The existing study aimed to assess four soil moisture sensors’ capacitive (WH51 and SKU: S EN0193) and resistive (Yl69 and IC Station) abilities, which are affordable and medium-priced for their accuracy in six common soil types in the central region of Iraq. The readings’ calibration for the soil moisture sensor devices continued through two gravimetric methods. The first depended on the protocols’ database, while the second was the traditional calibration method. The second method recorded the lowest analysis error compared with the first. The moderate-cost sensor WH51 showed the lowest standard error (SE), MAD , and RMSE and the highest R² in both methods. The performance accuracy of WH51 was close to readings shown by the manufacturing company (1%), as the MAD amounted to 1.62%. Through both methods, the average MAD for sensors ranged from 4.76% to 7.36%, with this result considered acceptable, especially for low-cost sensors with insufficient available information for accuracy. In general, the average mean absolute percentage (MAPE) for all sensors was 25.54%, which means that the validity of the measurement for the l ow-cost sensors reached 7 5%. It encourages their use by plant breeders in irrigation, as the error rate was less than the specified depletion of 50% for available water in irrigation, where all study textures showed that the sensor reading reached the limits of 72 (±2), adopting 3% MAD for all sensors. The study affirms that, except for the IC station sensor recommended for irrigation use only in sandy-sandy loam soils, low-cost sensors have suitable accuracy for irrigation management.
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
The development of human resources training programs can assist in agreat deal in creating products of high quality with quantitive advantage for the economicunit;through the sale of products by prices higher of the peer products price in the arket,or decreasing production costs which lead into increusing the unet profits. for these reasons, the human resources have got great importance for their great role in any economy,and they havestarled to consentrate on accounting these resource.From this point of view, this research has handied human resources accounting and their effect on quality costs. In(MID-Refinery Company),quality costs are determined ,then we have larified the reality of training and development in the o
... Show MoreAn excellent reputation earned by initiating and practicing sustainable business practices has additional benefits, of which are reducing environmental incidents and an improvement in operational efficiency as this has the potential to help firms improve on productivity and bring down operating costs. Taken further, with ever-increasing socially and environmentally-conscious investors and the public alike, this act of natural resources management could have a significant implication on market value and income of the practicing firms.
The above proposition has been supported by sustainable business practices literature that is continuously conversing and deliberating upon the impact of efficient resource d
... Show MoreIn this paper, a method based on modified adomian decomposition method for solving Seventh order integro-differential equations (MADM). The distinctive feature of the method is that it can be used to find the analytic solution without transformation of boundary value problems. To test the efficiency of the method presented two examples are solved by proposed method.
هناك دائما حاجة إلى طريقة فعالة لتوليد حل عددي أكثر دقة للمعادلات التكاملية ذات النواة المفردة أو المفردة الضعيفة لأن الطرق العددية لها محدودة. في هذه الدراسة ، تم حل المعادلات التكاملية ذات النواة المفردة أو المفردة الضعيفة باستخدام طريقة متعددة حدود برنولي. الهدف الرئيسي من هذه الدراسة هو ايجاد حل تقريبي لمثل هذه المشاكل في شكل متعددة الحدود في سلسلة من الخطوات المباشرة. أيضا ، تم افتراض أن مقام النواة
... Show MoreIn the present research, a crane frame has been investigated by using finite element method. The damage is simulated by reducing the stiffness of assumed elements with ratios (10% and 20 %) in mid- span of the vertical column in crane frame. The cracked beam with a one-edge and non-propagating crack has been used. Six cases of damage are modeled for crane frame and by introducing cracked elements at different locations with ratio of depth of crack to the height of the beam (a/h) 0.1, 0.20. A FEM program coded in Matlab 6.5 was used to model the numerical simulation of the damage scenarios. The results showed a decreasing in the five natural frequencies from undamaged beam which means
... Show More