The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number of wells per that section was investigated using the net present value (NPV) economic indicator assuming that the production process in all wells starts at the same time (base case). After that, three drilling schedules and patterns namely infill, linear, and hybrid were studied to examine the effect of two timing scenarios known as a fixed point in time and percentage of cumulative production (including the 37.5% EUR (estimated ultimate recovery) and the 62.5% EUR). It was shown that base case and infill drilling have the highest NPV values followed by hybrid and linear patterns in all the timing scenarios. However, the base case and infill drilling scheduling were more sensitive to the development time than hybrid and linear patterns. Additionally, the optimal number of wells per section was found to be a clear function of drilling pattern and lease time. The optimal number of wells (assuming 20 years lease period) was higher in the base case and infill pattern compared to the hybrid and linear pattern. The current study aims to help operators understand how well scheduling and pattern can change the optimal number of wells and thus aid them to reach educated decisions regarding the optimal development plan for the section under the lease. This study can also help operators to develop their management plan by selecting the best drilling pattern and timing to ensure the best return on investment.
The research aims to determine the strength of the relationship between time management and work pressure and administrative leadership, where he was taken a sample of (47) of the administrative leadership at the Higher Institute of security and administrative development in the Ministry of Interior was used questionnaire as a key tool in collecting data and information and analyzed the answers to the sample surveyed by using Statistical program (spss) in the arithmetic mean of the calculation and test (t) and the correlation coefficient, the research found the most important results: the existence of significant moral positive relationship between both time management and work pressure and administrative leadership, the leadership of th
... Show MoreThe study aimed to identify the role of public relations management in its dimensions (mental image, media, advertising, and the public) on green human resource management practices in Jordanian private hospitals in Amman, and this study relied on the quantitative approach (descriptive and analytical) to test hypotheses. Where the questionnaire was relied upon to collect data and their number was (1771) workers, and the study population consisted of workers in the hospitals that were studied on them and their number was 10 hospitals, where 316 questionnaires were distributed, 300 questionnaires were retrieved, and 16 questionnaires were not valid for analysis. That is, 91.7% of the sample, and the study relied on proportional stratified
... Show MoreMechanical rock properties are essential to minimize many well problems during drilling and production operations. While these properties are crucial in designing optimum mud weights during drilling operations, they are also necessary to reduce the sanding risk during production operations. This study has been conducted on the Zubair sandstone reservoir, located in the south of Iraq. The primary purpose of this study is to develop a set of empirical correlations that can be used to estimate the mechanical rock properties of sandstone reservoirs. The correlations are established using laboratory (static) measurements and well logging (dynamic) data. The results support the evidence that porosity and sonic travel time are consistent i
... Show MoreTight oil reservoirs have been a concerned of the oil industry due to their substantial influence on oil production. Due to their poor permeability, numerous problems are encountered while producing from tight reservoirs. Petrophysical and geomechanical rock properties are essential for understanding and assessing the fracability of reservoirs, especially tight reservoirs, to enhance permeability. In this study, Saadi B reservoir in Halfaya Iraqi oil field is considered as the main tight reservoir. Petrophysical and geomechanical properties have been estimated using full-set well logs for a vertical well that penetrates Saadi reservoir and validated with support of diagnostic fracture injection test data employing standard equations
... Show MoreThe research aims to apply one of the techniques of management accounting, which is the Quality Function Deployment(QFD) on the Pepsi product in Baghdad Soft Drinks Company and to determine the technical requirements objectively that have been applied in practice in Baghdad Soft Drinks Company / a private shareholding company, as it focuses on meeting the quality requirements and achieving positive quality to provide a product It meets the requirements of current and future customers, hence the importance of research that indicates that the Quality Function Deployment(QFD) is a useful tool to develop the requirements of new products, being a design process driven by customers through their voices, and thus contribute to achieve a competi
... Show MoreThe current study aims to investigate the effect of strategic knowledge management practices on an excellent performance at the Institution of Industrial Development and Research- the Ministry of Iraqi Industry (IDRMII). The present research is designed according to the descriptive method. To achieve the mentioned research objective, the researchers used the questionnaire as the main data collection tool. The research sample was 150 managers who are working at the top and middle management levels. To analyses the data gathered and reaching the results, several statistical techniques were used within AMOS.V25, SPSS.V21Software, This study reached a set of results, the most important of which is the existence of a positive correlat
... Show MoreThis research was aimed to determine the petrophysical properties (porosity, permeability and fluid saturation) of a reservoir. Petrophysical properties of the Shuiaba Formation at Y field are determined from the interpretation of open hole log data of six wells. Depending on these properties, it is possible to divide the Shuiaba Formation which has thickness of a proximately 180-195m, into three lithological units: A is upper unit (thickness about 8 to 15 m) involving of moderately dolomitized limestones; B is a middle unit (thickness about 52 to 56 m) which is composed of dolomitic limestone, and C is lower unit ( >110 m thick) which consists of shale-rich and dolomitic limestones. The results showed that the average formation water
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show More