Transient drop in the heart beat or transient heart block (AVB) may be consider the main cause of syncope or presyncope inpatients with bifascicular block and syncope According to the Guidelines for cardiac pacing pacemaker consider part of treatment. Aims of our study were to evaluate whether there is role for EPS in patients BFB and to evaluate the symptoms after pacing. 42 patients were enrolled in this study, with mean age value (63.4± 12.2years), suffer from interventricular conductive defect and syncope; patients underwent EPS on admission time, and pacemaker implantation accordingly and programmed follow up for the device in the last four years. Our patients were 25 (59.5%) male and 17 (40.5%)female, all of them with syncope or presncope and good left ventricular systolic function and the left ventricular ejection fraction (LVEF ≥55%). Left bundle branch block was found in 28 (66.71%) patients, while right bundle branch block were found in,14 (33.3) of them, the result of the EPS was find the cut of HV interval for pacing which represent that that the threshold at level of 75 have a sensitivity of 91% and specificity of 80%. The greater HV intervals gave more successful results for pacing. Pacemaker was implanted in 27 (64.3%) of the patients, with significant relation between pacing and syncope disappeared after pacemaker implantation (p value 000) and in 15 (35.7%) no pacemaker was implanted with persistent symptoms. Pacing were more between patients with coronary artery disease and LBBB with abnormal EPS finding. Permanent pacemaker implantation can implant directly in those old patients with syncope and bifascicular block that associated with LBBB and coronaries artery diseases without or before EP study
The current research aims to measure the job satisfaction of educational counselors in the general directorate of education of the second Rusafa in the ministry of education of Iraq. Moreover, it aims to identify the significant differences in job satisfaction according to the gender (Male-Female), the length of service (less than 15 years more than 15 years), and the relationship between these two variables. To achieve the objectives of the research, the researcher developed a scale to measure job satisfaction. This tool was applied to sample of (100) educational counselors selected randomly. The results showed that educational counselors have job satisfaction, in which males are more satisfied in their job than females. The results als
... Show MoreThe operation and management of water resources projects have direct and significant effects on the optimum use of water. Artificial intelligence techniques are a new tool used to help in making optimized decisions, based on knowledge bases in the planning, implementation, operation and management of projects as well as controlling flowing water quantities to prevent flooding and storage of excess water and use it during drought.
In this research, an Expert System was designed for operating and managing the system of AthTharthar Lake (ESSTAR). It was applied for all expected conditions of flow, including the cases of drought, normal flow, and during floods. Moreover, the cases of hypothetical op
... Show MoreThe parameters of resistance spot welding (RSW) performed on low strength commercial aluminum sheets are investigated experimentally, the performance requirements and weldability issues were driven the choice of a specific aluminum alloy that was AA1050. RSW aluminum alloys has a major problem of inconsistent quality from weld to weld comparing with welding steel
alloys sheet, due to the higher thermal conductivity, higher thermal expansion, narrow plastic temperature range, and lower electrical resistivity. Much effort has been devoted to the study of describing the relation between the parameters of the process (welding current, welding time, and electrode force) and weld strength. Shear-tensile strength tests were performed to ind
A multivariate multisite hydrological data forecasting model was derived and checked using a case study. The philosophy is to use simultaneously the cross-variable correlations, cross-site correlations and the time lag correlations. The case study is of two variables, three sites, the variables are the monthly rainfall and evaporation; the sites are Sulaimania, Dokan, and Darbandikhan.. The model form is similar to the first order auto regressive model, but in matrices form. A matrix for the different relative correlations mentioned above and another for their relative residuals were derived and used as the model parameters. A mathematical filter was used for both matrices to obtain the elements. The application of this model indicates i
... Show MoreThis paper is concerned with finding the approximation solution (APPS) of a certain type of nonlinear hyperbolic boundary value problem (NOLHYBVP). The given BVP is written in its discrete (DI) weak form (WEF), and is proved that it has a unique APPS, which is obtained via the mixed Galerkin finite element method (GFE) with implicit method (MGFEIM) that reduces the problem to solve the Galerkin nonlinear algebraic system (GNAS). In this part, the predictor and the corrector technique (PT and CT) are proved convergent and are used to transform the obtained GNAS to linear (GLAS ), then the GLAS is solved using the Cholesky method (ChMe). The stability and the convergence of the method are studied. The results
... Show MoreArtificial pancreas is simulated to handle Type I diabetic patients under intensive care by automatically controlling the insulin infusion rate. A Backstepping technique is used to apply the effect of PID controller to blood glucose level since there is no direct relation between insulin infusion (the manipulated variable) and glucose level in Bergman’s system model subjected to an oral glucose tolerance test by applying a meal translated into a disturbance. Backstepping technique is usually recommended to stabilize and control the states of Bergman's class of nonlinear systems. The results showed a very satisfactory behavior of glucose deviation to a sudden rise represented by the meal that increase the blood glucose
... Show More
Conservative pipes conveying fluid such as pinned-pinned (p-p), clamped–pinned (c-p) pipes and clamped-clamped (c-c) lose their stability by buckling at certain critical fluid velocities. In order to experimentally evaluate these velocities, high flow-rate pumps that demand complicated fluid circuits must be used.
This paper studies a new experimental approach based on estimating the critical velocities from the measurement of several fundamental natural frequencies .In this approach low flow-rate pumps and simple fluid circuit can be used.
Experiments were carried out on two pipe models at three different boundary conditions. The results showed that the present approach is more accurate for est
... Show MoreThis paper presents a method of designing and constructing a system capable of acquiring
the third dimension and reconstructs a 3D shape for an object from multi images of that object using
the principle of active optical triangulation. The system consists of an illumination source, a photo
detector, a movement mechanism and a PC, which is working as a controlling unit for the hard ware
components and as an image processing unit for the object multi view raw images which must be
processed to extract the third dimension. The result showed that the optical triangulation method
provides a rapid mean for obtaining accurate and quantitative distance measurements. The final
result's analysis refers to the necessity of usin
A new de-blurring technique was proposed in order to reduced or remove the blur in the images. The proposed filter was designed from the Lagrange interpolation calculation with adjusted by fuzzy rules and supported by wavelet decomposing technique. The proposed Wavelet Lagrange Fuzzy filter gives good results for fully and partially blurring region in images.
This paper focuses on Load distribution factors for horizontally curved composite concrete-steel girder bridges. The finite-element analysis software“SAP2000” is used to examine the key parameters that can influence the distribution factors for horizontally curved composite steel
girders. A parametric study is conducted to study the load distribution characteristics of such bridge system due to dead loading and AASHTO truck loading using finite elements method. The key parameters considered in this study are: span-to-radius of curvature ratio, span length, number of girders, girders spacing, number of lanes, and truck loading conditions. The results have shown that the curvature is the most critical factor which plays an important