Transient drop in the heart beat or transient heart block (AVB) may be consider the main cause of syncope or presyncope inpatients with bifascicular block and syncope According to the Guidelines for cardiac pacing pacemaker consider part of treatment. Aims of our study were to evaluate whether there is role for EPS in patients BFB and to evaluate the symptoms after pacing. 42 patients were enrolled in this study, with mean age value (63.4± 12.2years), suffer from interventricular conductive defect and syncope; patients underwent EPS on admission time, and pacemaker implantation accordingly and programmed follow up for the device in the last four years. Our patients were 25 (59.5%) male and 17 (40.5%)female, all of them with syncope or presncope and good left ventricular systolic function and the left ventricular ejection fraction (LVEF ≥55%). Left bundle branch block was found in 28 (66.71%) patients, while right bundle branch block were found in,14 (33.3) of them, the result of the EPS was find the cut of HV interval for pacing which represent that that the threshold at level of 75 have a sensitivity of 91% and specificity of 80%. The greater HV intervals gave more successful results for pacing. Pacemaker was implanted in 27 (64.3%) of the patients, with significant relation between pacing and syncope disappeared after pacemaker implantation (p value 000) and in 15 (35.7%) no pacemaker was implanted with persistent symptoms. Pacing were more between patients with coronary artery disease and LBBB with abnormal EPS finding. Permanent pacemaker implantation can implant directly in those old patients with syncope and bifascicular block that associated with LBBB and coronaries artery diseases without or before EP study
An analytical approach based on field data was used to determine the strength capacity of large diameter bored type piles. Also the deformations and settlements were evaluated for both vertical and lateral loadings. The analytical predictions are compared to field data obtained from a proto-type test pile used at Tharthar –Tigris canal Bridge. They were found to be with acceptable agreement of 12% deviation.
Following ASTM standards D1143M-07e1,2010, a test schedule of five loading cycles were proposed for vertical loads and series of cyclic loads to simulate horizontal loading .The load test results and analytical data of 1.95
... Show MoreIn general, path-planning problem is one of most important task in the field of robotics. This paper describes the path-planning problem of mobile robot based on various metaheuristic algorithms. The suitable collision free path of a robot must satisfies certain optimization criteria such as feasibility, minimum path length, safety and smoothness and so on. In this research, various three approaches namely, PSO, Firefly and proposed hybrid FFCPSO are applied in static, known environment to solve the global path-planning problem in three cases. The first case used single mobile robot, the second case used three independent mobile robots and the third case applied three follow up mobile robot. Simulation results, whi
... Show MoreThis research includes the using of statistical to improve the quality of can plastics which is produced at the state company for Vegetable oils (Almaamon factory ) by using the percentage defective control chart ( p-chart ) of a fixed sample. A sample of size (450) cans daily for (30) days was selected to determine the rejected product . Operations research with a (win QSB ) package for ( p-chart ) was used to determine test quality level required for product specification to justify that the process that is statistically controlled.
The results show high degree of accuracy by using the program and the mathematical operations (primary and secondary ) which used to draw the control limits charts and to reject the statistically uncontr
Both the double-differenced and zero-differenced GNSS positioning strategies have been widely used by the geodesists for different geodetic applications which are demanded for reliable and precise positions. A closer inspection of the requirements of these two GNSS positioning techniques, the zero-differenced positioning, which is known as Precise Point Positioning (PPP), has gained a special importance due to three main reasons. Firstly, the effective applications of PPP for geodetic purposes and precise applications depend entirely on the availability of the precise satellite products which consist of precise satellite orbital elements, precise satellite clock corrections, and Earth orientation parameters. Secondly, th
... Show MoreA novel demountable shear connector is proposed to link a concrete slab to steel sections in a way that resulting steel-concrete composite floor is demountable, i.e. it can be easily dismantled at the end of its service life. The proposed connectors consist of two parts: the first part is a hollow steel tube with internal threads at its lower end. The second part is a compatible partially threaded bolted stud. After linking the stud to the steel section, the hollow steel tube can be fastened over the threaded stud, which create a complete demountable shear connector. The connector is suitable for use in both composite bridges and buildings, and using cast in-situ slabs, precast solid slabs, or hollow-core precast slabs. A series of push-off
... Show MoreThis paper deals with load-deflection behavior the jointed plain concrete pavement system using steel dowel bars as a mechanism to transmit load across the expansion joints. Experimentally, four models of the jointed plain concrete pavement system were made, each model consists of two slabs of plain concrete that connected together across expansion by two dowel bars and the concrete slab were supported by the subgrade soil. Two variables were dealt with, the first is diameter of dowel bar (12, 16 and 20 mm) and the second is type of the subgrade soil, two types of soil were used which classified according to the (AASHTO): Type I (A-6) and type II (A-7-6). Experimental results showed that increasing dowel bar diameter from 12 mm to 20 mm
... Show MoreThis paper discusses an optimal path planning algorithm based on an Adaptive Multi-Objective Particle Swarm Optimization Algorithm (AMOPSO) for two case studies. First case, single robot wants to reach a goal in the static environment that contain two obstacles and two danger source. The second one, is improving the ability for five robots to reach the shortest way. The proposed algorithm solves the optimization problems for the first case by finding the minimum distance from initial to goal position and also ensuring that the generated path has a maximum distance from the danger zones. And for the second case, finding the shortest path for every robot and without any collision between them with the shortest time. In ord
... Show MoreThis study included the extraction properties of spatial and morphological basins studied using the Soil and Water Assessment Tool (SWAT) model linked to (GIS) to find the amount of sediment and rates of flow that flows into the Haditha reservoir . The aim of this study is determine the amount of sediment coming from the valleys and flowing into the Haditha Dam reservoir for 25 years ago for the period (1985-2010) and its impact on design lifetime of the Haditha Dam reservoir and to determine the best ways to reduce the sediment transport. The result indicated that total amount of sediment coming from all valleys about (2.56 * 106 ton). The maximum annual total sediment load was about (488.22 * 103 ton) in year 1988
... Show MoreA two time step stochastic multi-variables multi-sites hydrological data forecasting model was developed and verified using a case study. The philosophy of this model is to use the cross-variables correlations, cross-sites correlations and the two steps time lag correlations simultaneously, for estimating the parameters of the model which then are modified using the mutation process of the genetic algorithm optimization model. The objective function that to be minimized is the Akiake test value. The case study is of four variables and three sites. The variables are the monthly air temperature, humidity, precipitation, and evaporation; the sites are Sulaimania, Chwarta, and Penjwin, which are located north Iraq. The model performance was
... Show More