This study experimentally investigated Free-Fall Gravity Drainage (FFGD) under combination-drive conditions in a two-dimensional Hele-Shaw model representing a water-drive reservoir. An initially high gravity potential from the oil column enabled early oil drainage before aquifer support became dominant. Three water-drive strengths were tested, demonstrating that a stronger aquifer (1.15 psig) accelerated oil recovery to approximately 75% of the original oil in place (OOIP) within 60 minutes, resulting in a final recovery of 79.5%. However, this was accompanied by rapid water breakthrough after 2.5 minutes and high-water cuts exceeding 90%. In contrast, a weaker aquifer (0.725 psig) stabilized the oil–water contact, delaying water encroachment and maintaining zero water cut throughout 240 minutes, albeit with a lower ultimate recovery of 70.2%. Visual observations confirmed that a stable water crest and oil bank were preserved longer under moderate to weak aquifer pressures, extending the gravity-dominated recovery and reducing water handling requirements. Residual oil saturation was higher under weak aquifer support (27.9%) than stronger water drive (16.8%) due to a loss of gravity potential as the oil column declined and limited aquifer support. A comparative experiment in a heterogeneous system revealed approximately 22% lower ultimate recovery and water breakthrough within 5 minutes, attributed to heterogeneity promoting preferential flow, poor sweep efficiency, and early breakthrough. In contrast, the homogeneous system sustained production with no water breakthrough for 300 minutes. These insights strengthen the understanding of gravity drainage and can help guide enhanced oil recovery strategies in water-drive reservoirs.
Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreWaveform transport of Pseudo plastic fluid in complaint symmetric channel with culvature properties has designed. The efforts of magnetic force, which has applied by radiate direction in the analysis, is considered by using the influence of Hartmann number. Walls properties with slip conditions on velocity distribution as well as stream function are used. The analysis of" heat and mass transfer" has taken into account. More popularized factual constraints known by the convective conditions are applied. The partial differential equations of motion, temperature and concentration is reduced under the simulation of low quantity of wave number and Reynolds number and then transformed to or
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreThe permeability determination in the reservoirs that are anisotropic and heterogeneous is a complicated problem due to the limited number of wells that contain core samples and well test data. This paper presents hydraulic flow units and flow zone indicator for predicting permeability of rock mass from core for Nahr-Umr reservoir/ Subba field. The Permeability measurement is better found in the laboratory work on the cored rock that taken from the formation. Nahr-Umr Formation is the main lower cretaceous sandstone reservoir in southern of Iraq. This formation is made up mainly of sandstone. Nahr-Umr formation was deposited on a gradually rising basin floor. The digenesis of Nahr-Umr sediments is very important du
... Show MoreThe Makhoul Dam project proposed to be established is considered one of the strategic projects in Iraq as it works to insurance large quantity of water spare in flood seasons, increase the storage capacity of the dams in Iraq, as well as increase food security. The Makhool Dam is located on Tigris River in Salah al-Din Governorate, and 8 km south of the meeting point of the Tigris River with the Lower Zab River. The lake area is about 256 km2. In this research, a mathematical model was prepared by using HEC-RAS Two Dimension Software to analyze the velocity patterns and water depths inside makhool dam reservoir at the highest operational water elevation, based on the designs prepared
The aim of the present work is to develop a new class of natural fillers based polymer composites with sawdust (S.D) which used two particle sizes (1.2 μm & 2.3 μm) and different weight percentage from sawdust (10%, 15%, and 20%). The mechanical properties studied include hardness (shore D) for all samples at normal conditions (N.C). The unsaturated polyester (UPE) and its composites samples were immersed in water for 30 days to find the effect of particle size of sawdust (S.D) on the weight gain (Mt %) by water for all the samples, also to find the effect of water on their hardness. The results show that the composite materials of sawdust (S.D) fillers which has particle size (1.2 μm) better than (2.3 μm) particle size bef
... Show MoreThe objective of the present work was to estimate water requirements and water use efficiency for Broccoli under normal irrigation conditions and sewage irrigation. Field experiment was carried out during the season 2018 at station/Sulaimni agricultural station/Bakrajo –College of Agricultural Sciences. The experiment included three treatments: River water irrigation in all season growth (I1), Sewage water irrigation in all season growth (I2), Alternate irrigation (one river irrigation followed by two sewage water irrigation) in all season growth (I3). The experimental Design was Randomized Complete Block Design (RCBD) w
Some major pollutants of polycyclic aromatic hydrocarbons (PAH) those discharged as water produced (WP) from the AlAhdab oil field (AOF) in the ponds close to it may leak to the water resources around and eventually reaches the marshes which will affect its ecosystem. Thus, this work aims to track the availability of PAH in the water resources and the Main Outfall Drain (MOD) nearby. The determination of PAH was evaluated using “High-Performance Liquid Chromatography (HPLC)”. The mean concentration of sixteen PAH in the produced water within the field was relatively high (0.01 to 10.89 g/ml) with standard deviations of (0.10.9). While, PAH outside the field were gradually diminishes down to (0.01-0.039) x10-2 g/ml which exceeds th
... Show More