Preferred Language
Articles
/
B4bMLYYBIXToZYALhX4k
Effect of well scheduling and pattern on project development management in unconventional tight gas reservoirs
...Show More Authors

The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number of wells per that section was investigated using the net present value (NPV) economic indicator assuming that the production process in all wells starts at the same time (base case). After that, three drilling schedules and patterns namely infill, linear, and hybrid were studied to examine the effect of two timing scenarios known as a fixed point in time and percentage of cumulative production (including the 37.5% EUR (estimated ultimate recovery) and the 62.5% EUR). It was shown that base case and infill drilling have the highest NPV values followed by hybrid and linear patterns in all the timing scenarios. However, the base case and infill drilling scheduling were more sensitive to the development time than hybrid and linear patterns. Additionally, the optimal number of wells per section was found to be a clear function of drilling pattern and lease time. The optimal number of wells (assuming 20 years lease period) was higher in the base case and infill pattern compared to the hybrid and linear pattern. The current study aims to help operators understand how well scheduling and pattern can change the optimal number of wells and thus aid them to reach educated decisions regarding the optimal development plan for the section under the lease. This study can also help operators to develop their management plan by selecting the best drilling pattern and timing to ensure the best return on investment.

Crossref
View Publication
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Mon Jan 13 2020
Journal Name
Day 3 Wed, January 15, 2020
Numerical Simulation of Gas Lift Optimization Using Genetic Algorithm for a Middle East Oil Field: Feasibility Study
...Show More Authors
<p>Gas-lift technique plays an important role in sustaining oil production, especially from a mature field when the reservoirs’ natural energy becomes insufficient. However, optimally allocation of the gas injection rate in a large field through its gas-lift network system towards maximization of oil production rate is a challenging task. The conventional gas-lift optimization problems may become inefficient and incapable of modelling the gas-lift optimization in a large network system with problems associated with multi-objective, multi-constrained, and limited gas injection rate. The key objective of this study is to assess the feasibility of utilizing the Genetic Algorithm (GA) technique to optimize t</p> ... Show More
View Publication
Scopus (15)
Crossref (8)
Scopus Crossref
Publication Date
Mon Jul 01 2024
Journal Name
Iop Conference Series: Earth And Environmental Science
Effect of Nitrogen and Sulfur Fertilizers on Growth and Yield of Canola
...Show More Authors
Abstract<p>For the purpose of determining the impact of three levels of nitrogen fertilizer (0, 60, and 120 kg.ha<sup>-1</sup>) and sulfur fertilizer (0, 40, and 60 kg.ha<sup>-1</sup>) on production and growth indicators (number of leaves, number of branches, chlorophyll pigments, and fresh and dry weights), a field experiment was carried out during the winter season (2021/2022) in the fields of Al-Diwaniyah Province, Ministry of Agriculture, Diwaniyah Agriculture Directorate, Al-Nouriyah Forest Division. Means were compared using the least significant difference test (LSD) at a 0.05 level of probability. In a factorial experiment employing a wholly randomized block design wi</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Tue Jun 01 2021
Journal Name
International Journal Of Agricultural And Statistical Sciences
Effect of phosphorous and amino acid on growth and yield of pea
...Show More Authors

Scopus (5)
Scopus
Publication Date
Mon Apr 01 2019
Journal Name
International Journal Of Electrical And Computer Engineering (ijece)
Managing usability evaluation practices in agile development environments
...Show More Authors

<span lang="EN-US">Usability evaluation is a core usability activity that minimizes risks and improves product quality. The returns from usability evaluation are undeniable. Neglecting such evaluation at the development stage negatively affects software usability. In this paper, the authors develop a software management tool used to incorporate usability evaluation activities into the agile environment. Using this tool, agile development teams can manage a continuous evaluation process, tightly coupled with the development process, allowing them to develop high quality software products with adequate level of usability. The tool was evaluated through verification, followed by the validation on satisfaction. The evaluation resu

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Sat Jun 28 2025
Journal Name
Al-kitab Journal For Human Sciences (kjhs)
University Education Administration in Achieving Sustainable Environmental Development
...Show More Authors

The aim of the research is to identify the role of university education management in achieving sustainable environmental development.

View Publication
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
The sustainable urban development in Al_Kharkh historic center
...Show More Authors

The problems of urban historic centers are considered some of the subjects which are widely dealt with in urban studies since the middle of the 20th century. literature of urban development have raised it , beside the fact that large number of urban development projects of the historical centers in many cities of the world ,and emerged from the application of these new problems projects added their original urban problems , because these projects have dealt with the physical structures with the neglect of the social and economic sides, which are the base in sustainable development nResearch problem was elaborated as : The unclearly of knowledge of the potentials of the sustainable development in solving the urban problems of historic cen

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Mar 04 2012
Journal Name
Baghdad Science Journal
Oilfield Produced Water Management: Treatment, Reuse and Disposal
...Show More Authors

Produced water is accompanied with the production of oil and gas especially at the fields producing by water drive or water injection. The quantity of these waters is expected to be more complicated problem with an increasing in water cut which is expected to be 3-8 barrels water/produced barrel oil.Produced water may contain many constituents based on what is present in the subsurface at a particular location. Produced water contains dissolved solids and hydrocarbons (dissolved and suspended) and oxygen depletion. The most common dissolved solid is salt with concentrations range between a few parts per thousand to hundreds parts per thousand. In addition to salt, many produced waters also contain high levels of heavy metals like zinc, bari

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Mon Aug 01 2022
Journal Name
Bulletin Of Electrical Engineering And Informatics
Solid waste recycling and management cost optimization algorithm
...Show More Authors

Solid waste is a major issue in today's world. Which can be a contributing factor to pollution and the spread of vector-borne diseases. Because of its complicated nonlinear processes, this problem is difficult to model and optimize using traditional methods. In this study, a mathematical model was developed to optimize the cost of solid waste recycling and management. In the optimization phase, the salp swarm algorithm (SSA) is utilized to determine the level of discarded solid waste and reclaimed solid waste. An optimization technique SSA is a new method of finding the ideal solution for a mathematical relationship based on leaders and followers. It takes a lot of random solutions, as well as their outward or inward fluctuations, t

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (5)
Scopus Crossref
Publication Date
Tue Oct 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Using Benford’s law to detecting earnings management Application on a sample of listed companies in the Iraqi market for securities
...Show More Authors

 

Abstract

The net profit reported in the annual financial statements of the companies listed in the financial markets, is considered one of the Sources of information relied upon by users of accounting information in making their investment decisions. At the same time be relied upon in calculating the bonus (Incentives) granted to management, therefore the management of companies to manipulate those numbers in order to increase those bonuses associated to earnings, This practices are called earnings management practices. the manipulation in the figures of earnings by management will mislead the users  of financial statements who depend on reported earnings in their deci

... Show More
View Publication Preview PDF
Crossref