Preferred Language
Articles
/
B4bMLYYBIXToZYALhX4k
Effect of well scheduling and pattern on project development management in unconventional tight gas reservoirs
...Show More Authors

The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number of wells per that section was investigated using the net present value (NPV) economic indicator assuming that the production process in all wells starts at the same time (base case). After that, three drilling schedules and patterns namely infill, linear, and hybrid were studied to examine the effect of two timing scenarios known as a fixed point in time and percentage of cumulative production (including the 37.5% EUR (estimated ultimate recovery) and the 62.5% EUR). It was shown that base case and infill drilling have the highest NPV values followed by hybrid and linear patterns in all the timing scenarios. However, the base case and infill drilling scheduling were more sensitive to the development time than hybrid and linear patterns. Additionally, the optimal number of wells per section was found to be a clear function of drilling pattern and lease time. The optimal number of wells (assuming 20 years lease period) was higher in the base case and infill pattern compared to the hybrid and linear pattern. The current study aims to help operators understand how well scheduling and pattern can change the optimal number of wells and thus aid them to reach educated decisions regarding the optimal development plan for the section under the lease. This study can also help operators to develop their management plan by selecting the best drilling pattern and timing to ensure the best return on investment.

Crossref
View Publication
Publication Date
Mon Jan 01 2024
Journal Name
Fusion: Practice And Applications
Optimizing Task Scheduling and Resource Allocation in Computing Environments using Metaheuristic Methods
...Show More Authors

Optimizing system performance in dynamic and heterogeneous environments and the efficient management of computational tasks are crucial. This paper therefore looks at task scheduling and resource allocation algorithms in some depth. The work evaluates five algorithms: Genetic Algorithms (GA), Particle Swarm Optimization (PSO), Ant Colony Optimization (ACO), Firefly Algorithm (FA) and Simulated Annealing (SA) across various workloads achieved by varying the task-to-node ratio. The paper identifies Finish Time and Deadline as two key performance metrics for gauging the efficacy of an algorithm, and a comprehensive investigation of the behaviors of these algorithms across different workloads was carried out. Results from the experiment

... Show More
View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Sun Sep 01 2019
Journal Name
African Journal Of Hospitality, Tourism And Leisure
Effect of Employees' Abilities on Successful ICT Application and Sustainable Development Goals: a Descriptive Study in hospitality Organizations in Iraq
...Show More Authors

The aim of this study is to evaluate the implementation of ICT applications in public service organizations, which is responsible for the implementation of public policy. The study examined the success of ICT in achieving its goals by meeting the main needs of the community members which is the first requirement in the success of sustainable development plans before determine the capabilities of ICT. The main pillar of success in the implementation of ICT systems is the key to improving the efficiency of the organization's performance. This is a reflection of the effectiveness and quality of the services provided to its beneficiaries. The study concluded that the current level of capabilities of individuals working in public organizations i

... Show More
View Publication Preview PDF
Scopus (1)
Scopus
Publication Date
Sun Mar 01 2020
Journal Name
Journal Of Engineering
Petrophysical Analysis of an Iraqi Gas Field (Mansuriya Gas Field)
...Show More Authors

Mansuriya Gas field is an elongated anticlinal structure aligned from NW to SE, about 25 km long and 5-6 km wide. Jeribe formation is considered the main reservoir where it contains condensate fluid and has a uniform thickness of about 60 m. The reservoir is significantly over-pressured, (TPOC, 2014).

This research is about well logs analysis, which involves the determination of Archie petrophysical parameters, water saturation, porosity, permeability and lithology. The interpretations and cross plots are done using Interactive Petrophysics (IP) V3.5 software.

The rock parameters (a, m and n) values are important in determining the water saturation where (m) can be calcul

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Mar 03 2023
Journal Name
Iraqi Journal Of Science
The effect of background argon gas pressure on parameters of plasma produced by Dc- glow discharge
...Show More Authors

Non-thermal plasmas have become popular as plasma technology has advanced in various fields, including waste management, aerospace technology, and medicinal applications. They can be used to replace combustion fuels in stationary hall motors and need little effort to keep running for longer periods of time. To improve overall system performance, non-reactive gases such as )Xe, Ar, and Kr) are utilized in pure or mixed form to generate plasma. Since DC glow discharge is a fundamental topic of importance, these gases have been researched. The paper concentrates on 2-D modeling and simulation. DC glow-discharge tubes are utilized with argon gas to create plasma and learn about its properties. The magnitude of the electron density, increases wi

... Show More
Publication Date
Sat Jan 01 2011
Journal Name
Iraqi Journal Of Physics
Single Particle Level Density in a Harmonic – Oscillator Potential Well
...Show More Authors

The purpose of this paper is to study the properties of the
partial level density ( ) l g and the total level density g ( ),
numerically obtained as a l sum of ( ) l g up to 34 max l  , for
a Harmonic – Oscillator potential well. This method applied the
quantum – mechanical phase shift technique and concentrated
on the continuum region. Also a discussion of peculiarities of
quantal calculation for single particle level density of energy –
dependent potential

View Publication Preview PDF
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Study the Effect of Catalyst -to- Oil Ratio Parameter (COR) on Catalytic Cracking of Heavy Vacuum Gas Oil
...Show More Authors

This work deals with the production of light fuel cuts of (gasoline, kerosene and gas oil) by catalytic cracking treatment of secondary product mater (heavy vacuum gas oil) which was produced from the vacuum distillation unit in any petroleum refinery. The objective of this research was to study the effect of the catalyst -to- oil ratio parameter on catalytic cracking process of heavy vacuum gas oil feed at constant temperature (450 °C). The first step of this treatment was, catalytic cracking of this material by constructed batch reactor occupied with auxiliary control devices, at selective range of the catalyst –to- oil ratio parameter (  2, 2.5, 3 and 3.5) respectively.  The conversion of heavy vacuum gas

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling projects using dynamic programming style and smart algorithm
...Show More Authors

The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.

It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed 

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 01 2009
Journal Name
Baghdad Science Journal
Effect of Gamma Rays on Some Stages of Development of Rhyzopertha dominica (Fab.)
...Show More Authors

The effect of different doses of gamma rays that emitted from 60Co on the development of different stages of lesser grain borer Rhyzopertha dominica (Fab.) was investigated . The results showed that the eggs in both early (1-3 days) and late (7-9) old were very sensitive to gamma rays and its hatch was zero at 10 Gy for both ages in comparison with 83.3% for the control group. Furthermore, the results illustrated that the larval stage in its two old ages were different in the radiosensitivity, the percent of its death were 100% & 96.6% when they exposed to 100 & 120 Gy, respectively. Moreover, the results showed that the sensitivity of pupal stage at age of 1-3 days was increased with increasing the doses of gamma rays, the percent of no

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 30 2014
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Design of Horizontal Well Program for Ajeel Field
...Show More Authors

Horizontal wells are of great interest to the petroleum industry today because they provide an attractive means for improving both production rate and recovery efficiency. The great improvements in drilling technology make it possible to drill horizontal wells with complex trajectories and extended for significant depths.
The aim of this paper is to present the design aspects of horizontal well. Well design aspects include selection of bit and casing sizes, detection of setting depths and drilling fluid density, casing, hydraulics, well profile, and construction of drillstring simulator. An Iraqi oil field (Ajeel field) is selected for designing horizontal well to increase the productivity. Short radius horizontal well is suggested fo

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and acc

... Show More
View Publication Preview PDF
Crossref