Exploitation of mature oil fields around the world has forced researchers to develop new ways to optimize reservoir performance from such reservoirs. To achieve that, drilling horizontal wells is an effective method. The effectiveness of this kind of wells is to increase oil withdrawal. The objective of this study is to optimize the location, design, and completion of a new horizontal well as an oil producer to improve oil recovery in a real field located in Iraq. “A” is an oil and gas condensate field located in the Northeast of Iraq. From field production history, it is realized the difficulty to control gas and water production in this kind of complex carbonate reservoir with vertical producer wells. In this study, a horizontal well design with multi-stage completion is studied and proposed to find optimal oil recovery in the southeast region of the selected field. A bulk oil well sector model is used to simulate the fluid flow of a single-porosity/single-permeability model. Then, a sensitivity analysis has been run to optimize; the well trajectory path, different scenarios on well oil and water production potential, and well completion design. The result of the well sector simulation indicates that the well trajectory with an Azimuth of 89 degrees and with a multi-stage completion design has better production performance under water production constraints. Optimum oil production rates of 1000 to 2000 STB/day, as delaying and controlling early gas and water production challenges is achieved.
Human resources constitute the most important recourses that the organization owned today, as it may have developed financial and technology resources to achieve their goals, but they are not able to use it with required efficiency and effective and quality desired unless there is human resources that have good skills, experiences and talents that able to directing and exploited ideally that compatible with market requirements, where today's market and business organizations which compete naturally inherent talent, so the task is to attracting and developing talented resources and preservation these talented resources from the challenges that facing organizations.
The research seek to achieve
... Show MoreThe purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
The research topic was chosen because of the importance of communication in organizations in general and the marketing process in particular. Without communication, the organization can not live and continue ,The problem of study diagnosis the reduction in sales in the company of plant oils in some its classes and weakness in differentiation and its reputation at market in spit if having good products with standardized features And lack of customer communication channels, also the company does not have any whole view about the concept of marketing communication, Therefore, This sudy aimed ro define to know the type of relationship between the extent of the impact of the integrated marketing
... Show MoreThe research aims to determine the impact of Human Resources Accounting (HRA) on employee’s performance. The research’s problem was embodied in the lack of interest in HRA, which was reflected on the performance of employees in the Ministry of Education; the research adopted the descriptive-analytical approach, and the research community included the directors of departments and people at the headquarters of the Ministry of Education. The sample size was (224) individuals from the total community of 533. The questionnaire was adopted as the main tool for collecting data and information, as well as the interviews that were conducted by the researcher. In order to analyze t
... Show MoreExperimental study on the effect of cylindrical hollow cathode, working pressure and magnetic field on spatial glow distribution and the characteristics of plasma produced by dc discharge in Argon gas, were investigated by image analyses for the plume within the plasma. It was found that the emission intensity appears as a periodic structure with many peaks appeared between the electrodes. Increasing the pressure leads to increase the number of intensity peaks finally converted to continuous form at high pressure, especially with applied of magnetic field, i.e. the plasma is more stable with the presence of magnetic field. The emission intensity study of plasma showed that the intensity has a maximum value at 1.07 mbar pressure and decre
... Show MoreThe main problem of this research is the delay of implementation of the investment plan projects for the period (2013-2016) and the weakness of the staff ability in the ministries and they don’t have the sufficient experience to carry out the implementation process.
Therefore, the research aims to evaluate the implementation of programs and projects of the investment plan in a manner consistent with the objectives set for them without any wasteful of efforts, time and money. And then identify the problems and obstacles to determine the deviations of the implementation of the specific for each sector according to the criteria of evaluation and the form of cost, quality, time and implementation.<
... Show MoreThe Khabour reservoir, Ordovician, Lower Paleozoic, Akkas gas field which is considered one of the main sandstone reservoirs in the west of Iraq. Researchers face difficulties in recognizing sandstone reservoirs since they are virtually always tight and heterogeneous. This paper is associated with the geological modeling of a gas-bearing reservoir that containing condensate appears while production when bottom hole pressure declines below the dew point. By defining the lithology and evaluating the petrophysical parameters of this complicated reservoir, a geological model for the reservoir is being built by using CMG BUILDER software (GEM tool) to create a static model. The petrophysical properties of a reservoir were computed using
... Show More