Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
ان الرأسمالية ليست بناءً هندسياً يتم انتظامه وفقاً للنظريات الهندسية والمعادلات الرياضية والفنون المعمارية، لأنها ببساطة نظاماً اجتماعياً يقوم على تشكيلة اقتصادية معينة، والأخيرة تقوم على مستوى معين لتطور قوى الانتاج (التكنولوجيا) والذي يقوم عليه مستوىً معين لعلاقات الإنتاج، ويقوم على التشكيلة الاقتصادية/ نمط الإنتاج نظاماً سياسياً، هو جزء من البناء الفوقي، ولأنها نظاماً اجتماعياً بالمواصفات انفة
... Show MorePhysics and applied mathematics form the basis for understanding natural phenomena using differential equations depicting the flow in porous media, the motion of viscous liquids, and the propagation of waves. These equations provide a thorough study of physical processes, enhancing the understanding of complex applications in engineering, technology, and medicine. This paper presents novel approximate solutions for the Darcy-Brinkmann-Forchheimer moment equation, the Blasius equation and the FalknerSkan equation with initial / boundary conditions by using two iterative methods: the variational iteration method and the optimal variational iteration method. The variational iteration method is effectively developed by adding a control paramete
... Show MoreThe research is trying to identify the investment portfolio risks of the insurance company and their impact, on the Profitability ratios of the company, and whether the company's scientific methods followed in the measurement of these risks, and conducted research in the National Insurance Company. by relying on its annual budget as well as the annual reports, The search dealing with these data in theoretical and practical major premise to statistically significant between to investment portfolio risk and financial performance correlation and reach a set of conclusions and recommendations which are the following.
investments include many ri
... Show MoreA substantial percentage of the world’s energy consumption (almost 40%) and carbon dioxide (CO2) emissions (around 37%) come from the construction industry, especially schools. This work presents a new hybrid artificial intelligence (AI) engineering model that aims to maximize energy performance on campuses in a holistic way. Modules for data-driven forecasting, metaheuristic optimization, and real-time adaptive control are all part of the concept. A thorough energy simulation of a university campus building is used in conjunction with the AI model to assess its performance through a co-simulation framework. Findings show that yearly peak electricity demand may be reduced by 18.7% and total site energy consumption by 22.4% when co
... Show MoreThis paper demonstrates the construction designing analysis and control strategies for fully tracking concentrated solar thermal by using programmable logic control in the city of Erbil-Iraq. This work used the parabolic dish as a concentrated solar thermal. At the focal point, the collected form of energy is used for heating a (water) in the receiver, analyzing this prototype in real-time with two different shapes of the receiver and comparing the results. For tracking the parabolic dish, four light-dependent resistors are used to detect the sun's position in the sky so that the tracking system follows it to make the beam radiation perpendicular to the collector surface all of the time during the day for maximum solar p
... Show MoreThe aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show MoreAbstract:
Organizations need today to move towards strategic innovation, which means the analysis of positions, especially the challenges faced by the change in the external environment, which makes it imperative for the organization that you reconsider their strategies and orientations and operations, a so-called re-engineering to meet those challenges and pressures. Now this research dilemma intellectual two-dimensional, yet my account in not Take writings and researchers effect strategic innovation in re-engineering business processes, according to science and to inform the researcher, and after the application represented in the non-application of such resear
... Show More