Portland Cement is manufactured by adding 3% gypsum to clinker which is produced by grinding, pulverizing, mixing, and then burning a raw mix of silica, and calcium carbonate. Limestone is the main source of carbonates, while clay collected from arable land is the main source of silica. The marl in the Euphrates Formation was studied as an alternative to arable lands. Nine boreholes drilled and penetrated the marl layer in selected locations at the Kufa cement quarry. Forty-one samples of marl from boreholes and four samples of limestone from the closed area were collected. The chemical content of the major oxides and the hardness of the marl layer was very encouraging as a raw material for Portland Cement as they are SiO2 (17.60), CaO (37.89), MgO (1.94), Fe2O3 (2.47), Al2O3 (4.21), K2O (0.731), SO3 (0.35), and Na2O (0.062). The marl was used in designing a raw material mix suitable for rotary kiln feed and produced a clinker conforming to the approved specifications. The designing a raw mix consisting of 80.30% of marl with 19.70% of limestone. The investment of the marl layer can be used as an ideal alternative to the arable clay giving fit quality to the international specifications, reducing production costs during quarry operations, reducing the energy consumption and equipment wearing.
The current study was to examine the reliability and effectiveness of using most abundant, inexpensive waste in the form of scrap raw zero valent aluminum ZVAI and zero valent iron ZVI for the capture, retard, and removal of one of the most serious and hazardous heavy metals cadmium dissolved in water. Batch tests were conducted to examine contact time (0-250) min, sorbent dose (0.25-1 g ZVAI/100 mL and 2-8 g ZVI/100 mL), initial pH (3-6), pollutant concentration of 50mg/L initially, and speed of agitation (0-250) rpm . Maximum contaminant removal efficiency corresponding to (90 %) for cadmium at 250 min contact time, 1g ZVAI/ 6g ZVI sorbent mass ratio, pH 5.5, pollutant concentration of 50 mg/L initially, and 250 rpm agitation speed wer
... Show MoreIntestinal parasites present in freshwater from the Al- Fallujah, Al- Habbaniyah and Al-Alwarar, of the Euphrates river in Iraq are Cryptosporidium spp (25.3%), Giardia sp (3.3%), Eimeria sp (3.3%), Pinworm eggs (3.3%), Naegleria sp (15.3%), Lecane niwati (1.3%), Trichomonas hominis (19.3%), Acanthamoeba spp (24.6%), Entamoeba coli (20.6%), Balantidium coli (12%), Ascaris sp (3.3%), Volvox sp (26%), Chilomastix mesnili (4%), Pelomyxa palustris (2.6%), Trinema enchelys (2.6%), Actinophrys Sol (7.3%), Amobea Vespertilio (9.3%), Rhabditea (5.3%), paramecium bursaria (9.3%), cyst of cestode (6%), Oocyst protozoa (16%), Euglena gracilis (10.6%).were isolated. The study's goal was to isolate some of the parasites that pollute the Euphrat
... Show MoreIn this research design was treated gap laser mathematically and practically Bashaddam model Raasi simple and new and we have found that there is a good match in the practical and theoretical results
There are many problems facing the economic entities as a result of its mass production &variation of its products , the matter which had increased the need & importance of cost accounting which is regarded a main tool for the managerial control.
The actual costing system is unable to meet the contemporary management needs ,so the Standard costing system appear to provide the management with required information to perform its functions by the best use& way.
This research aims to determine the standard cost for the direct material for oil extraction activity by applying it in the north oil company.
The Jeribe Formation, the Jambour oil field, is the major carbonate reservoir from the tertiary reservoirs of the Jambour field in northern Iraq, including faults. Engineers have difficulty organizing carbonate reserves since they are commonly tight and heterogeneous. This research presents a geological model of the Jeribe reservoir based on its facies and reservoir characterization data (Permeability, Porosity, Water Saturation, and Net to Gross). This research studied four wells. The geological model was constructed with the Petrel 2020.3 software. The structural maps were developed using a structural contour map of the top of the Jeribe Formation. A pillar grid model with horizons and layering was designed for each zone. Followin
... Show MoreStudied the environment and fish life Qattan in the Euphrates River in central Iraq for the period from September 2002 until 2003 recorded the lowest temperature of the water during the month of January during the month of August ranged salinity ranges between 068
Roller compacted concrete (RCC) is a special type of concrete with zero or even negative slump consistency. In this work, it had aimed to produce an RCC mix suitable for roads paving with minimum cost and better engineering properties so, different RCC mixes had prepared i.e. (M1, M2, M3, and M4) using specified percentages of micro natural silica sand powder (SSP) as partial replacement of (0%, 5%, 10%, and 20%) by weight of sulfate resistant Portland cement. Additionally, M-sand, crushed stone, filler, and water had been used. The results had obtained after 28 days of water curing. The control mix (M1) had satisfied the required