi-experimental approach with an experimental design for two groups, one experimental and the other a control. The research sample consisted of (32) female students from the fourth scientific grade in Al-Intisar Preparatory School for Girls/ AlRasafa, First Directorate. The sample was chosen intentionally and was divided into two groups: a control group studying by the traditional method, their number (16), and an experimental group that applied the STEM approach, their number also (16). There was parity between the two research groups i
... Show MoreDifferent methods of encryption that are widely used in smart card have been presented. Because of the usefulness and widespread application of Food Ration Card throughout our country, three models of designing and simulations are developed. A comparison between the different models is done. The first model is the Food Ration Card without using any security method. The second model is the Food Ration Card with using an AES algorithm as a security method. The third model is the Food Ration Card with using RSA method. All models are implemented and simulated using BasicCard Development kit Environment. For the first model, a Compact BasicCard version ZC1.1 is used. While for the second and third models, a Professional BasicCard versi
... Show More